CASE STUDY OF NATURAL FLOW AND ARTIFICIAL LIFT FOR A SOLUTION GAS DRIVE RESERVOIR

  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0051
  • Access Fee: ₦5,000 ($14)
  • Pages: 96 Pages
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Abstract

Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the subsequent expansion of the solution gas as the reservoir pressure is reduced are inadequate to produce such reservoirs to their full capacities. Ultimate oil recovery from natural flow of a solution - gas drive reservoir makes it one of the least efficient primary recovery mechanisms. This leaves a substantial amount of remaining oil residing in the reservoir which must be produced. Artificial lift technologies such as continuous gas lift, gas lift with velocity strings and positive displacement pumping is therefore employed at later phases of the reservoir’s life to increase the ultimate recovery which is what this project sort to do. Synthetic data based on material balance for a solution – gas drive reservoir is analyzed to predict its primary oil recovery based on which gas lifting, velocity strings technology and positive displacement pumping are suggested to be employed with respect to time at different stages of reservoir’s life.

CASE STUDY OF NATURAL FLOW AND ARTIFICIAL LIFT FOR A SOLUTION GAS DRIVE RESERVOIR
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0051
  • Access Fee: ₦5,000 ($14)
  • Pages: 96 Pages
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Petroleum Engineering
Project ID PEE0051
Fee ₦5,000 ($14)
No of Pages 96 Pages
Format Microsoft Word

Related Works

ABSTRACT Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
ABSTRACT The design of natural flow and artificial lift tubing strings for the whole life of a water drive reservoir was carried out using data based on synthetic reservoir performance based on a material balance. The effects of reservoir properties on the life of the well was also investigated. Constraints such as maximum production, maximum... Continue Reading
The reservoir characteristics of the gas condensate well is special and the changes of the behavior of the well have a significant impact to the production rate. When we do a proper optimization that can lower the operating costs, maximizing HC recovery and the net present value of a project can be increased. The optimization of the well level can... Continue Reading
CHAPTER 1 INTRODUCTION 1.0 Background of Study Oil and Gas is considered to be one of the major sources of energy in the world due to its high energy density, easy transportability, and relative abundance. It is a vital factor in every country’s economy. Almost all items that we buy, use, and consume are products of oil. The EIA (Energy... Continue Reading
Introduction Hydrocarbons(oil and gas) are found in the pore spaces of sedimentary geologic formations (reservoir rocks).  Once an oil or gas reservoir is discovered and assessed, production engineers begin the task of maximizing the amount of oil or gas that can ultimately be recovered from it. Some reservoir rocks may allow the oil and gas to... Continue Reading
EVALUATION OF NIGERIAN GAS PRODUCTION & ELECTRICITY GENERATION FROM NATURAL GAS USING REGRESSION ANAYLSIS(1999-2014) CHAPTER ONE INTRODUCTION 1.1. Background of the study Nigeria is a nation that has been blessed with mineral resources ranging from solid minerals to crude oil deposits; right from the northern part of Nigeria to the southern... Continue Reading
TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Background of Study 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Research Question 1.6 Research Hypothesis 1.7 Significance of the Study 1.8... Continue Reading
TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Background of Study 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Research Question 1.6 Research Hypothesis 1.7 Significance of the Study 1.8... Continue Reading
An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
Call Us
whatsappWhatsApp Us