FACTORS INFLUENCING THE ENACTMENT OF MONITORING AND EVALUATION ON EFFECTIVE PUBLIC SERVICE SYSTEMS IN THE SMALL ISLAND DEVELOPING STATE OF SAINT LUCIA: A CASE OF THE DEPARTMENT OF EXTERNAL AF

  • Type: Project
  • Department: General Management
  • Project ID: GMG0005
  • Access Fee: ₦5,000 ($14)
  • Pages: 86 Pages
  • Format: Microsoft Word
  • Views: 1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

The purpose of this research was to identify factors influencing the enactment of monitoring and evaluation(M&E) required for enacting effective public service systems, Furthermore, this research was carried out in order to determine whether these factors are present within the Public Service of the Small Island Developing State (SIDS) of Saint Lucia, with a focus on the Department of External Affairs. The objectives of the research were in keeping with the independent variables of the research which seek to assess whether there is management buy-in within the Department of External Affairs for monitoring and evaluation, to determine whether adequate resources are allocated for the conduct of M & E and to establish whether M & E tools are utilised in the conduct of the work of the Department. The research was guided by the Theory of Change which assisted in determining how and why a phenomenon is occurring. The research's target population was the staff of the Department of External Affairs based at Capital which totals 34. The total population formed part of the research using the census methodology given that the population is considered small. The study employed descriptive and exploratory design and solicited information from the staff of the Department of External Affairs through questionnaire which was self-administered. The questionnaire was tested for validity and reliability through the use of face validity and the test and retest method respectively. Data was analysed through descriptive analysis through the use of Excel Microsoft software and will be presented in figures and tables. The research findings revealed that staff at the Department of External Affairs overall did not agree that the independent variables of management buy-in, adequate resources and monitoring and evaluation tools were available at the Department to conduct M & E. Furthermore, respondents disagreed that the development of an M & E policy or plan was a priority for the Department. Respondents however agreed that the independent variables were necessary for the implementation of an M & E system and also agreed about the benefits in developing of an effective public service system. The study concluded that the Theory of Change assisted respondents in understanding the connection between the variables. Furthermore, the study concluded that the factors for M & E development needed to be implemented within the Department given its importance. It was recommended that the development of an M & E policy be conducted in collaboration with staff to ensure buy-in, relevance and utility of the policy. Given the exploratory nature of the study, it is imperative to determine in the absence of the factors for M & E at the Department, how does the Department conduct monitoring and evaluation of its processes and systems. Furthermore, the scope of study will need to be expanded to include the staff of the Department in overseas embassies. Ultimately, the study will be used to benefit the Department of External Affairs and by extension the Government of Saint Lucia (GOSL) by contributing to a better understanding of M & E by the management and staff of the Department.

FACTORS INFLUENCING THE ENACTMENT OF MONITORING AND EVALUATION ON EFFECTIVE PUBLIC SERVICE SYSTEMS IN THE SMALL ISLAND DEVELOPING STATE OF SAINT LUCIA: A CASE OF THE DEPARTMENT OF EXTERNAL AF
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: General Management
  • Project ID: GMG0005
  • Access Fee: ₦5,000 ($14)
  • Pages: 86 Pages
  • Format: Microsoft Word
  • Views: 1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department General Management
Project ID GMG0005
Fee ₦5,000 ($14)
No of Pages 86 Pages
Format Microsoft Word

Related Works

ABSTRACT The purpose of this research was to identify factors influencing the enactment of monitoring and evaluation(M&E) required for enacting effective public service systems, Furthermore, this research was carried out in order to determine whether these factors are present within the Public Service of the Small Island Developing State (SIDS) of... Continue Reading
ABSTRACT Monitoring and evaluation has been a key performance management tool for planning, decision making and economic policy management. However, evidence from literature point out that in Sub-Saharan Africa substantial M&E achievements on the ground are rare. The County Governments has been facing serious challenges in managing the projects... Continue Reading
ABSTRACT Due to intense competition within the service industry, there is need for institutions to capture a wider market in order to remain sustainable. This has to be through investing in managerial research. Most hospitals do not take marketing and research as a necessity; they feel it is more of an added cost/expense. So the objective of this... Continue Reading
TABLE OF CONTENTS ABSTRACT............................................................................................................................................. i AUTHORISATION PAGE ................................................................................................................... iii... Continue Reading
ABSTRACT It is a precondition by benefactors that every proposal must have provision for effective M&E Systems costed for and performed by skilled M&E staff. Donors have further recommended that ten percent of the financial resources must be set aside for performing M & E in donor funded projects. However, this is not the case in primary education... Continue Reading
ABSTRACT This research studied management of pension schemes in Nigeria public service. Using the Department of pensions/establishment Enugu State Public Service, as a case study. The need for the study rose... Continue Reading
ABSTRACT This research work has examined the importance of Sound and Visual aesthetics especially in theatrical productions. It draws the attention of directors to the meaning of Sound and Visual aesthetic in play production in determining the mood of the audience, the beauty and success of the play knowing fully well that the audience have to be... Continue Reading
TABLE OF CONTENTS PAGE DECLARATION (I) APPROVAL (ii) DEDICATION (iii) ACKNOWLEDGEMENT (IV) ABSTRACT (V) THE PROBLEM AND ITS SCOPE 1 INTRODUCTION 1 Rationale of the study 1 ~Theory 4 Revi~V~ of the related Literature 6 Significance of the study 22 Objectives 23 Statement of the null hypothesis 24 RESEARCH METHODOLOGY 25 Design 25 Environment 25... Continue Reading
Abstract The Judicial Service as the third arm of the government of Ghana is the body mandated by the country’s constitution to dispense justice in the country, in a manner that peace, tranquility and stability prevail to ensure socio-economic development. In court operations in the country however, effectiveness, efficiency and speed of justice... Continue Reading
ABSTRACT Incidents of poor performance of community projects have been documented by various research studies. Many projects encounter delays in implementation, poor quality of projects, time and cost overruns that affect the overall achievement of project objectives (Ramathan et al., 2012). The major problem being that introduction of technology... Continue Reading
Call Us
whatsappWhatsApp Us