THE PUBLIC PROCUREMENT MANAGEMENT PROCESS AND SERVICE DELIVERY IN RWANDA PARASTATALS


For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

The study established the relationship between the management of the

key stages in the public procurement process and identified the problems

in the process which hinder effective service delivery.

The study was a descriptive design and both quantitative and qualitative

research methods were used to the opinions of individuals and groups.

The population of the study was 143 and this included directors of units,

tender committee members, RPPA officials and official from auditor

general’s office. Quantitative data was gathered through questionnaires

while qualitative data was generated from interviews with stakeholders.

The findings of the study indicated that Even though there are approaches

considered to enforce and implement procurement law in Rwanda, there

are still some elements of corruption. Competition is not conducted in a

fair and transparent manner.

The contract management phase of the procurement life cycle often

receives the least management attention and effort (at least until

something goes wrong).

In some of our recommendations, we stated that the evaluation criteria

should be the same criteria that are spelled out in the bidding documents,

which need to be met to satisfy the technical requirements. There should

be a public opening of the tenders on the published date.

TABLE OF CONTENTS

DECLARATION A ii

DECLARATION B iii

APPROVAL SHEET iv

DEDICATION v

ACKNOWLEDGEMENT vi

ABSTRACT vii

LIST OF ABBREVIATIONS AND ACRONYMS viii

LIST OF TABLES ix

Chapter one THE PROBLEM AND ITS SCOPE 1

Background of the study 1

Statement of the problem 3

The purpose of the study 4

Research objectives 4

Research 5

Hypothesis 5

Scope of the study 5

Significance of the study 7

Operational definitions of the key terms 8

Two REVEIEW OF RELATED LITERATURE 11

Concepts, ideas, opinions from authors/experts 11

Theoretical perspectives 12

Related studies 14

~ Iii

Three METHODOLOGY 29

Research design 29

Research population 29

Sample size 29

Sampling procedures 31

Research instruments 31

Validity and reliability of the instruments 32

Data gathering procedures 34

Data analysis 34

Ethical considerations 35

Limitations of the study 35

Four PRESENTATION, ANALYSIS AND

INTERPRETATION OF THE DATA 37

Five FINDINGS, CONCLUSION AND

RECOMMENDATIONS 63

Findings 63

Conclusion 64

Recommendations 66

REFERENCES 69

APPENDICES 76

Appendix I Questionnaire 72

Appendix II Interview guide 77

Appendix III Transmittal letter 78

Appendix IV Curriculum Vitae 79

ix

LIST OF ABBREVIATIONS AND ACRONYMS

ADB African Development Bank

EU European Union

FOC Full and Open Competition

GIGO Garbage in Garbage~ out

GNP Gross National Product

GPA Government Procurement Agreement

GRN Goods Received Note

ICT International Technical Cooperation

KIU Kampala International University

NPM New Public Management

PDE Procurement and Disposal Entity

PE Procuring Entity

PU Procurement Unit

PDU Procurement and Disposal Unit

PPDA Public Procurement and Disposal of Assets Authority

RPPA Rwanda Public Procurement Authority

RTA Rwanda Tea Authority

SPSS Statistical Package for Social Scientists

UNDP United Nations Development Program

WB World Bank

WTO World Trade Organization

BSCB Public Sector Capacity Building


THE PUBLIC PROCUREMENT MANAGEMENT PROCESS AND SERVICE DELIVERY IN RWANDA PARASTATALS
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Business Administration and Management
Project ID BAM2981
Fee ₦5,000 ($14)
No of Pages 95 Pages
Format Microsoft Word

Related Works

(A CASE STUDY OF BUREAU OF PUBLIC PROCUREMENT) ABSTRACT Public procurement is the process by which governments buy inputs for vital public-sector investments. Those investments, both in physical infrastructure and in strengthened institutional and human... Continue Reading
TABLE OF CONTENTS DECLARATION ii APPROVAL iii DEDICATION iv ACKNOWLEGEMENT v TABLE OF CONTENTS vi LIST OF ABBREVIATIONS x LIST OF TABLES xi LIST OF FIGURES xii ABSTRACT xiii CHAPTER ONE 1 INTRODUCTION 1 1.0 Introduction I 1.1 Background of the study 1 1.2 Statement ofthe Problem 3 1.3 Purpose ofthe study 4 1.4 The objectives of the study 4 1.5... Continue Reading
Abstract The purpose of the study was to determine the relationship between the internal auditing and the performance of public institutions especially Rwanda revenue authority. In chapter one the researcher covered the background the study, stated the problem statement, the scope of the study and finally the signification of the study. In chapter... Continue Reading
ABSTRACT The purpose of the study was to establish the relationship between levels of effectiveness in recruitment to the performance of RECO-RWASCO in Rwanda. The study was guided by the following specific objectives; to determine the profile of the respondents; to determine the level of effectiveness in recruitment; to determine the level of... Continue Reading
ABSTRACT The study examined the relationship between Accounting information system and financial performance in Banque Populaire de Rwanda and it was based on six specific objectives: (a) to determine respondents’ profile in terms of gender, age, level of educational, position and experience; (b) level of accounting information system; (c) level... Continue Reading
EVALUATION OF THE USE OF TENDERS IN A PUBLIC SECTOR PROCUREMENT (A CASE STUDY OF BUREAU FOR PUBLIC PROCUREMENT, ENUGU) ABSTRACT The subject matter of this study is to carefully evaluate the use of tenders in the public sector procurement. In a bid for better understanding of public procurement as to the Nigerian content backed by the Nigerian... Continue Reading
CHAPTER I: Introduction 1.9             Background of the Study This study intends to shed more light on the impact of public procurement act on the accountability of procurement officers in public sector in Kaduna state ministry of education and how it contribute positively towards the conservation of resources in a services... Continue Reading
CHAPTER I: Introduction 1.9             Background of the Study This study intends to shed more light on the impact of public procurement act on the accountability of procurement officers in public sector in Kaduna state ministry of education and how it contribute positively towards the conservation of resources in a services... Continue Reading
Business Process Re-engineering (BPR) has been widely adopted by private businesses and has been a focus of research since the 1990s and it is still one of the top five management concerns for Information Technology (IT) executives globally. However, the adoption of BPR in the public sector in general, and in the public sectors of developing... Continue Reading
ABSTRACT Business Process Re-engineering (BPR) has been widely adopted by private businesses and has been a focus of research since the 1990s and it is still one of the top five management concerns for Information Technology (IT) executives globally. However, the adoption of BPR in the public sector in general, and in the public sectors of... Continue Reading