THE IMPACT OF PROJECT MANAGEMENT SERVICES ON BUILDING CONSTRUCTION PROJECT (A CASE STUDY OF IBADAN METROPOLIS)

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0072
  • Access Fee: ₦5,000 ($14)
  • Pages: 41 Pages
  • Format: Microsoft Word
  • Views: 960
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

   The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized. This is as a result of the importance of capital projects to the development of a young nation. This study investigated the impact of project management services on building construction. The study is a survey which utilizes cross-sectional design. In all 46 survey questionnaires were administered to construction stakeholders randomly selected in the Ibadan metropolis. Descriptive statistics was used for the analysis of data for the study. Result of the study revealed that there is no significant different in the perception of the construction professionals and other stakeholders about the impact of management services at the inception, design, tendering, construction and commissioning phases of construction project development.

        

THE IMPACT OF PROJECT MANAGEMENT SERVICES ON BUILDING CONSTRUCTION PROJECT (A CASE STUDY OF IBADAN METROPOLIS)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0072
  • Access Fee: ₦5,000 ($14)
  • Pages: 41 Pages
  • Format: Microsoft Word
  • Views: 960
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Quantity Surveying
Project ID QUS0072
Fee ₦5,000 ($14)
No of Pages 41 Pages
Format Microsoft Word

Related Works

ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
ABSTRACT Generally, the success of completing any building construction project is based on key performance indices such as timely delivery of project, construction period, defects as well as client satisfaction. However, what effect does the implementation of safety management practices has on building construction project success? This research... Continue Reading
ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
Research aim and objective Research question Research hypothesis Delimitation and Scope of the study Definition of Terms4 Chapter Two: Literature Review  The Construction Industry 6        Culture 6 Quality 8 Key performance indicators (KPI)9 Quality Culture9      Element of quality culture  Factors affecting the maintenance of quality... Continue Reading
This is my practical project report for Nebosh IGC3 that earned me Excellent grade.  With 25 hazards and 5 good practices. This report is based on the findings of ongoing renovation work in Shorooq building apartment contracted by Royal Way Services LLC Dubai. The aim is to evaluate Health and Safety practice such as working conditions and... Continue Reading
This is my practical project report for Nebosh IGC3 that earned me Excellent grade.  With 25 hazards and 5 good practices. This report is based on the findings of ongoing renovation work in Shorooq building apartment contracted by Royal Way Services LLC Dubai. The aim is to evaluate Health and Safety practice such as working conditions and... Continue Reading
            The lack of knowledge of the availability of some drugs in hospitals can affect the treatment of patients in hospitals. The hospital inventory management system is a system that maintains inventories of drugs, hospital accounting. It is stored in the system database, which helps the Hospital management, Staff, Doctors and... Continue Reading
Call Us
whatsappWhatsApp Us