A CRITICAL ANALYSIS OF RISK MANAGEMENT IN PROJECT EXECUTION: A STUDY OF SELECTED CONSTRUCTION PROJECTS

  • Type: Project
  • Department: Project Management
  • Project ID: PRM0035
  • Access Fee: ₦5,000 ($14)
  • Pages: 138 Pages
  • Format: Microsoft Word
  • Views: 201
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

This study undertakes a critical analysis of risk management as a formal technique for managing risks in project execution. It specifically probes into the proximate sources of risk into construction projects in Nigeria, the level of awareness and use of the technique amongst Nigerian construction professionals with a view to properly situating the remote causes of project distress and abandonment in Nigeria. In carrying out the study, large scale construction projects were targeted. Primary data came from a Personal Contact Interview Approach using Objective Evaluation Questionnaires on top Project managers, Engineers, Quantity surveyors and Architects in the projects. Textbooks, professional journals and conference/workshop papers provided the input for the secondary data. Analysis of feedback was by factor analysis and regression analysis. The study found out that the level of awareness and application of sophisticated tools and techniques of risk management among construction professionals in Nigeria is low. Also it was found out that design efforts, construction activities and environmental issues constitute proximate sources of risk to construction projects. The conclusion therefore is that the high incidences of construction project failures and abandonment can be significantly attributed to the low level of awareness and consequently inadequate application of modern techniques of risk management by construction professionals. The study therefore makes a recommendation for capacity building in the relevant areas of risk management for professionals in the Nigerian construction industry among others.

A CRITICAL ANALYSIS OF RISK MANAGEMENT IN PROJECT EXECUTION: A STUDY OF SELECTED CONSTRUCTION PROJECTS
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0035
  • Access Fee: ₦5,000 ($14)
  • Pages: 138 Pages
  • Format: Microsoft Word
  • Views: 201
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Project Management
    Project ID PRM0035
    Fee ₦5,000 ($14)
    No of Pages 138 Pages
    Format Microsoft Word

    Related Works

    This study undertakes a critical analysis of risk management as a formal technique for managing risks in project execution. It specifically probes into the proximate sources of risk into construction projects in Nigeria, the level of awareness and use of the technique amongst Nigerian construction professionals with a view to properly situating... Continue Reading
    ABSTRACT This study undertakes a critical analysis of risk management as a formal technique for managing risks in project execution. It specifically probes into the proximate sources of risk into construction projects in Nigeria, the level of awareness and use of the technique amongst Nigerian construction professionals with a view to properly... Continue Reading
    ABSTRACT This study sought risk management and performance of UNDP projects in Somalia: a case study of Mogadishu to cadale road construction projet.~t. The objectives were; To establish relationship between risk identification and project performance of Mogadishu to Cadale Road Construction project, To assess the relationship between risk... Continue Reading
    EFFECTIVENESS OF QUALITY ASSURANCE STRATEGIES IN PROJECT EXECUTION (A STUDY OF ROAD CONSTRUCTION PROJECTS IN OWERRI) CHAPTER ONE INTRODUCTION 1.1 Background Of The Study Over the years, most projects in organizations especially those of the Zerock, Rhas and New Idea Construction companies in Owerri, might have been subjected to poor performance... Continue Reading
    Background of the Study:    Every construction company all over the world expects not only to break even in every project undertaken, but to also make a reasonable level of profit that will satisfy the owners of the company. This is only possible if the activities involved in undertaking  any particular project are optimized, viz-á-viz the... Continue Reading
    Background of the Study: Every construction company all over the world expects not only to break even in every project undertaken, but to also make a reasonable level of profit that will satisfy the owners of the company. This is only possible if the activities involved in undertaking any particular project are optimized, viz-á-viz the factors of... Continue Reading
    ABSTRACT In the public procurement system in Nigeria has over the years been abused leading to cost inflation, delay in project delivery, poor quality of work, and project abandonment. The aim of this study is to examine the impact of the due process policy on construction projects delivery in Nigeria. Data were collected using a structured... Continue Reading
    ABSTRACT  Performance of construction projects in Kenya is a matter of great concern to stakeholders, as most of the construction projects have experienced delays and cost overruns which have adversely affected their performance. Construction projects are very prone to risk which have the significant impact on their performance in terms of time,... Continue Reading
    TABLE OF CONTENT Title page                                                                       i Certification                                                                   ii... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us