ENERGY AUDIT, OPTIMISATION AND MANAGEMENT OF LIQUEFIED NATURAL GAS PLANTS WITH RENEWABLE ENERGY RESOURCES AROUND THE PLANT: A CASE STUDY OF BRASS LNG, BRASS ISLAND, NIGERIA

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0383
  • Access Fee: ₦5,000 ($14)
  • Pages: 33 Pages
  • Format: Microsoft Word
  • Views: 468
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power generation system reduced the fuel consumption, greenhouse gas emission and noise pollution by the generators and turbine by relieving some of the power plants or reducing their sizes. Economic cost benefit analysis and recovery periods projections made showed that system is economically viable and technically feasible with low recovery time. 

ENERGY AUDIT, OPTIMISATION AND MANAGEMENT OF LIQUEFIED NATURAL GAS PLANTS WITH RENEWABLE ENERGY RESOURCES AROUND THE PLANT: A CASE STUDY OF BRASS LNG, BRASS ISLAND, NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0383
  • Access Fee: ₦5,000 ($14)
  • Pages: 33 Pages
  • Format: Microsoft Word
  • Views: 468
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0383
    Fee ₦5,000 ($14)
    No of Pages 33 Pages
    Format Microsoft Word

    Related Works

    The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
    The energy generation and power consuming loads at Brass LNG facility located in Brass Island, Bayelsa State Nigeria were analyzed and compared with expected demand changes and means of minimizing cost and greenhouse gas emission were also proffered with wind and solar energy penetration into the overall power mix . The wind and solar hybrid power... Continue Reading
    An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
    An energy audit on the Brass Liquified Natural Gas plant at Brass Island former Agip facility was carried. The average offshore windspeed and wave return periods for 12months  were measured for their wind and wave energy potentials. Also,  the solar insolation for the location was collected for a 12month period. A pilot design based on... Continue Reading
    The aim of the project is to design a renewable energy system that can meet the current and  projected electricity demands for the island of Great Cumbrae. This should be achieved by  providing a stable electricity output and the meet the calculated total annual base load supply of  11.29 GWh. In addition to providing a stable supply of... Continue Reading
    Table of Contents 1. Introduction 2. Electricity Demand 3. Wind Power System 4. Floating Solar Photovoltaic (PV) System 5. Electricity Storage Systems ____ 6. Site Choice 7. Planning Permission Statement 8. Environmental Impact Assessment _ 9. Project Plan 10.... Continue Reading
    ABSTRACT 1956 oil was first struck in commercial qualities in Oloibiri in the present day Ogbia Local Government Area of Bayelsa State. Accordingly, the discovery of oil has brought economic prospect to the nation and... Continue Reading
    ABSTRACT The development of any nation and its economy at large is centred on reliable and efficient power supply. Many developing nations are yet to actualise this feat, and therefore, there is need to strategize to meet the ever-rising demand for energy. Battery-based inverter systems have over the years provided additional power supply to... Continue Reading
    ABSTRACT The development and utilization of energy has led to environmental degradation with associated health hazard. Hence the trust of this project is to optimize energy mix in a reliable, affordable, available, safe, efficient, effective and sustainable way at control cost subject to environmental constraints. In other to achieve the desired... Continue Reading
    INTRODUCTION One of the many problem facing the business community has been the problem of integrating the objectives of the  employees with that of the organization for the achievement of the organization objectives.  Even when such an integration has been made there should be a dear method or system of measurement of the contribution of... Continue Reading
    Call Us
    whatsappWhatsApp Us