FINDINGS OF ONGOING RENOVATION WORK IN SHOROOQ BUILDING APARTMENT CONTRACTED BY ROYAL WAY SERVICES LLC DUBAI (A PRACTICAL PROJECT)

  • Type: Project
  • Department: Environmental Science
  • Project ID: EVS0104
  • Access Fee: ₦5,000 ($14)
  • Pages: 27 Pages
  • Format: Microsoft Word
  • Views: 1.3K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

This is my practical project report for Nebosh IGC3 that earned me Excellent grade.  With 25 hazards and 5 good practices.

This report is based on the findings of ongoing renovation work in Shorooq building apartment contracted by Royal Way Services LLC Dubai. The aim is to evaluate Health and Safety practice such as working conditions and processes that are unsafe in order to provide recommendations where applicable and ensure compliances. 



FINDINGS OF ONGOING RENOVATION WORK IN SHOROOQ BUILDING APARTMENT CONTRACTED BY ROYAL WAY SERVICES LLC DUBAI (A PRACTICAL PROJECT)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Environmental Science
  • Project ID: EVS0104
  • Access Fee: ₦5,000 ($14)
  • Pages: 27 Pages
  • Format: Microsoft Word
  • Views: 1.3K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Environmental Science
Project ID EVS0104
Fee ₦5,000 ($14)
No of Pages 27 Pages
Format Microsoft Word

Related Works

This is my practical project report for Nebosh IGC3 that earned me Excellent grade.  With 25 hazards and 5 good practices. This report is based on the findings of ongoing renovation work in Shorooq building apartment contracted by Royal Way Services LLC Dubai. The aim is to evaluate Health and Safety practice such as working conditions and... Continue Reading
This is my practical project report for Nebosh IGC3 that earned me Excellent grade.  With 25 hazards and 5 good practices. This report is based on the findings of ongoing renovation work in Shorooq building apartment contracted by Royal Way Services LLC Dubai. The aim is to evaluate Health and Safety practice such as working conditions and... Continue Reading
ABSTRACT Renovation, a term most commonly associated with buildings is known to be the act or process of improving the existing condition of a broken, damaged or outdated structure. It is the process of restoring to a good condition or making new again a building structure currently in a bad state. The concept of renovation as it relates to... Continue Reading
ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
ABSTRACT In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT    In this study research, we have examined the Project Evaluation and Review Technique, PERT and the Critical Path Method CPM/Critical Path Analysis. CPA as Project Management tools, among others, and applied them to study the Electrical and Mechanical services contract of the School of Health Technology Building Project, FUTO, using... Continue Reading
ABSTRACT The study was carried out to determine problems of teaching practical skills in building construction in vocational and technical colleges in Bauchi State. Survey research design was used for the study, the population for the study comprised both teachers and students from seven technical colleges in Bauchi State. A total of 285... Continue Reading
ABSTRACT The study was carried out to determine problems of teaching practical skills in building construction in vocational and technical colleges in Bauchi State. Survey research design was used for the study, the population for the study comprised both teachers and students from seven technical colleges in Bauchi State. A total of 285... Continue Reading
ABSTRACT This project is concern about the construction of an electrical stove with three oven apartment is described in his project. It was carried out in order to solve the problem often encounter in cooking and drying and at the same time finding an alternat6ive means to replace the... Continue Reading
Call Us
whatsappWhatsApp Us