DESIGN AND CONSTRUCTION OF A 40FT ADJUSTABLE LADDER

  • Type: Project
  • Department: Construction Management
  • Project ID: CMG0008
  • Access Fee: ₦5,000 ($14)
  • Pages: 48 Pages
  • Format: Microsoft Word
  • Views: 2.1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT 
The work was an attempt to evolve a quicker and easier means of reaching high places and point safely in tall buildings and other high structures. This has no doubt saved consideration cost of employing cranes.   A very clear account of the introduction and literature background of the project has been discussed in details.  The report also unveils the preliminary experiments carried out to determine the load carrying capacity of the ladder.  Efforts were also made to highlight various design alternative solutions and the selection criteria for the optimum design.  Analysis of the various parts of the ladder based on service conditions were also carried out and this report contains the detailed analysis.  The detailed construction techniques which include measurement, making out, cutting, welding and assembling are also included. The project was tested to confirm its maximum efficiency and satisfactory service and that mini experiment was also recorded in the report. The report also contains the general precautions that a user has to observe to avoid accident and also to enhance the durability of the ladder.

TABLE OF CONTENTS
Title Page ii
Release Page iii
Signature Page iv
Approval Page v
Dedication vi
Acknowledgement vii
Abstract viii
Table of Contents ix

CHAPTER ONE
Introduction 1.1 1
Literature Background of the Ladder  1.2 5

CHAPTER TWO 
Synthesis of Solution 7

CHAPTER THREE
Theory and Analysis of Problems 16

CHAPTER FOUR
Fabrication technique  4.0 22
Sequence of Fabrication 4.1 24
Measurement and Making out 4.11 24
Cutting of Material 4.12 25
Welding of the material Together 4.13 25
Assembly of Work 4.14 27
Painting 4.15 28

CHAPTER FIVE 
Testing and Evaluation 5.0 29
General Safety Precautions 5.11 31
Avoiding Hazards 5.12
CHAPTER SIX
Cost Analysis 6.0 35

CHAPTER SEVEN
Conclusion 7.0 41
Recommendation 7.1 42
REFERENCES 

DESIGN AND CONSTRUCTION OF A 40FT ADJUSTABLE LADDER
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Construction Management
  • Project ID: CMG0008
  • Access Fee: ₦5,000 ($14)
  • Pages: 48 Pages
  • Format: Microsoft Word
  • Views: 2.1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Construction Management
Project ID CMG0008
Fee ₦5,000 ($14)
No of Pages 48 Pages
Format Microsoft Word

Related Works

The focus of this project was the development of an ICU/Rehabilitation adjustable bed for the hospital and home environment. The project was initiated with the desire to develop an innovative, effective and inexpensive mechanism that would require an electrical supply. The design was performed systematically using various methods, procedures,... Continue Reading
The focus of this project was the development of an ICU/Rehabilitation adjustable bed for the hospital and home environment. The project was initiated with the desire to develop an innovative, effective and inexpensive mechanism that would require an electrical supply. The design was performed systematically using various methods, procedures,... Continue Reading
ABSTRACT An insurance company promises its policyholders to pay out benefits if certain events occur, for example, events such as a car accident and health conditions. When this is happens, the insurance company has a liability to pay the claims by technical provisions or claim reserving. The calculation of claim reserving must be done carefully... Continue Reading
INTRODUCTION Radiographic viewing box is an illuminator use in viewing radiographs. Proper viewing conditions are very important when interpreting a radiograph. The viewing condition can enhance or degrade the subtle detail of the radiograph14. Before beginning the evaluation of radiograph, the viewing equipment and area should be considered. The... Continue Reading
This construction of battery powered dual face radiographic viewing box with rotatable neck and adjustable stand was carried out within Enugu metropolis. TABLE OF CONTENTS Title page - - - - - - - - - i Dedication - - - - - - - - - ii Acknowledgement - - - - - - - iii Table of contents - - - - - - - iv CHAPTER ONE Background of study - - - - - - -... Continue Reading
INTRODUCTION Radiographic viewing box is an illuminator use in viewing radiographs. Proper viewing conditions are very important when interpreting a radiograph. The viewing condition can enhance or degrade the subtle detail of the radiograph14. Before beginning the evaluation of radiograph, the viewing equipment and area should be considered. The... Continue Reading
ABSTRACT     This study was aimed primarily at highlighting the techniques, policies and concept of auditing as they relate to growth of Business Corporation. The principal focus was on the private sector which more than any other... Continue Reading
The study investigated budgetary controls and performance of Roko Construction Company in Nasser road Kampala, Uganda, it was guided by the following objectives which included determining the effect of monitoring on performance, to identify the effect of evaluation on performance, and to establish the effect of Planning on performance. The study... Continue Reading
ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
Call Us
whatsappWhatsApp Us