EVALUATION OF TRICYCLE AS PUBLIC TRANSPORT SYSTEM IN AN URBAN AREA (A CASE STUDY OF IPATA-SANGO, ILORIN)

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0158
  • Access Fee: ₦5,000 ($14)
  • Pages: 18 Pages
  • Format: Microsoft Word
  • Views: 326
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

This project goes into detailed evaluation of tricycle as public means of transport system in an urban area with a particular reference to Ipata-Sango, Ilorin metropolis selected as the case study. The project reviews existing literature on Tricycle ( Keke Napep) within Ipata-Sango, Ilorin. Inclusive are the circumstances that led to the invention of this medium as well as the drawbacks encounter in the past. However the finding of the research work base on the evaluation of Tricycle as public means of transport system indicates the present operational but attached to this are some few shortcomings caused by both Kwara State Government, the Tricycle transport agency and tricyclists or operators. Also is the shortcoming of management and staff leading to inefficiency in the system. With the full study on all these drawbacks, it`s now suggested that the running of the corporation should be given to competent personnel base on merits and qualifications with less intervention by the State Government into the financial and operational capabilities. In addition, the management/staff is suggested to be encouraged and developed by giving incentives and training in their course of service years. Above all the research work poses to be more effective in planning and monitoring all aspect of Safety. If it is done continuosly, therefore it serves a means of redressing areas where there are deficiencies.

TABLE OF CONTENTS

                                                                                              PAGES

Title page                                                                                                i

Certification                                                                                            ii

Dedication                                                                                              iii

Acknowledgement                                                                                iv

Table of contents                                                                                  v-vii

List of tables                                                                                          viii-ix

Abstract                                                                                                    x

CHAPTER ONE

1.0 Introduction                                                                                    1

1.1 Statement of the problem                                                            1

1.2 Aim and Objectives of the study                                                                  2

1.3 Justification of the theory                                                            2-3

1.4 Scope of the study                                                                          3-4

1.5 Description of the study area                                                        4-5

1.6 Proposed Methodology                                                                  5-6

CHAPTER TWO

2.0 Literature Review                                                                              7

2.1 Tricycle as a mode of transportation                                            7

2.2 Importance of Tricycle (Keke Napep) as a mode of public Transport in an urban area                                                              8

2.3 Short coming of Tricycle                                                                  8-9

2.4 The importance of wearing helmet while riding a Tricycle        9-10

2.5 Requirement to be met by helmet used by Keke Napep riders (Tricyclist)    10-11

CHAPTER THREE

3.0 Methodology                                                                                        12

3.1 Oral Interview                                                                                      12-13

3.2 Issuing of Questionnaire                                                                    13-14

3.3 Field Work                                                                                              14

3.4 Kwara State Tricycle operation (Control Safety E.T.C)  laws 2010          14-15

CHAPTER FOUR

4.0 Analysis and Discussion of result                                                        16

4.1 Introduction                                                                                            16

4.2 Oral Interview                                                                                          16

4.3 Questionnaire                                                                                          17

4.4 Field Work                                                                                            17-18

Characteristic of operators (Tricyclist)                                                  21-23

Challenges or factors militating against the smooth running 

of the trade                                                                                      21

CHAPTER FIVE

5.0 Conclusion and Recommendation                                                           23

5.1 Conclusion 

5.2 Recommendation                                                                                23

      References                                                                                          24       


EVALUATION OF TRICYCLE AS PUBLIC TRANSPORT SYSTEM IN AN URBAN AREA (A CASE STUDY OF IPATA-SANGO, ILORIN)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0158
  • Access Fee: ₦5,000 ($14)
  • Pages: 18 Pages
  • Format: Microsoft Word
  • Views: 326
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Civil Engineering
    Project ID CVE0158
    Fee ₦5,000 ($14)
    No of Pages 18 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This project goes into detailed evaluation of tricycle as public means of transport system in an urban area with a particular reference to Ipata-Sango, Ilorin metropolis selected as the case study. The project reviews existing literature on Tricycle ( Keke Napep) within Ipata-Sango, Ilorin. Inclusive are the circumstances that led to the... Continue Reading
    ABSTRACT Drug/substance abuse is one of the major problems confronting the nation today especially among the youth. Incidences of drug/substance and alcohol abuse and related anti-social behaviour have tremendously increased in recent years. This has become a matter of concern to the government, parents, teachers, non-governmental organisations... Continue Reading
    TABLE OF CONTENTS                                                                                                     PAGE TITLE PAGE                                                     ... Continue Reading
    TABLE OF CONTENTS CHAPTER ONE 1.0       Introduction 1.1       Background of the study 1.2       Objective of the study 1.3       Scope of the study 1.4       Research hypothesis 1.5       Significance of the study 1.6       Delimitation of the study 1.7       Definition of major terms CHAPTER TWO 2.0... Continue Reading
    TABLE OF CONTENT Title page                                                                               i Certification                                                                          ... Continue Reading
    ABSTRACT This project “maintenance of urban infrastructures (a case study of Ilorin metropolis)” lays emphasis on the various Infrastructures such as Roads, Rail, Electricity, Water-Supply, Solid Waste Management Facilities, Drainage Facilities and Sewerage. The various magnitude and the facilities provided were looked upon; the various... Continue Reading
    TABLE OF CONTENTS Title Page……………………………………………………………………………………...i Certification……………………………………………………………………………………ii... Continue Reading
    ABSTRACT This project “maintenance of urban infrastructures (a case study of Ilorin metropolis)” lays emphasis on the various Infrastructures such as Roads, Rail, Electricity, Water-Supply, Solid Waste Management Facilities, Drainage Facilities and Sewerage. The various magnitude and the facilities provided were looked upon; the various... Continue Reading
    TABLE OF CONTENTS   CONTENTS                                                                                                   PAGES   Title page-----------------------------------------------------------------------------------------------------i... Continue Reading
    TABLE OF CONTENTS   CONTENTS                                                                                                   PAGES   Title page-----------------------------------------------------------------------------------------------------i... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us