DETERMINATION OF HEADWAY AND AVERAGE TRAVEL SPEED OF VEHICLES (CASE STUDY OF POST OFFICE-KWARA STATE POLYTECHNIC PERMANENT SITE CAR PARK ROAD)

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0190
  • Access Fee: ₦5,000 ($14)
  • Pages: 48 Pages
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Since it is compulsory that people and goods move from one part of the country to the other or within particular defined regional area, the facilities used for this purpose need to be well planned, designed and constructed. Inadequate and unplanned traffic control constitute a lot of problems resulting in delay, congestion, immobility to uneasy access to transport etc. This project is to determine the headway and average travel speed of vehicles (Case study of post office- Kwara State Polytechnic permanent site car park road). In order to determine the time taken, distance, speed of a vehicle of the existing road network. Having considered the necessary observations from the post- office to Kwara state polytechnic permanent site car park we are able to observe that the distance is 10. 5km and the time taken varies where the lowest value of time taken from day one is sixteen (16) minutes while the highest is twenty two minutes (22) while on the second day we were able to determine the time taken from 8: 19am – 9: 30am and the total lowest value of the time taken is twenty (20) minutes while the highest is twenty two (22) minutes and the total average headway for the day one is 3.5 minutes while the total average headway for the day two practical is 4.5 minutes and the determination of the average speed of the day one practical is 11.2km per hour while the average speed for the second day practical is 11. 20km per hour and the total value for day 1 and 2 is 11. 15km per hour and also we are able to determine the day like Monday, Tuesday, Friday are the days that have much masses while Wednesday, Thursday are not much and also from the result, the Average Daily Time (ADT) of traffic volume shows that morning peak hour flow is 8: 00am to 9: 00am everyday, due to Kwara state polytechnic permanent site students and also the staff and University of Ilorin Teaching Hospital (UITH) that was moved to Oke- Oyi which was sited along the same direction, due to movement of student and workers that are going to their normal daily activities and also the afternoon peak hour is 4: 00pm to 5: 00pm when they are returning from their daily activities but the traffic flow is high in the morning than that of the afternoon peak hour flow.  

DETERMINATION OF HEADWAY AND AVERAGE TRAVEL SPEED OF VEHICLES (CASE STUDY OF POST OFFICE-KWARA STATE POLYTECHNIC PERMANENT SITE CAR PARK ROAD)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0190
  • Access Fee: ₦5,000 ($14)
  • Pages: 48 Pages
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Civil Engineering
Project ID CVE0190
Fee ₦5,000 ($14)
No of Pages 48 Pages
Format Microsoft Word

Related Works

ABSTRACT Since it is compulsory that people and goods move from one part of the country to the other or within particular defined regional area, the facilities used for this purpose need to be well planned, designed and constructed. Inadequate and unplanned traffic control constitute a lot of problems resulting in delay, congestion, immobility to... Continue Reading
Abstract Star Ways Tours and Travel Agency is a large international (East Africa) travel agency that has its headquarters in Nairobi city on Accra road with a branch in Kampala city on Buganda road near the Central Police Station and opposite the Constitutional Square. It deals with the transportation of people and goods to and from in the... Continue Reading
ABSTRACT In this project about online car rental system the trend of c-business has~ been highlighted where by some car renting agencies have changed from traditional way of booking to an electronic one. Mainly a number of aspects have been stressed which include business process, technological enhancement, diversification, flexibility,... Continue Reading
ABSTRACT Road Transportation was viewed by the researcher as a sine qua non in the economy whether developed or developing. Road transportation is seen as the engine of an economy. It links producers, suppliers, consumers and commuters. But poor, ineffective and inefficient road transportation system have crippled development and the collapse of... Continue Reading
ABSTRACT Road Transportation was viewed by the researcher as a sine qua non in the economy whether developed or developing. Road transportation is seen as the engine of an economy. It links producers, suppliers, consumers and commuters. But poor, ineffective and inefficient road transportation system have crippled development and the collapse of... Continue Reading
Abstract Vehicles are ingenuous contraptions that have significantly revolutionized how human beings move from one place to another. However, inasmuch as they have liberated man, they have also become a major cause of fatalities and injuries. Technologies such as Automatic License Plate Recognition (ALPR) have been utilized in advanced countries... Continue Reading
I dont have that.. but the project iscomplete thanks.... Continue Reading
I dont have that.. but the project is complete thanks.... Continue Reading
                                                                                  Abstract The phenomenon of street child hawking is an offshoot of complex interplay of various socio-economic and cultural factors, religious, cultural, linguistic and geographical... Continue Reading
Call Us
whatsappWhatsApp Us