OPTIMUM ARTIFICIAL LIFT SELECTION FOR CONDENSATE GAS WELL

  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0046
  • Access Fee: ₦5,000 ($14)
  • Pages: 26 Pages
  • Format: Microsoft Word
  • Views: 736
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

The reservoir characteristics of the gas condensate well is special and the changes of the behavior of the well have a significant impact to the production rate. When we do a proper optimization that can lower the operating costs, maximizing HC recovery and the net present value of a project can be increased. The optimization of the well level can be accomplished by adjusting well parameters such as tubing size, wellhead and the skin factor. All of these parameters were investigated with the using of a PIPESIM simulation software and the aid of a real field Thrace basin. Following the period changes, the history matching data is validated to identify potential predictions of the performance for the same reservoir deliverability, so to obtain the preferred production practices, we compare and validate the predicted results with the measured field data. Also, the results show that there is a 45% production rate reduction which is affected by the skin factor. When the reservoir pressure is reduced, the production rate will decrease around 70%. When manipulating the wellhead pressure, there is a slight decrease in production rate compared to tubing size, which does not indicate any major change.

There are several techniques for deliquification of wells, here we used artificial lift methods which are ESP and PSP in a well in Thrace basin suffering from condensate banking.

The gas rate was initially 0.518 mmscf/d

When using ESP gas rate increased to reach 2.3mmscf/d

When using PSP gas rate increased to reach 6.737 mmscf/d

OPTIMUM ARTIFICIAL LIFT SELECTION FOR CONDENSATE GAS WELL
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0046
  • Access Fee: ₦5,000 ($14)
  • Pages: 26 Pages
  • Format: Microsoft Word
  • Views: 736
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Petroleum Engineering
Project ID PEE0046
Fee ₦5,000 ($14)
No of Pages 26 Pages
Format Microsoft Word

Related Works

CHAPTER 1 INTRODUCTION 1.0 Background of Study Oil and Gas is considered to be one of the major sources of energy in the world due to its high energy density, easy transportability, and relative abundance. It is a vital factor in every country’s economy. Almost all items that we buy, use, and consume are products of oil. The EIA (Energy... Continue Reading
ABSTRACT Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
Abstract Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
Introduction Hydrocarbons(oil and gas) are found in the pore spaces of sedimentary geologic formations (reservoir rocks).  Once an oil or gas reservoir is discovered and assessed, production engineers begin the task of maximizing the amount of oil or gas that can ultimately be recovered from it. Some reservoir rocks may allow the oil and gas to... Continue Reading
ABSTRACT Well tests exist already for a long time. Since the first oil reservoir was discovered, oil companies have always been keen on estimating reservoir properties such as size. Present day well testing has gone beyond this and its usefulness cannot be overemphasized. This project work is concerned with the use of well testing in identifying... Continue Reading
ABSTRACT Every Natural gas well ceases producing as reservoir pressure depletes. The usual liquid presence in the reservoir can cause further problems by accumulating in the wellbore and reducing production even more. There are a number of options in well completion to prevent liquid loading even before it becomes a problem. Tubing size and... Continue Reading
EVALUATION OF NIGERIAN GAS PRODUCTION & ELECTRICITY GENERATION FROM NATURAL GAS USING REGRESSION ANAYLSIS(1999-2014) CHAPTER ONE INTRODUCTION 1.1. Background of the study Nigeria is a nation that has been blessed with mineral resources ranging from solid minerals to crude oil deposits; right from the northern part of Nigeria to the southern... Continue Reading
(A CASE STUDY OF UNITED BANK FOR AFRICA KADUNA) TABLE OF CONTENT Title page    -        -        -        -        -        -        -        -        -        i... Continue Reading
ABSTRACT Electricity companies typically possess numerous units and they need to commit unit because electricity cannot be stored in a large-scale system and demand is a random variable process fluctuating with the time of the day and the day of the week. A problem that must be frequently resolved by electricity utility is to economically... Continue Reading
Call Us
whatsappWhatsApp Us