ABSTRACT







The importance of


accurate estimate during the early stage of cost planning of capital project


has been widely recognized for many years. Even so, very few quantitative method


are available that enable estimators and business managers to objectively


evaluate the accuracy of early estimates and planning. The primary purpose of


this study was to identify and examine the factors influencing cost planning of


building project in Gombe and Bauchi State as it relates to the Nigerian


Construction Industry. To accomplish this aim, quantitative data were collected


from consultant Quantity Surveyors. Each of the respondents was asked to assign


a one to ten rating for each of the 10 potential drivers of the estimates


accuracy for a given estimate. The data were analyzed using simple statistical


tools which include; mean, standard deviation and percentages were used to


represent the information. The study analysis identified 5 of the 10 factors


that were most significant at the level. In this finding the five factors, in


order of significance were most significance amount of information available,


time allowed  to prepare the estimate,


experience of the consultant team, complexity of the project, and bidding and


suitability/stability of the market. Cost estimating and planning is


fundamental part of the construction. The success or failure of a project is


dependent on the accuracy of several estimates throughout the course of the


project. Construction estimating is the compilation and analysis of many items


that influence and contribute to the cost of the project. Estimating which is


done before the physical performance of the work requires a detailed study and


careful analysis of the bidding document, in order to achieve the most accurate


estimate possible of the probable cost consistent with the bidding time


available  and the accuracy and


completeness of the information submitted. Overestimated or underestimated cost


has the potential to cause loss to local contracting companies.







 







 







 









 





FACTORS INFLUENCING THE COST PLANNING OF PUBLIC BUILDING PROJECT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0083
  • Access Fee: ₦5,000 ($14)
  • Pages: 89 Pages
  • Format: Microsoft Word
  • Views: 929
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Quantity Surveying
Project ID QUS0083
Fee ₦5,000 ($14)
No of Pages 89 Pages
Format Microsoft Word

Related Works

ABSTRACT The importance of accurate estimate during the early stage of cost planning of capital project has been widely recognized for many years. Even so, very few quantitative method are available that enable estimators and business managers to objectively evaluate the accuracy of early estimates and planning. The primary purpose of this study... Continue Reading
ABSTRACT The importance of accurate estimate during the early stage of cost planning of capital project has been widely recognized for many years. Even so, very few quantitative method are available that enable estimators and business managers to objectively evaluate the accuracy of early estimates and planning. The primary purpose of this study... Continue Reading
  ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal... Continue Reading
Call Us
whatsappWhatsApp Us