IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA

CHAPTER ONE

INTRODUCTION

1.1   BACKGROUND TO THE STUDY

The Nigerian building and construction industry continues to occupy an important position in the nation’s economy even though it contributes less than the manufacturing or other service industries, (Aibinu and Jagboro, 2002). The contribution of the building and construction industry to national economic growth necessitates improved efficiency in the industry by means of cost effectiveness and timeliness, and would certainly contribute to cost savings for the country as a whole. It is also common knowledge that the implementation of the construction project in the industry is usually accompanied with poor quality delivery and delivery time delay and cost increase as well as owner dissatisfaction (Hafez, 2001). Thus, the efficient use and management of material have an importance influence on a company's profit and can delay project construction (Abdul­ Rahman and Alidrisyi, 1993). The researchers will examine the impact of material management on project delivery in Nigeria.

Material management is a planned procedure that include, the purchasing, delivery, handling and minimization of waste with the aim of ensuring that requirement are met (Illingworth and Thain, 1998). According to Culvert (1998), a detailed material schedule and co-ordination of the requisition and order of material are important in assuring material availability. Efficient material planning is a key to high productivity on site. Material planning embraces quantifying, ordering and scheduling-. Productivity will suffer if the material planning process is not executed properly (Kaming, Olomolaiye, Holt and Harris, 1997).

Kwik (1994) stated that another issue (which is sometime beyond management control) is material shortages, for example yearly cement shortages have long been a topic of debate within the construction industry. Bell and Stukhart (1987) investigated a total concept for a Material Management System (MMS), which combined and integrated the take-off, vendor evaluation, purchasing expediting, and warehousing and distribution functions of material. The system resulted in improved labour productivity, reduced material surplus, reduced material management, manpower and cost saving. A1-Jibouri (2002) described a computer simulation model, which helps to solve the problem of order and deliveries of materials in real life by keeping a predetermined list of order and delivery time of all the materials on site. The delivery of each kind of material then takes place automatically at the specified time.

Ineffective materials management for projects can result in significant cost blow-outs and delays in project completion. Such cost inefficiencies will negatively impact global competitiveness, and owner operators and engineering, procurement, and construction companies are trying to streamline work processes for their projects. Inaccurate materials information, such as incorrect bills of materials, inaccurate cycle counts, shipping errors, receiving errors and so on, will also affect the overall project life cycle and increase project costs. Having to deal with subcontractors outside of the materials management process impacts the overall project supply chain as there is an increased risk of data inconsistencies.

Material management is the system for planning and controlling to ensure that the right quality and quantity of materials and equipment are specified in a timely manner. Materials should be obtained at a reasonable cost, and be available for use when needed. The cost of materials represents a large proportion of the cost. A good management system for materials management will lead to benefits for construction. Cash flow has become crucial for the survival of any business, if materials are purchased early, capital may be tied up and interest charges incurred on the excess inventory of material. Material may deteriorate during storage or be stolen; also delays and extra expense may be incurred if materials required for particular activities are not available.

Despite the importance of the materials, very little research has been directed towards understanding the management of materials from order to production; most research is focused upon the management of the design and procurement process and on labour site productivity. Materials management, which includes procurement, shop fabrication, logistics, supply chain management, production on site, and field servicing, requires special attention to achieve cost reduction. The supply chain is a convenient term used to describe a complex web of activities. The use of new equipment and innovative methods of materials handling has influenced changes in construction technologies in recent years.

Modern methods of material management have been embraced by the manufacturers across a wide range of industry sectors outside of construction.

1.2   STATEMENT OF THE PROBLEM

Ogunlana and Proukumtong (1996) studied construction delays in a fast growing economy: comparing Thailand with Nigeria and some of the construction delays were attributed to material management: the study blames material shortage on site on unreliable supply from material suppliers occasioned by the general shortage in the industry, although there were specific instances in which poor communication between sites and head office purchasing, planning and co-ordination could be cited. However, much research has not be done on material management and project delivery in Nigeria considering the economic situation of Nigeria and the market full of substandard products. This study will therefore examine the impact of material management of project delivery in Nigeria in terms of quality and time.

1.3   OBJECTIVES OF THE STUDY

The following are the objectives of this study:

1.  To examine the impact of material management on project delivery time in Nigeria.

2.  To examine the impact of material management on project quality upon delivery in Nigeria.

3.  To determine the advantages and disadvantages of material management in project construction.

1.4   RESEARCH QUESTIONS

1.  What is the impact of material management on project delivery time in Nigeria?

2.  What is the impact of material management on project quality upon delivery in Nigeria?

3.  What are the advantages and disadvantages of material management in project construction in Nigeria?

1.5   HYPOTHESIS

HO: Material management does not affect project delivery in Nigeria

HA: Material management does affect project delivery in Nigeria

 

 

1.6   SIGNIFICANCE OF THE STUDY

This study will be of importance to building professionals and the general public because it would not only clarify but also create awareness of the extent to which inadequacies in material management can adversely affect project delivery. The study will also help contractors, clients, consultants and all parties involved in construction projects about ways of improving their current method of material management. This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic.

1.7   SCOPE/LIMITATIONS OF THE STUDY

The scope of this study on impact of material management on project delivery in Nigeria will cover all the project construction in Nigeria looking at their level of adoption of material management approach considering their successes with respect to project delivery quality and time.

LIMITATION OF STUDY

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

 Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

REFERENCES

Abdul-Rahman,. H. and Alidrisyi, M. N. (1994) “A Perspective of Material Management Practices in a Fast Developing Economy; the case of Malaysia”. Construction Management and Economics, 12, 412-422.

Aibinu A.A and Jagboro G.O (2002): “The Effects of Construction Delays on Projects Delivery in Nigeria Construction Industry”. International Journal of Project Management, 20, 593-599.

Al-Jibouri, S. (2002): “Effects of Resource Management Techniques on Projects Schedules”. International Journal of Project Management,   20, 627-632

Kwik.K.G. (1994): “Cement and Its Problem in Indonesia”. Kompas October. 10

Illingworth, J. and Thain, K. (1998): “Material Management is it Worth It?” Technical Information Service, The Chartered Institute of Building ASCOT. 93, 1-5

Kaming, P.F, Olomolaiye, P. O., Holt, G.O. and Harris F.C. (1997): “Factors Influencing Construction Time and Cost Overruns on High-Rise Project in Indonesia”. Construction Management and Economics, 15, 83-94

Hafez, N (2001): “Residential Projects Obstacles and problems in Kuwait MS Project”, Department of Civil Engineering, Kuwait University.

Culvert, O. (i998): “Correlates of time Overrun in Commercial Construction”. ASC Proceedings of the 40th Annual Conference. Brigham Young University, Provo, Utah, April 8-10.

IMPACT OF MATERIALS MANAGEMENT ON PROJECT DELIVERING IN NIGERIA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Estate Management
  • Project ID: ETM0129
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Methodology: Simple Percentage
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.8K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Estate Management
    Project ID ETM0129
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Methodology Simple Percentage
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
    1.1 BACKGROUND TO THE STUDY The unceasing abandonment of residential buildings and development projects is so shocking in the developing countries such that Nigerian has remained one of the countries in such difficulty (Ayodele and Alabi, 2011; Kotangora, 1993; Osemenan, 1987). Therefore,... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1      Background of the study In banking, security is paramount to protect depositors’ funds. It is in the light of this that the Central Bank of Nigeria (CBN), through the Bankers’ Committee, Deposit Money Banks and Nigeria Interbank-Settlement... Continue Reading
    ABSTRACT The way we work in our fast-paced world is quickly changing. Skilled but unemployed Kenyans are seeking and finding work on online platforms on contract and full – time basis. They are part of virtual teams that rely heavily on collaborative software applications to work. Their performance is gauged by how they meet project goals within... Continue Reading
    ABSTRACT Across the globe, studies have shown that the number of projects that are considered challenged or failed is significantly higher than those deemed successful. Further, in an ever intensively competitive market due to digital disruption, organizations are keen to implement projects successfully to avoid wastage of limited capital. The... Continue Reading
    Across the globe, studies have shown that the number of projects that are considered challenged or failed is significantly higher than those deemed successful. Further, in an ever intensively competitive market due to digital disruption, organizations are keen to implement projects successfully to avoid wastage of limited capital. The purpose of... Continue Reading
    ABSTRACT The research stresses on the impact of IT in materials management. The efficient management of materials with IT partly accounts for high productivity. The report is divided into five sections. The first section deals with the background of the study in which the researcher elaborated on the basis and significance of the impact of IT in... Continue Reading
    ABSTRACT The research stresses on the impact of IT in materials management. The efficient management of materials with IT partly accounts for high productivity. The report is divided into five sections. The first section deals with the background of the study in which the researcher elaborated on the basis and significance of the impact of IT in... Continue Reading
    CHAPTER ONE INTRODUCTION 1.1     Background of the Study To manage materials is to manage the life of an organization. No organization can survive without adequate management of materials. The bottom line and effective flow of input material either purchased from outside manufacturing or made in house. Stocking of materials of minimum cost is... Continue Reading
    ABSTRACT This study sought risk management and performance of UNDP projects in Somalia: a case study of Mogadishu to cadale road construction projet.~t. The objectives were; To establish relationship between risk identification and project performance of Mogadishu to Cadale Road Construction project, To assess the relationship between risk... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us