AN EVALUATION OF THE POTENTIALS OF NATURAL GAS IN THE ECONOMIC DEVELOPMENT OF NIGERIA

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0257
  • Access Fee: ₦5,000 ($14)
  • Pages: 81 Pages
  • Format: Microsoft Word
  • Views: 867
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

This study brought to the fore, a critical evaluation of the potentials of natural gas in the economic development of Nigeria. Natural gas option was considered the best alternative energy resource to other resources for optimizing income earning, indigent capacity building and the socio-economic development of an over populated Nigeria. Data and statistical reports from the various oil companies ere collaborated with the central bank economic report to determine the income generation from the resources. Parameters for measuring economic development analysis were used, including the various applications of natural gas. There impacts were then accessed in terms of efficiency of production, effectiveness of use, human and social welfare conditions of the people. These results indicated that natural gas production and utilization have not sufficiently contributed towards the socio-economic development of Nigeria. It is therefore imperative that a comprehensive energy policy should be formulated by the government to make-up for the functional lapses in gas exploration and partner effectively with oil companies to invest in transportation and marketing. Also a firm date should be set by government to stop gas flaring in all ramifications so that the desired economic benefit of natural gas will be sufficiently felt.

AN EVALUATION OF THE POTENTIALS OF NATURAL GAS IN THE ECONOMIC DEVELOPMENT OF NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0257
  • Access Fee: ₦5,000 ($14)
  • Pages: 81 Pages
  • Format: Microsoft Word
  • Views: 867
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Mechanical Engineering
Project ID MCE0257
Fee ₦5,000 ($14)
No of Pages 81 Pages
Format Microsoft Word

Related Works

EVALUATION OF NIGERIAN GAS PRODUCTION & ELECTRICITY GENERATION FROM NATURAL GAS USING REGRESSION ANAYLSIS(1999-2014) CHAPTER ONE INTRODUCTION 1.1. Background of the study Nigeria is a nation that has been blessed with mineral resources ranging from solid minerals to crude oil deposits; right from the northern part of Nigeria to the southern... Continue Reading
ABSTRACT Development and performance analysis of compressed natural gas (CNG) as a transportation fuel for automobiles in Nigeria are presented. The study involved compositional analysis of natural gas obtained from the product sales point at a treatment plant about 10km off the Port Harcourt-Onitsha route chosen to ensure standard sales gas... Continue Reading
An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Background of Study 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Research Question 1.6 Research Hypothesis 1.7 Significance of the Study 1.8... Continue Reading
TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Background of Study 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Research Question 1.6 Research Hypothesis 1.7 Significance of the Study 1.8... Continue Reading
ABSTRACT Every Natural gas well ceases producing as reservoir pressure depletes. The usual liquid presence in the reservoir can cause further problems by accumulating in the wellbore and reducing production even more. There are a number of options in well completion to prevent liquid loading even before it becomes a problem. Tubing size and... Continue Reading
ABSTRACT Solution gas drive reservoirs are characterized by rapid and continuous decline of reservoir pressure. This rapid and continuous decline of reservoir pressure causes direct decline of reservoir performance at early stages of the life of the reservoir. The principal source of energy which is gas liberation from the crude oil and the... Continue Reading
Call Us
whatsappWhatsApp Us