MATHEMATICAL MODEL FOR LIQUID LOADING IN NATURAL GAS WELL PRODUCTION

  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0003
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 2.4K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Every Natural gas well ceases producing as reservoir pressure depletes. The usual liquid presence in the reservoir can cause further problems by accumulating in the wellbore and reducing production even more. There are a number of options in well completion to prevent liquid loading even before it becomes a problem. Tubing size and perforation interval optimization are the two most common methods. Although completion optimization will prevent liquid accumulation in the wellbore for a certain time, eventually as the reservoir pressure decreases more, the well will start loading. As liquid loading occurs it is crucial to recognize the problem at early stages and select a suitable prevention method. There are various methods to prevent liquid loading such as; mechanical methods (gas lift, plunger lift, pumping and velocity string installation), chemical (foamers), and mathematical simulation. This study is set out to develop a mathematical model – an improvement on previous models – ­­to prevent loading in Natural gas well production.

MATHEMATICAL MODEL FOR LIQUID LOADING IN NATURAL GAS WELL PRODUCTION
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0003
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 2.4K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Petroleum Engineering
Project ID PEE0003
Fee ₦5,000 ($14)
Chapters 5 Chapters
No of Pages 50 Pages
Format Microsoft Word

Related Works

EVALUATION OF NIGERIAN GAS PRODUCTION & ELECTRICITY GENERATION FROM NATURAL GAS USING REGRESSION ANAYLSIS(1999-2014) CHAPTER ONE INTRODUCTION 1.1. Background of the study Nigeria is a nation that has been blessed with mineral resources ranging from solid minerals to crude oil deposits; right from the northern part of Nigeria to the southern... Continue Reading
TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Background of Study 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Research Question 1.6 Research Hypothesis 1.7 Significance of the Study 1.8... Continue Reading
TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Background of Study 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Research Question 1.6 Research Hypothesis 1.7 Significance of the Study 1.8... Continue Reading
ABSTRACT The effect of liquid flow rate, pipe size (diameter) and pipe orientation (inclination) on liquid hold-up was investigated. Liquid flow rate between 500 STB/day and 5000 STB/day was studied. An oil of 25˚API at an average temperature of 175˚F, a gas gravity of 0.65, water cut of 25% with water gravity of 1.07 and containing no free gas... Continue Reading
ABSTRACT This study is a comparative analysis of the use of coal, fuel oil and natural gas for cement production noting their physical and chemical properties, cost and availability, impact on the environment and human health. Out of the seven cement manufacturing industries in Nigeria, three industries use these fuels were selected for the study.... Continue Reading
ABSTRACT This study is a comparative analysis of the use of coal, fuel oil and natural gas for cement production noting their physical and chemical properties, cost and availability, impact on the environment and human health. Out of the seven cement manufacturing industries in Nigeria, three industries use these fuels were selected for the study.... Continue Reading
Abstract The Niger Delta is on the throes of death caused by the unmitigated exploration, exploitation and production of hydrocarbon which feeds and develops foreign economies at the detriment of the host communities which live in the worst state of neglect by... Continue Reading
ABSTRACT This study is a comparative analysis of the use of coal, fuel oil and natural gas for cement production noting their physical and chemical properties, cost and availability, impact on the environment and human health. Out of the seven cement manufacturing industries in Nigeria, three industries use these fuels were selected for the study.... Continue Reading
ABSTRACT The purpose of the project is to study the effect of liquid flow rate and gas flow rate on the pressure drop in a packed absorption tower and also to repair and restore the packed absorption tower to good working condition. Trouble shooting... Continue Reading
Call Us
whatsappWhatsApp Us