ABSTRACT
The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A well structured questionnaire was distributed and 30 were retrieved out of 40 distributed for data collection. Frequency count / percentages and weighted mean (likert scale) were used to answer the research questions. It was concluded among other that; impact of effective building production management leads to successful building project delivery. Building production management; for quality assurance, utilization of labour and complete success in construction project supervision must be use at all time based on the conclusion drawn from the study, recommendations were made for the importance of effective building production management. 
TABLE OF CONTENTS 
CHAPTER ONE
Introduction 
1.0 Background of the study
1.1 Statement of the problem 
1.2 Purpose of the study 
1.3 Research question 
1.4 Scope of the study 
1.5 Limitations of the study 
1.6 Definition of terms 
1.7 Organization of the study 
CHAPTER TWO
2.0 Literature Review 
2.1 Types of pressure groups 
2.2 Pressure groups and democrats process in Nigeria 
2.3 Attitudes to and participation in the National democratic process 
2.4 Contributions of functional pressure group to the democratic process 
2.5 Obstacles to the effectiveness of pressure groups in the democratic process 
2.6 Summary of literature review 
2.7 Theoretical framework 
CHAPTER THREE
RESEARCH METHODOLOGY 
3.1 Design of the study 
3.2 Area of the study 
3.3 Population of the study 
3.4 Sample and sampling techniques 
3.5 Instrument for Data collection 
3.6 Reliability and validity of the instrument 
3.7 Distribution and retrieval of instruments 
3.8 Methods of Data analysis 
CHAPTER FOUR 
4.0 Data Presentation and Analysis 
4.1 Personal Data 
4.2 Analysis of research questions 
4.3 Findings 
CHAPTER FIVE
Summary, Conclusion and Recommendation 
5.1 Summary of findings 
5.2 Conclusion 
5.3 Recommendations 
5.4 suggestions or Further Research 
References 
CHAPTER ONE
1.0           INTRODUCTION
1.1.0        BACKGROUND TO THE STUDY
The Nigeria construction industry has witnessed continued growth at a phenomenal rate construction methods have witnessed changes with current trends tending towards industrialization,  mechanization, prefabrication and the authomation of all the processes involved in the erection and installation of structure Kashish C. (2016). All these require high management impact with the population explosion and continued demand for new building of all kinds couple with the infrastructural facilities there is the need for professional practitioners in the building industry to impart knowledge of production management toward construction planning at the design stage for successful building delivering with appropriate construction tools. Robert F.C. and Michael C.L. (2001)
A concept and contents of modern day construction work are changing in a complex direction, the indication is a clear need for professionals to improve on modern techniques for learning and practice. It is only in this way that the construction industry can meet challenges and responsibilities imposed upon it is an effective and efficient manner so as to ensure quality of production in the construction industry. This will not only offer better value for money to the client but will make profitability of the industry more stable for any building project to be successfully execute on site, the constructors must forcast, plan and put in place various production Management Documents (Builder’s documents).
Federal Government National Building Code (2006).
1.2   STATEMENT OF THE PROBLEMS
Bamisile (2004), the public at large, believe that most building product fails to offer value for money, construction projected are said to cast for much, take too long to complete and too prone to failure.

        Ibironke T.O. (2009), asserted that the problem experience in the course of managing the three parameters, manifest primarily art two point in the total building process, i.e at the interface between the client and designer and the interfaces between the designer and the constructor. 
IMPACT OF EFFECTIVE BUILDING PRODUCTION MANAGEMENT IN SUCCESSFUL BUILDING PROJECT DELIVERY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Building
  • Project ID: BLD0032
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 48 Pages
  • Methodology: Simple Percentage
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.7K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Building
Project ID BLD0032
Fee ₦5,000 ($14)
Chapters 5 Chapters
No of Pages 48 Pages
Methodology Simple Percentage
Reference YES
Format Microsoft Word

Related Works

CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal... Continue Reading
ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
EFFECTIVE DEVELOPMENT OF THE NIGERIA CAPITAL MARKET AS A PRE-REQUISITE FOR SUCCESSFUL IMPLEMENTATION OF THE NATION’S INVESTMENT PROGRAM ABSTRACT Paper examines various theoretical views about the role Nigeria capital market can play in the economy with a view to showing that the effective development of the market holds sway for the successful... Continue Reading
Abstract Recent researches have indicated that formal material management programs have the potential to yield significant organizational cost savings, yet small‐ and medium‐sized organizations may not feel that an integrated material management program is cost effective. The objective of this study is to assess the impact of material... Continue Reading
A CASE STUDY OF NEW NIGERIA BANK PLC LAGOS ABSTRACT This study centered on self organization and time Management skills on the job perforance of secretaries. Population under study was secretaries. Population under... Continue Reading
                  Chapter one Introduction A firm usually evaluates its working capital management whether small or medium. The sole motive of every business is to make profit. Many organization can be seen to have bee forced out of business simply because of... Continue Reading
OF HAMDALA HOTEL, KADUNA  Chapter one Introduction A firm usually evaluates its working capital management whether small or medium. The sole motive of every business is to make profit. Many organization can be seen to have bee forced out of business simply because of inadequate or... Continue Reading
ABSTRACT This research is based on the evaluation of working capital for the successful management of Hamdala Hotel. The research begin with the introduction which contains the background statement of the problems, objective, significance, scope limitation of the study and definitional of terms. Chapter two the research take a critical look at... Continue Reading
Call Us
whatsappWhatsApp Us