AN ASSESSMENT OF POWER PROJECTS DELIVERY IN SOUTH-SOUTH OF NIGERIA

  • Type: Project
  • Department: Project Management
  • Project ID: PRM0049
  • Access Fee: ₦5,000 ($14)
  • Pages: 84 Pages
  • Format: Microsoft Word
  • Views: 955
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

This study focuses on the assessment of power projects delivery in South-South of Nigeria. The objectives of this study are: to examine

the various project delivery systems (PDS) used in power industry, to investigate the impact of power project delivery system on the industrial needs in south-south, to investigate factors militating against prompt delivery of power projects in the study area and to identify various strategies by the Government to improve power supply in south-south. For the purpose of the study, a total sample of 80 respondents was selected from Project manager, Project contractors, Engineers, and Niger Delta Power Holding Company (NDPHC) under investigation. Questionnaires were used to collect data from respondents. The data collected were analyzed using table,

frequency, percentage, mean rating, mean, standard deviation, Relative importance index, and the hypotheses for the study were tested with Sample t-test, Chi-square, Friedman test statistics, and ANOVA. The study showed that there are different PDS used in Nigeria power industry. It was also revealed that factor militating against power projects has effect on power project delivery. It was further revealed Government has different strategy to improving power supply, but Government strategies do not have effect on the improving of power supply. The findings also showed that PDS have a positive effect on power projects performance. The study concluded that, having

adequate control of PDS would translates into various positive outcomes for power project and all hands must be on deck to monitor the Power Reform

process.


TABLE OF CONTENTS


CHAPTER ONE

1.0       Introduction

1.1       Background to the Study……………………………………………………1-3

1.2       Statement of Problem………………………………………………………..3-4

1.3       Research Questions…………………………………………………..............4

1.4       Aim and Objectives of the Study…………………………………………….4

1.5       Research Hypothesis………………………………………………………….4-5

1.6       Significance of the Study…………………………………

1.7       Scope of the Study……………………………………………………………6

1.8       Operational Definition of Terms ………………………………………..........7


CHAPTER TWO: Literature Review

2.0       Introduction……………………………………………………………………8

2.1       Conceptual framework………………………………………………………...8

2.1.1    Defining Project Delivery………………………………………………………8

2.1.2    Project Delivery System/Strategy………………….…………….…………….9-19

2.1.3    Sources of Electricity Power ……………………………………......................20

2.1.3.1 Non-renewable…………………………………………………………………20-21

2.1.3.2 Renewable energy………………………………………………………………22-23

2.1.4    History of Electricity in Nigeria……………………………………………….23-26

2.1.5    Electricity Power Projects in Nigeria…………………………………..………26-31

2.2       Theoretical Framework…………………………………………………………..31

2.2.1    Model of Design-Bid-Build (DBB)……………………………………………..31-34

2.3       Empirical Framework…………………………………………………………..35-37


CHAPTER THREE: Methodology

CHAPTER FOUR: Presentation of Results and Discussion


CHAPTER FIVE: 

Summary of Findings,

Conclusion and 

Recommendation


APPENDIX ………………………………………………………………………..63-66

REFERENCE …………………………………………………………67-72


List of Tables

AN ASSESSMENT OF POWER PROJECTS DELIVERY IN SOUTH-SOUTH OF NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0049
  • Access Fee: ₦5,000 ($14)
  • Pages: 84 Pages
  • Format: Microsoft Word
  • Views: 955
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Project Management
Project ID PRM0049
Fee ₦5,000 ($14)
No of Pages 84 Pages
Format Microsoft Word

Related Works

ABSTRACT This study focuses on the assessment of power projects delivery in South-South of Nigeria. The objectives of this study are: to examine the various project delivery systems (PDS) used in power industry, to investigate the impact of power project delivery system on the industrial needs in south-south, to investigate factors militating... Continue Reading
ABSTRACT This study focuses on the assessment of  power projects delivery in South-South of Nigeria. The objectives of this study are: to examine the various project delivery systems (PDS) used in power industry, to investigate  the impact of power project delivery system on the industrial needs in  south-south, to investigate factors... Continue Reading
ABSTRACT Electricity is a primary factor of development and should therefore be harnessed, and developed in an efficient manner. It should also be available in adequate quantity, quality and affordable prices. The level and intensity of commercial energy use in a country is a key indicator of the degree of economic growth and development. The... Continue Reading
TABLE OF CONTENTS Title Page i Approval page ii Dedication iii Declaration iv Table of contents v Chapter One 1.1 General Background of the Study 1 1.2 Statement of the Problem 5 1.3 Objective of the study 6 1.4 Research Questions 6 1.5 Hypothesis of the study 7 1.6 Scope and limitation of the study 7 Chapter Two Literature Review 2.1 Literature... Continue Reading
TABLE OF CONTENTS Title Page                                                                                           i Approval... Continue Reading
ABSTRACT This study assess the role of N-Power in poverty alleviation in Niger State using Lapai Local Government N-power participants. Three research questions were formulated to guide the study.  The study used a survey design.  The sample of the study constituted 100 N-power beneficiaries from Lapai Local Government Area. A questionnaire was... Continue Reading
CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and money that can be spent on planning, executing and delivering the project.  Time factors are inherent... Continue Reading
    TABLE OF CONTENTS Cover Page – – – – – – – – – – Title Page – – – – – – – – – – Certification – – – – – – – – – – Dedication – – – – – – – – – – Acknowledgement – – – – – – – – –... Continue Reading
ABSTRACT Community development entails the provision of infrastructural facilities to the people. The provision of these social amenities can be attained through a number of ways and/or organizations which includes, the government, community development associations, Non-Governmental Organisations. Non-Governmental Organisations (NGOs) are... Continue Reading
ABSTRACT Community development entails the provision of infrastructural facilities to the people. The provision of these social amenities can be attained through a number of ways and/or organizations which includes, the government, community development associations, Non-Governmental Organisations. Non-Governmental Organisations (NGOs) are... Continue Reading
Call Us
whatsappWhatsApp Us