ABSTRACT

The study intended to establish the relationship between Procurement contracts and compliance with procurement procedures among manufacturing industries in Uganda, a case of steel rolling mills in Jinja Municipality, Uganda This study was guided by three objectives; (i) To determine the extent of Procurement contracts. (ii) To determine the level of compliance with procurement procedures (iii) To establish whether there is a significant relationship Procurement contracts and compliance with procurement procedures among manufacturing industries in Uganda, a case of steel rolling mills in Jinja Municipality, Uganda. A descriptive conelational, cross-sectional and expost-facto design were used. Data analysis was done using frequencies, percentages, means, and Pearson linear conelation coefficiency (PLCC). A descriptive correlational, cross-sectional design was used. Data analysis was done using frequencies, percentages, means, and Pearson linear correlation co-efficiency. Data collection was mainly through questionnaires, interviews and document analysis. All aspects of Procurement contracts were found to be good for example assigning ownership contracts (mean=2.98), designing the structure of contracts (mean=2.90), reviewing contracts (mean=2.90), signing and filing of contracts (mean=2.87), ensuring records retention of contracts (mean=2.94) executing the contracts and ensuring support for the contracts (mean=2.92), and overall (mean=2.91). All aspects of compliance with procurement procedures among manufacturing industries were found to be good for example, compliance to regulatory requirements (mean=2.94), screening for product changes (mean=2.97), model changes (mean=3.07), product updates (mean=3.01), inspection and acceptance (mean=3.10), performance management (mean=2.87), accountability and value for money (mean=2.98) and overall (mean=2.98). results show that compliance with procurement procedures was significantly correlated with assigning ownership contracts (r=0.571, at sig=O. 000), Designing the structure of contracts (r=O. 491 at Sig=O. 000), reviewing contracts (r= 0.481, at Sig=O. 000), signing and filing of contracts (r=O .. 577, at Sig=O. 000), ensuring records retention of contracts (r= 0 .. 578, at Sig=O. 000), executing the contracts and ensuring support for the contracts (r= 0 . .498, at Sig=O. 000). It was recommended that; there is need top provide appropriate training and documentation; develop strategy, policy, procedures and systems; negotiate corporate purchasing agreements; review preferred vendors for performance, offer assistance with any purchase; offer high level discussions with suppliers regarding compliance with procurement procedures the following were suggested; furnishing essential facts in the event of a dispute ; supplier responses must also be submitted in writing with quoted prices, terms and conditions clearly documented in the response among others. 

PROCUREMENT CONTRACTS AND COMPLIANCE WITH PROCUREMENT PROCEDURES AMONG MANUFACTURING INDUSTRY IN UGANDA, A CASE OF STEEL ROLLING MILLS IN JINJA MUNICIPALITY, UGANDA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Purchasing and Supply
  • Project ID: PAS0272
  • Access Fee: ₦5,000 ($14)
  • Pages: 77 Pages
  • Format: Microsoft Word
  • Views: 1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Purchasing and Supply
Project ID PAS0272
Fee ₦5,000 ($14)
No of Pages 77 Pages
Format Microsoft Word

Related Works

ABSTRACT The study intended to establish the relationship between Procurement contracts and compliance with procurement procedures among manufacturing industries in Uganda, a case of steel rolling mills in Jinja Municipality, Uganda This study was guided by three objectives; (i) To determine the extent of Procurement contracts. (ii) To determine... Continue Reading
ABSTRACT In the current global business environment formulating and implementing the best strategies is essential for organization success. One of the key units in the manufacturing industry is the purchasing department. The major share of the organization costs are utilized within the purchasing department hence finding and employing the best... Continue Reading
The  physicochemical  parameters  and  levels  of  selected  heavy  metals  (Cd,  Cr,  Mn,  Zn  and  Pb)  in soil  around  Dana  Steel  Rolling  Limted  Katsina  were  investigated  in  this  research.  The  sample  area was  divided  into  four  units;  East,  West,  North  and  South  and  label  as ... Continue Reading
The  physicochemical  parameters  and  levels  of  selected  heavy  metals  (Cd,  Cr,  Mn,  Zn  and  Pb)  in soil  around  Dana  Steel  Rolling  Limted  Katsina  were  investigated  in  this  research.  The  sample  area was  divided  into  four  units;  East,  West,  North  and  South  and  label  as ... Continue Reading
TABLE OF CONTENT DECLARATION DEDICATION . ii ACKNOWLEDGMENT iii TABLE OF CONTENT iv LIST OF TABLES vi LIST OF FIGURES vii LIST OF ABBREVIATIONS viii ABSTRACT ix CHAFFER ONE I INTRODUCTION 1 1.1 Background to the study 1.2 Statement ofthe problem 4 1.3Thepurposeofthestudy S 1.4 Research objectives 5 1.5 Research questions 5 1.6 Significance ofthe... Continue Reading
TABLE OF CONTENTS DECLARATION ...................................................................................................... i APPROVAL ........................................................................................................... ii DEDICATION... Continue Reading
ABSTRACT Rework has become a menace in engineering procurement and construction projects in Nigerian oil and gas field. This study investigated the underlying causes of rework in construction projects and the impact on overall project performance so that effective containment and reduction strategies can be developed. The research was motivated by... Continue Reading
ABSTRACT Acute diarrhea is defined as the passage of three or more than three loose or watery stool in 24 hours, or passage of one or more bloody stool. Acute diarrhea refers to illness not lasting longer than 14 days. The study was conducted in Jinja Regional Referral Hospital. A total of 306 eligible caregivers of children were selected. The... Continue Reading
TABLE OF CONTENTS DECLARATION APPROVAL DEDICATION iii ACKNOWLEDGEMENT iv ABBREVIATIONS AND ACRONYMS viii ABSTRACT ix LIST OF TABLE x LIST OF FIGURES xi CIIAPTER ONE 1 INTRODUCTION 1 1.1 Background 1 1.2 Statement of the problem 3 1,3. General objective 5 1 .4 Objectives 5 1.5 Research questions 5 1.6 Scope of the study 5 1.6.1 Content Scope 5 1... Continue Reading
TABLE OF CONTENTS ~ECLARATION (A) ..................................................................................................................................... i DECLARATION (B) .................................................................................................................................... ii DEDICATION... Continue Reading