PROCUREMENT PROCEDURES AND PROJECT SUCCESS OF SELECTED GOVERNMENT INSTITUTIONS IN RWANDA

  • Type: Project
  • Department: Purchasing and Supply
  • Project ID: PAS0144
  • Access Fee: ₦5,000 ($14)
  • Pages: 75 Pages
  • Format: Microsoft Word
  • Views: 131
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT The purpose of the study was to investigate the effects of procurement procedures on the success of projects in selected government institutions. The objectives of the study were to determine the extent of the procurement procedures in selected government institutions; determine the level of project success in selected government institutions; and to determine if there is a significant relationship between procurement procedures and the success of projects. The main method of data collection was a questionnaire administrated to selected staff in the selected government institutions. The targeted population was 168 from selected Ministries of Finance, Infrastructure, Agriculture, Health, Education and Local Government and the sample size was 118. Sampling of respondents was based on SlovenTs formula. Descriptive research design, means and Pearson correlation coefficient were applied to analyze the findings. The research results indicated that respondents with degree (62.7%) have the biggest representation; over 72% of respondents were aged between 35 and below. Most of the respondents (52.5%) were male while women represented 47,5%. 39% of respondents had working experience of 5 but below 10 years, and 26.3% had working experience of 10 years and above. The extent of procurement procedures in selected government institutions was rated by the average mean of 2,139, whereas the level of project success was rated by the mean range of 2,055. The findings indicated that there is a high positive correlation r=0.672 and a significance of P=0.000 between the procurement procedures and the success of projects. Thus, the findings revealed that there is a significant relationship between procurement procedures and projects success of selected government institutions, then the null hypothesis was rejected. Based on the research results, it was revealed that there is an urgent need for the Government of Rwanda to build and strengthen capacity in procurement procedures for its staff involved in procurement operations at all levels. Also, it was recommended to put in place strong control mechanisms that could help to monitor procurement processing in order to achieve its principal goal that is “value for money”. Putting in place an e-procurement system at national level was also recommended as it would facilitate procurement transactions; reduce delays, fraud and corruptions cases.

PROCUREMENT PROCEDURES AND PROJECT SUCCESS OF SELECTED GOVERNMENT INSTITUTIONS IN RWANDA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Purchasing and Supply
  • Project ID: PAS0144
  • Access Fee: ₦5,000 ($14)
  • Pages: 75 Pages
  • Format: Microsoft Word
  • Views: 131
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Purchasing and Supply
    Project ID PAS0144
    Fee ₦5,000 ($14)
    No of Pages 75 Pages
    Format Microsoft Word

    Related Works

    Abstract The purpose of the study was to determine the relationship between the internal auditing and the performance of public institutions especially Rwanda revenue authority. In chapter one the researcher covered the background the study, stated the problem statement, the scope of the study and finally the signification of the study. In chapter... Continue Reading
    ABSTRACT This research work is focused on the procurement procedures for small and medium scale business – SMEs with regards problem and prospects. The study examined the background of the study, its scope, statements of problems, objectives of the study, scope and limitation of the study and definition of terms. The existing literature on... Continue Reading
    ABSTRACT This research work is focused on the procurement procedures for small and medium scale business – SMEs with regards problem and prospects. The study examined the background of the study, its scope, statements of problems, objectives of the study, scope and limitation of the study and definition of terms. The existing literature on... Continue Reading
    PROPOSAL Loan procurement procedure for small and medium scale businesses (SMEs) “problems and prospects”. A case study of some selected SMEs viz; pacific publishers, Amaka Groceries, Chinedu... Continue Reading
    LOAN PROCUREMENT PROCEDURES FOR SMALL AND MEDIUM SCALE BUSINESSES “PROBLEMS AND PROSPECTS” (A CASE STUDY OF SOME SELECTED SMES IN ENUGU METROPOLIS) PROSOAL Loan procurement procedure for small and medium scale businesses (SMEs) “problems and prospects”. A case study of some selected SMEs viz; pacific publishers, Amaka Groceries, Chinedu... Continue Reading
    ABSTRACT The study intended to establish the relationship between Procurement contracts and compliance with procurement procedures among manufacturing industries in Uganda, a case of steel rolling mills in Jinja Municipality, Uganda This study was guided by three objectives; (i) To determine the extent of Procurement contracts. (ii) To determine... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY A well-thought and effectively executed project to a large extent contributes to national development. For a project to be implemented and objective of it realized, a thorough monitoring and evaluation of it has to be carried out. Any government intervention project embarked upon without... Continue Reading
    ABSTRACT Generally, the success of completing any building construction project is based on key performance indices such as timely delivery of project, construction period, defects as well as client satisfaction. However, what effect does the implementation of safety management practices has on building construction project success? This research... Continue Reading
    ABSTRACT The study established the relationship between the management of the key stages in the public procurement process and identified the problems in the process which hinder effective service delivery. The study was a descriptive design and both quantitative and qualitative research methods were used to the opinions of individuals and groups.... Continue Reading
    ABSTRACT This report is a result of an academic research entitled “The Contribution of Decentralization and Community Development Project (DCDP) on poverty reduction in Nyagatare District/ Rwanda (2005- 2010)”. The main purpose of this study was to analyze how DCDP project led to poverty reduction in Nyagatare District/Rwanda. The study was... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us