DETERMINANTS OF POWER PROJECTS PERFORMANCE IN THE KENYA POWER AND LIGHTING COMP ANY LIMITED


For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Electricity is a primary factor of development and should therefore be harnessed, and developed in an efficient manner. It should also be available in adequate quantity, quality and affordable prices. The level and intensity of commercial energy use in a country is a key indicator of the degree of economic growth and development. The challenges facing the power sector in Kenya include weak transmission and distribution infrastructure, high cost of power, low per capita power consumption, and low countrywide electricity access. Many projects have been initiated to address these challenges by KPLC with the support of the government and development partners. However in most cases the benefits from these projects are not realized due to poor performance during implementation. Research has found that, there are many factors that impede on project successful completion. Four independent variables namely; project management skills, politics, socio economic and government bureaucracy were identified as significant in contributing to project performance. This study sought to investigate how these variables affect performance on power projects implemented by KPLC, evaluate their relative ranking, and to quantify their impacts. The research employed an Ex Post Facto Survey design, which is deemed appropriate because it handles situations or events that have already occurred, investigates variables with the same characteristics and does not manipulate the variables. A questionnaire was used in data collection where respondents were drawn from contractors, consultants and KPLC staff, involved in the implementation of projects. Purposive sampling technique was used in identifying the departments for the study. The target population for the study was 168 persons in various department of the organization which included IT & Telecommunications, distribution, energy transmission, customer service, co-operate planning research and development and the energy sector recovery project unit from which a sample of 58 persons was selected. The response was very successful with a rate of 48 out of 58. The highest response was from IT & Telecommunications which demonstrates that the projects being undertaken by KPLC are technologically based. Data was analyzed qualitatively and quantitatively facilitated by SPSS (Statistic Package for Social Science) Computer package and presented in tables, graphs pie charts and frequency tables. The study lead to a conclusion that, project management skills, political interference, socio economic factors and government bureaucracy play a major role in project success realization in the KPLC. On ranking, project management skills had the highest effect on project performance while government bureaucracy had the least impact. These factors will continue affecting KPLC future projects under similar implementation environment thus the need for the organization to embrace mitigating actions that will enhance project success. The researcher recommends that KPLC invests in capacity building by equipping staff with required skills, to effectively manage projects. Recruitment of top management should be done through a competitive process to avoid being influenced by politicians so as to disengage its operation from politically affiliated decisions in choice of projects, contracts and management of projects in general. The organization should enjoin the community in areas it initiates projects through corporate social responsibility and partake lobbing for government support during the project roll out process. 

DETERMINANTS OF POWER PROJECTS PERFORMANCE IN THE KENYA POWER AND LIGHTING COMP ANY LIMITED
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Business Administration and Management
    Project ID BAM3723
    Fee ₦5,000 ($14)
    No of Pages 63 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT Electrical power project like most of the construction projects are complex, dynamic, unique and prone to uncertainties, hence pose challenges even to the best of the project managers. The project team faces unprecedented changes in addition to constraints of budgets, time and quality. Review of literature reveals diverging opinions as to... Continue Reading
    ABSTRACT Strategic procurement is the process of creating alignment and consistency of action that establishes the long range objectives and overall strategy by which procurement function fulfills its mission. It entails the transformation of an organization’s mission, goals, and objectives into measurable activities to be used to plan, budget... Continue Reading
    ABSTRACT Credit Management system is a set of policy measures that are designed by each individual business entity to minimize costs associated with extension of credit while maximizing the benefits from it. The purpose of the study is to establish the effectiveness of credit management system in preventing financial resource loss through bad... Continue Reading
    L (A CASE STUDY OF COMPUTER SCIENCE ND SOFTWARE LAB) CHAPTER ONE INTRODUCTION 1.1   BACKGROUND TO THE STUDY The use of renewable energy increased greatly just after the first big oil crisis in the late seventies. At that time, economic issues were the most important... Continue Reading
      TABLE OF CONTENTS DECLARATION i DEDICATION ii COPYRIGHT iii ACKNOWLEDGEMENTS iv ABSTRACT v LIST OF TABLES vii LIST OF FIGURES viii LIST OF ACCRONYMS AND ABBREVIATIONS ix OPERATIONAL DEFINITION OF TERMS x INTRODUCTION 1 1.0 Background of the Study 1 1.2 Solar Power System 2 1.3 Operating Principle of the DSTATCOM 3 1.4. Modelling of PV Array 5... Continue Reading
      TABLE OF CONTENTS DECLARATION    i DEDICATION    ii COPYRIGHT    iii ACKNOWLEDGEMENTS    iv ABSTRACT    v LIST OF TABLES    vii LIST OF FIGURES    viii LIST OF ACCRONYMS AND ABBREVIATIONS    ix OPERATIONAL DEFINITION OF TERMS    x INTRODUCTION    1 1.0 Background of the Study    1 1.2 Solar Power System    2... Continue Reading
    CHAPTER ONE VIEWS OF PHILOSOPHERS THROUGH THE AGES Perhaps what has become so dominant in the affairs and the nature of man, almost exclusively, is the need to be treated well. What seemed as latent but constantly boiling in every individual of all ages is a quest to get a fair... Continue Reading
    ABSTRACT This project work is aimed at developing an efficient Algorithm for the management of Electric Power network using fuzzy logic. The fuzzy logic model functions as a system operator in making decision for load shedding and transfer switching. The new technique uses the system data frequency variation, load variation and voltage variation... Continue Reading
    Abstract Electronic devices comprising of non-linear components (diodes, transistors, transformers, etc.) produce some number of harmonics in our power systems creating various voltage distortions [7]. As a result, several technical problems may arise for the device such as overheating and damage to sensitive equipment which would most likely lead... Continue Reading
    ABSTRACT This work analysed the current state of power system in Nigeria with emphasis on distribution system using Akwa Ibom Distribution System as a case study. The components of the study system were analyzed. This work adopted the analytical and simulation approach to reliability and stability assessment. Analysing the system the way it is... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us