THE DESIGN AND CONSTRUCTION OF HOUSE BELL WITH INDICATING LIGHT

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0421
  • Access Fee: ₦5,000 ($14)
  • Pages: 29 Pages
  • Format: Microsoft Word
  • Views: 796
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
 ABSTRACT
The design and construction of the House Bell with indicating light system was creative embarked on for the production of a better alarm signals. Meanwhile different measures and steps such as using electric bell, electric bulb, light emitting diode, 1 mm2 their cable, B Amps plug, lamp holder was used to achieve the objective. All the measures that were taken to ensure the functionality of this project were discussed in detail. 
Finally, conclusion and recommendation that will enable further quest and improvement in this project were carefully and creatively discussed.

 
TABLE OF CONTENTS 
Title Page
Approval Page 
Acknowledgement
Dedication 
Abstract 

CHAPTER ONE
INTRODUCTION 

CHAPTER TWO 
LITERATURE REVIEW 
Preamble
Essential Parts or Features of an Electric Ball
The Main Call Line
The sub – Call Line 

CHAPTER THREE 
MATERIALS AND METHODOLOGY    
Introduction
Materials 
The Wooden Board 
Switches
Lamp Holder
Cable 
Electric Bell 
Filament Lamp
Plug
Joint Box 
Wooden Block
Nails 
Screw Nail 
Clip 
Methodology
Mode of Connection and Construction

CHAPTER FOUR
PRINCIPLE OF OPERATION  
Schematic Diagram of an Electric Bell with Light Indictor
Mode of Operation

CHAPTER FIVE 
RESULT ANALYSIS AND DISCUSSION       
The Input Stage 
The Power Supply Stage 
Use and Economic Importance
Use of the Call System in Hotel Building

CHAPTER SIX 
CONCLUSION AND RECOMMENDATION
Problem Encountered
Conclusion      
Recommendation 

THE DESIGN AND CONSTRUCTION OF HOUSE BELL WITH INDICATING LIGHT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0421
  • Access Fee: ₦5,000 ($14)
  • Pages: 29 Pages
  • Format: Microsoft Word
  • Views: 796
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Electrical Engineering
Project ID ELE0421
Fee ₦5,000 ($14)
No of Pages 29 Pages
Format Microsoft Word

Related Works

The research topic of the study was accounts receivables and cash flow management in manufacturing industries in Uganda a case study of Uganda breweries limited. The problem was poor accounts receivables in manufacturing industries in Uganda a case study of Uganda breweries limited. The purpose of the study is to bridge knowledge, generate new... Continue Reading
CHAPTER ONE INTRODUCTION 1.1 Background Information Electricity is a general term comprising of a variety of phenomena resulting from the presence and flow of electric charge. These include many phenomena, such as lightning,... Continue Reading
CHAPTER ONE INTRODUCTION 1.1Background Information Electricity is a general term comprising of a variety of phenomena resulting from the presence and flow of electric charge. These include many phenomena, such as lightning, static... Continue Reading
. ABSTRACT In this project work, we are mostly concern about building a simple power streetlight which is automatically operated. There are four main components required to build a solar operated streetlight. The solar array, High efficiency D.C lamp section made by... Continue Reading
ABSTRACT In this project work, we are mostly concern about building a simple power streetlight which is automatically operated. There are four main components required to build a solar operated streetlight. The solar array, High efficiency D.C lamp section made by transistor, resistors, and the sensor LDR, changes controller which is made up of... Continue Reading
DEDICATION We dedicate this project work to Almighty God, the source of all knowledge, wisdom and understanding, for being there for us throughout the period of our study and to our lovely parents, Mr. and Mrs. Abido, and Sir & Lady Christopher Korugbo for their parental care, who has always been our inspiration. ACKNOWLEDGEMENTS Thanks to God... Continue Reading
ABSTRACT In this project work, we are mostly concern about building a simple power streetlight which is automatically operated. There are four main components required to build a solar operated streetlight. The solar array, High efficiency D.C lamp, changes controller and battery of which the solar array is the most expensive. It is the solar... Continue Reading
ABSTRACT The very fundamental reasons behind this project assignment is to expose student to the very important aspect of private and independent research work not only theories but also subsequent translation of the theoretical research work into a particular function system. The project construction of automatic fence light controller has been... Continue Reading
ABSTRACT The project work is on the design and construction of automatic two lane traffic light control. This system is based on digital electronics. It employs an astable multivibrator which is the clock generator that sends the clock into a time sequencing generator using a decade counter with ten (10) decodes output that has it’s binary... Continue Reading
ABSTRACT As the name of the project implies “Automatic Emergency Light” is an electronic system that can provide light during emergency situations i.e when mains (NEPA) supply fails.  This system can provide enough light with full brightness in a given room or office.   The system makes use of white light emitting diodes for the lightings.... Continue Reading
Call Us
whatsappWhatsApp Us