MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0012
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 67 Pages
  • Methodology: Scientific
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Nigeria construction industry. A self-administered questionnaire survey was used to source information on the quantitative (project scope) factors considered in the study as well as to assess the extent of influence of the qualitative factors on construction time. Principal component regression was used for the data analysis and model development, using SPSS 16.0 for windows. Following a non-normal distribution of errors and a low R2 value obtained when multiple linear regression analysis was first conducted, the study’s data set was double log transformed and then partitioned/reclassified to account for public and private sector projects. Three models were developed following the multiple linear regression analysis repeated after transforming and partitioning/reclassifying the study’s data set. Two of these models (the public sector model and the private sector model) had high R2 values and were found after testing and validation, to be suitable for predicting construction time, while one of the models (the all projects model) had a low R2 value and was consequently found to be unsuitable for predicting construction time. The models with high R2 values serve as a useful
tool to project managers and contractors for predicting construction time, thereby facilitating effective planning.





CHAPTER 1
INTRODUCTION
1.1 Background to the study
The importance of ensuring accuracy and reliability of construction time estimates at the tendering stage cannot be overemphasized. Accurate early estimates of construction time typically provides clients and contractors with a basis for evaluating the success of a project and the efficiency of the project organisation (Nkado, 1995). They also provide them with a basis for ascertaining logistical and cash flow implications for feasibility, budgeting, planning, monitoring and even litigation purposes (Skitmore and Ng, 2003). Furthermore, they serve as a criteria in determining the best combination when performing time-cost optimization (Que, 2002). It is therefore clear that construction time has become a vital tool used by clients and contractors to ensure the success of construction projects. This success will however, only be achieved when construction time is accurately predicted.
Construction time/periods are often calculated on the basis of the planner’s own previous experience on similar projects (Choudhury and Phatak, 2004). However, as pointed out by Skitmore and Ng (2003), the need to reduce the problem of subjectivity associated with the planner’s experience and judgement to correctly interpret project and site information and make the best possible decisions, has long resulted in the development of construction time predicting models.
The development of construction time predicting models commenced with the use of project scope factors. Project scope is a measure of project size, which can be described as construction cost, project duration, gross floor area, number of storey, building type and procurement method (Walker, 1995).
MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0012
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 67 Pages
  • Methodology: Scientific
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Quantity Surveying
Project ID QUS0012
Fee ₦5,000 ($14)
Chapters 5 Chapters
No of Pages 67 Pages
Methodology Scientific
Reference YES
Format Microsoft Word

Related Works

ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
ABSTRACT Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
ABSTRACT  Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
ABSTRACT   Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
Abstract This research project present the use of building survey for maintenance of buildings. It used analytic model and field studies on improper building maintenance to discuss the causes and remedial measures to be used. It was discovered that low level of awareness about building survey is the major problem of our building maintenance (i.e... Continue Reading
  ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
CHAPTER ONE INTRODUCTION The subject of airport passenger terminal building must involve a discussion of transportation. Transportation has remained one of the most vital factors that influence the development of a nation. The credibility of... Continue Reading
ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
Topic : The environmental impacts of building constructions as expressed by the stakeholders in building and construction industry. Key words: Environmental Impact Assessment (EAI,Sustainable Development: Development, Regulation,Global Warning, Ecosystem, Green house Gas (GHG) ABSTRACT This study investigated the environmental impacts of building... Continue Reading
This study is on an Appraisal of application of building facility maintenance of public buildings in Federal poly Oko. Some of the objectives include; determining the nature and types of public building, to examine the current condition and state of maintenance of public buildings, to identify the underlying factors that militated to poor... Continue Reading
Call Us
whatsappWhatsApp Us