Most Read Quantity Surveying Project Topics and Materials (Page 4)

Showing 76 - 90 of 90

76) ASSESSMENT OF RISK MANAGEMENT PRACTICES AMONGST QUANTITY SURVEYORS IN THE NIGERIAN CONSTRUCTION INDUSTRY

: The construction industry requires continuous evaluation and  formulation of risk management index, but Nigeria is yet to introduce a risk  rating tool for the industry. This paper therefore assessed risk management  practice in Nigeria construction industry and establishes Risk Management  Index (RMI). Structural questionnaire were... Continue Reading

77) IMPACT OF CASH FLOW AND RESOURCE CONTROL IN CONSTRUCTION PROJECTS AND DELIVERY

ABSTRACT Construction projects are complex and risky. According to the literature, even profitable construction companies can fail due to poor cash flow. In order to survive in this rapidly changing environment, effective cash flow management is essential. Many unforeseen factors affect a construction project’s cash flow. The objective of the... Continue Reading

78) EFFECT OF QUALITY CULTURE ON BUILDING CONSTRUCTION PROJECT IN NIGERIA: A CASE STUDY OF KWARA STATE

Research aim and objective Research question Research hypothesis Delimitation and Scope of the study Definition of Terms4 Chapter Two: Literature Review  The Construction Industry 6        Culture 6 Quality 8 Key performance indicators (KPI)9 Quality Culture9      Element of quality culture  Factors affecting the maintenance of quality... Continue Reading

79) AN ASSESSMENT OF BUILDING COLLAPSE IN NIGERIA (EDO STATE AS A STUDY AREA)

Abstract The age-less interaction between man and his built environment has always had positive and negative impacts on the two. Environmental disaster of varying origin from man-made to natural is one of the most negative effects of the built environment on man. An assessment of the magnitude of these disasters and an evaluation of the existing... Continue Reading

80) AS-BUILT SURVEYING FOR THE FACILITY RETROFITTING OF AN OFFSHORE GAS PLANT USING LEICA SCANSTATION 2 HIGH DEFINITION SURVEYING INSTRUMENT

ABSTRACT  3D as-built models have been utilized over the years as an aid to several engineering activities and there are conventional survey methods; e.g. Total Station ray method, photogrammetric technique etc., with which the data required for these models are generated. These methods have proven not to be optimal in capturing datasets required... Continue Reading
  • Type:Project
  • ID:QUS0088
  • Pages:143

81) ASSESSMENT OF ENVIRONMENTAL IMPACT OF CONSTRUCTION WORKS (A CASE STUDY OF ROAD OF OKE-ONIGBIN VIA ISIN TO OBA ISIN L.G.A. IN KWARA STATE)

ABSTRACT The project works tends to analyse the environmental impact Assessment of construction works, a case study of the road construction in Oke-Onigbin via Isin LGA of kwara state. Chapter one introduce the topic and the aim and objective, chapter two states the review of related literatures and various effects of construction work and methods... Continue Reading

82) ASSESSMENT OF THE USAGE OF ICT TOOL IN THE DEVELOPMENT OF CONSTRUCTION INDUSTRY IN NIGERIA (A CASE STUDY OF PRACTICING FIRMS IN LAGOS STATE)

Abstract The construction industry is so hierarchical and fragmented in nature that some of the major participants do not consider themselves to be part of the same industry (Hindle, 2000).  This requires close coordination among a large number of specialized but interdependent organizations and individuals to achieve the cost, time and quality... Continue Reading

83) THE COMPARATIVE ANALYSIS OF RECREATIONAL FACILITIES FOR HOUSING ESTATES (A CASE STUDY OF ADEWOLE HOUSING ESTATE, ILORIN KWARA STATE)

TABLE OF CONTENTS Title page Certification Dedication Acknowledgment Abstract Table of contents List of Maps List of Tables List of Figures List of Plate’s CHAPTER ONE: INTRODUCTION 1.1 Introduction 1-2 1.2 Statement of problems 2 1.3 Aims of the project 3 1.4 Objective of the study 3 1.5 Justification 3-4 1.6 Scope and Limitation 4 1.7 Project... Continue Reading

84) ASSESSMENT ON AFFORDABILITY OF FEDERAL HOUSING ESTATE

CHAPTER ONEINTRODUCTION 1.1 BACKGROUND TO THE STUDY   Housing can be defined as buildings or structures that individuals and theirfamily may live in that meet certain federal regulations. Housing provision policiesand approaches have long been implemented in many developing nations in a bid toenhance its affordability as an inevitable human need... Continue Reading

85) THE IMPACT OF ECONOMIC RECESSION ON PUBLIC PROJECT DELIVERY IN EKITI STATE, NIGERIA

ABSTRACT This study identified the impact of economic recession on public project delivery Ekiti state,Nigeria. Economic recession is a barrier to the completion of a project delivery. Thisisacommonissueencounteredin the construction industry across the globe most especially in the developing countries. Ekiti-State,more than15% of construction... Continue Reading

86) COMPARATIVE STUDY OF RELEVANCY OF HIGHER NATIONAL DIPLOMA AND BACHELOR OF SCIENCE TRAINING TO CORE QUANTITY SURVEYING PRACTICES

ABSTRACT Deployment of appropriate skills and competencies is crucial and germane to the development and continuous relevance of any profession. In the built environment, the art of selecting the required skills and competencies expected of quantity surveyors and understanding the inherent dependencies between them remains a research issue. The... Continue Reading

87) AN INVESTIGATION ON UTILIZATION OF QS BASED SOFTWARES

CHAFTER ONE INTRODUCTION 1.1 BACKGRUOND TO THE STUDY According to (Oyediran & Odusami, 2005). The explosive growth of the information andcommunication technology (ICT) has gained unquantified impact on business systemsand   processes.   However,   global   acceptance   and   widespread   adoption   of   ICT   hasaccelerated the... Continue Reading

88) TOPOGRAPHICAL SURVEYING OF GOVERNMENT TECHNICAL COLLAGE IDAH KOGI STATE

ABSTRCT This project aimed purposely at the production of topographic plan of Government technical college idah Kogi State. The following surveying methods are carried out to achieve this project. A reconnaissance surveying of the area to be survey was carried out before other topographical surveying method was carried out total station traversing... Continue Reading

89) BIOCHEMICAL ANALYSIS OF ADULTERANTS IN MILK

Work on finding the milk quality and Adulterants present in the milk for decreasing their quality and increasing quantity.... Continue Reading

90) APPLICATION OF REMOTE SENSING AND GIS IN THE POPULATION STUDY OF ACHARA LAYOUT ENUGU, ENUGU STATE, NIGERIA

ABSTRACT This project is an attempt to study population distribution in Achara Layout Enugu, in Enugu State through integration of Remote sensing and Geographic Information System (GIS). The Remote sensing data used in this study included high spatial resolution Quick Bird imagery. Questionnaires were given out for use in generating the desired... Continue Reading
Need help with your Quantity Surveying Project Topic? Click here to request assistnce or reach us on + 234 813 0686 6500
whatsappWhatsApp Us