PROJECT EVALUATION AND REVIEW TECHNIQUE/CRITICAL PATH METHOD NETWORK SCHEDULING TECHNIQUE IN A BUILDING CONSTRUCTION PROJECT

  • Type: Project
  • Department: Project Management
  • Project ID: PRM0036
  • Access Fee: ₦5,000 ($14)
  • Pages: 226 Pages
  • Format: Microsoft Word
  • Views: 1.6K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT 

 

In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using Network Planning and Scheduling approach. We reviewed relevant past literature to ascertain the views of professionals in project management, and accordingly developed the complete Work Breakdown Structure, WBS, of the project into its minutest various activities with corresponding duration times and resources loading to arrive at the resulting Network Schedule. We carried out the analysis to determine the critical and other paths, earliest and latest start and finish times, floats resource/man power loading and smoothing and other critical indices. We showed that the potential problem of -he contractor, and in reality contractors, not using PERT/CPM Network technique led or would lead to project slip and time and cost overruns, all other things being equal. Finally, we re-examined and appraised the Bar/Gantt chart and PERT'CPM project planning techniques and recommended, in addition, efficient resource allocation/ scheduling method, use of experienced personnel and the application/use of personal computers with suitable programme packages to reduce the tedium of iterations. 

KEY WORDS 

Work Breakdown Structure; Scheduling; Network Structure; Critical Path; Project Evaluation and Review Technique; Building Construction Project; Lead and Lag time. 

 

PROJECT EVALUATION AND REVIEW TECHNIQUE/CRITICAL PATH METHOD NETWORK SCHEDULING TECHNIQUE IN A BUILDING CONSTRUCTION PROJECT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0036
  • Access Fee: ₦5,000 ($14)
  • Pages: 226 Pages
  • Format: Microsoft Word
  • Views: 1.6K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Project Management
Project ID PRM0036
Fee ₦5,000 ($14)
No of Pages 226 Pages
Format Microsoft Word

Related Works

ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
ABSTRACT Women are often the victims of dual personality which various writers, in their works often down play. Dual personality is when someone has two contrasting personality in them. This is the issue examined in this study from the standpoint of Yejide Kilanko’s Daughters Who Walk This Path and Yvonne Vera’s Opening Spaces which opines... Continue Reading
PATH ANALYSIS OF THE INFLUENCE OF PARENTAL SOCIOECONOMIC STATUS AND HOME EDUCATION ENVIRONMENT ON STUDENT ACADEMIC ACHIEVEMENT CHAPTER ONE INTRODUCTION Background of the Study In this era of globalization and technological revolution, education is considered as a first step for every human activity. Education plays a vital role in the development... Continue Reading
ABSTRACT Women are often the victims of dual personality which various writers, in their works often down play. Dual personality is when someone has two contrasting personality in them. This is the issue examined in this study from the standpoint of Yejide Kilanko’s Daughters Who Walk This Path and Yvonne Vera’s Opening Spaces which opines... Continue Reading
ABSTRACT This study is concerned with the design of a Decision Support System for finding the Shortest path to a destination. The objectives of the study is to determine the optimal shortest/fastest path to a given destination or optimal shortest distance/fastest time to a given destination amongst others. The shortest path algorithm used is... Continue Reading
ABSTRACT One of the important issues in the design of future generation high-speed networks is to provide differentiated services to different types of applications with various time constraints. In this paper, we study the problem of providing real-time service to either hard or soft real-time messages in conjunction with a normal transmission... Continue Reading
ABSTRACT One of the important issues in the design of future generation high-speed networks is to provide differentiated services to different types of applications with various time constraints. In this paper, we study the problem of providing real-time service to either hard or soft real-time messages in conjunction with a normal transmission... Continue Reading
Call Us
whatsappWhatsApp Us