A PROPOSAL ON ASSESSMENT OF RISK ON ROAD PROJECTS IN NIGERIA CONSTRUCTION INDUSTRY (A CASE STUDY OF LAGOS METROPOLIS)

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0069
  • Access Fee: ₦5,000 ($14)
  • Pages: 62 Pages
  • Format: Microsoft Word
  • Views: 229
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

TABLE OF CONTENT

Title page                                                                       i

Certification                                                                   ii

Dedication                                                                     iii

Acknowledgement                                                          iv

Abstract                                                                         v

Table of Content                                                             vi

CHAPTER ONE:

1.0    Introduction

1.1    Background of the study

1.2    Statement of problems

1.3    Research questions   

1.4    Aim and Objectives

1.5    Justification of the study

1.6    Scope and Limitation of the study

1.7    Research Methodology

CHAPTER TWO

         Literature review

2.0    Introduction

2.1    Nature of civil engineering project

2.2    Road

2.2.1 Road construction

2.2.2 State of roads in Nigeria

2.3    Risk in construction

2.4    Risk exposure

2.5    Risk management

2.6    Types of risk

2.6.1 Controllable and Uncontrollable risk

2.6.2 Pure risk and speculative risk

2.7    Identifying risk and risk factors

2.8    Impact of risk on total construction cost and project duration

2.9    Risk analysis

2.10  Risk response

2.10.1 Risk avoidance

2.10.2 Risk retention

2.10.3 Risk deduction

2.10.4 Risk Transfer

CHAPTER THREE

Research Methodology

3.0    Introduction

3.1    Study population

3.2    Sample size and sampling procedure

3.3    Design of Questionnaire

3.4    Method of data analysis

CHAPTER FOUR

Data presentation and data analysis

4.0    Introduction

4.1    Data analysis and result interpretation

CHAPTER FIVE

Summary, Conclusion and  Recommendation

5.0    Conclusion

5.1    Recommendation

References

CHAPTER ONE

1.0    INTRODUCTION

 I.I   BACKGROUND OF THE STUDY

Consequences of uncertainty and its exposure in a project, is risk. In a project context, risk is the chance of something happening that will have an impact upon objectives. It includes the possibility of loss or gain, or variation from a desired or planned outcome, as a consequence of the uncertainty associated with following a particular course of action. (Deviprasadh, 2007). Risk thus has two elements: the likelihood or probability of something happening, and the consequences or impacts if it does. Managing risk is an integral part of good management; it is fundamental to achieving good business and project outcomes and the effective procurement of goods and services Risk management provides a structured way of assessing and dealing with future uncertainly. Project risk management includes the processes concerned with identifying, analyzing, and responding to project risk. It includes maximizing the results of positive events and minimizing the consequences of adverse events." (Deviprasadh, 2007).

A PROPOSAL ON ASSESSMENT OF RISK ON ROAD PROJECTS IN NIGERIA CONSTRUCTION INDUSTRY (A CASE STUDY OF LAGOS METROPOLIS)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0069
  • Access Fee: ₦5,000 ($14)
  • Pages: 62 Pages
  • Format: Microsoft Word
  • Views: 229
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Quantity Surveying
    Project ID QUS0069
    Fee ₦5,000 ($14)
    No of Pages 62 Pages
    Format Microsoft Word

    Related Works

    TABLE OF CONTENT Title page                                                                       i Certification                                                                   ii... Continue Reading
    ABSTRACT This study sought risk management and performance of UNDP projects in Somalia: a case study of Mogadishu to cadale road construction projet.~t. The objectives were; To establish relationship between risk identification and project performance of Mogadishu to Cadale Road Construction project, To assess the relationship between risk... Continue Reading
    Background of the Study:    Every construction company all over the world expects not only to break even in every project undertaken, but to also make a reasonable level of profit that will satisfy the owners of the company. This is only possible if the activities involved in undertaking  any particular project are optimized, viz-á-viz the... Continue Reading
    Background of the Study: Every construction company all over the world expects not only to break even in every project undertaken, but to also make a reasonable level of profit that will satisfy the owners of the company. This is only possible if the activities involved in undertaking any particular project are optimized, viz-á-viz the factors of... Continue Reading
    Abstract The construction industry is so hierarchical and fragmented in nature that some of the major participants do not consider themselves to be part of the same industry (Hindle, 2000).  This requires close coordination among a large number of specialized but interdependent organizations and individuals to achieve the cost, time and quality... Continue Reading
    : The construction industry requires continuous evaluation and formulation of risk management index, but Nigeria is yet to introduce a risk rating tool for the industry. This paper therefore assessed risk management practice in Nigeria construction industry and establishes Risk Management Index (RMI). Structural questionnaire were administered to... Continue Reading
    : The construction industry requires continuous evaluation and  formulation of risk management index, but Nigeria is yet to introduce a risk  rating tool for the industry. This paper therefore assessed risk management  practice in Nigeria construction industry and establishes Risk Management  Index (RMI). Structural questionnaire were... Continue Reading
    This study undertakes a critical analysis of risk management as a formal technique for managing risks in project execution. It specifically probes into the proximate sources of risk into construction projects in Nigeria, the level of awareness and use of the technique amongst Nigerian construction professionals with a view to properly situating... Continue Reading
    ABSTRACT This study undertakes a critical analysis of risk management as a formal technique for managing risks in project execution. It specifically probes into the proximate sources of risk into construction projects in Nigeria, the level of awareness and use of the technique amongst Nigerian construction professionals with a view to properly... Continue Reading
    ABSTRACT The construction industry is one of the largest job creators in developing countries and is highly competitive. Achieving success in public construction projects is difficult because it requires economy, efficiency, quality, fairness and transparency. Construction projects are undertaken upon the request of owners/clients and almost... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us