STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN NIGERIAN CONSTRUCTION SITES

  • Type: Project
  • Department: Building
  • Project ID: BLD0007
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 2.7K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT 

Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that this research work attempt to study the factors that are responsible, so as to identify them and proffer possible  ways of tackling the menace. The study attempt this through chosen  construction practitioners as population and samples were drawn  to this effect at random from the category of professionals, using probability sampling methods. The Data were collected from primary source consisting of structured questionnaire designed in Likert Scale in rating Scale of 1 to 5, while the Secondary Data were collected through review of Journal articles and relevant Text books. The Data were analysed using Severity Index, Ranking and Simple Percentages. It was discovered from the analysis that factors such as Contractors inexperience, inadequate planning, Inflation, incessant variation order, and change in project design were critical to causing cost overrun, while project complexity, shortening of project period and fraudulent practices are also responsible. The study concluded with recommending, adequate planning using conventional techniques, Studying and applying project history, material bulk purchase, proper project design and establishing proactive fraud prevention system on sites, as panacea for effective cost performance on sites.

KEY WORDS: Performance, Cost, Construction, Factors.

INTRODUCTION

Construction industry in Nigeria had been a major source of employment for 70% of labour force in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of   project works; it determines to a large extent   the overall success of project works. So also if the resources are adequately harnessed, issues that pertains to cost overrun would not arise which could result to variations and claims. Some firms rely on claim as a result of variation incurred during the course of the project execution and afterward evaluate their profit after incurring necessary and unnecessary cost on a project.                                                 This however has tendency of positioning such in a disadvantageous profit position. An effective cost management strategy is therefore necessary, this could be achieved  through putting in place a proactive cost management strategy. (Love et al, 2005; Ogunsemi and Jagboro, 2005; Ferry et al, 1998).

They described cost management system as a process that should be carried out throughout the life cycle of a project, from the inception to final completion and final payment to the contractor. In the light of this, the timeliness and cost effectiveness of various operation and decision carried out will determine to an extent the magnitude of cost that could be saved on the project. ( Kerzner, 2005; Ogunsemi and Jagboro, 2005).

However Dissanayaka and Kumaraswamy,(1999) opined that Time, Cost, Quality target as well  as project satisfaction tend to be most important key to measure the overall performance of a project work. Furthermore, various research works have also indicated that most project records cost or time overrun during their tenure of execution.( Odusami and Olusanya, 2000).  (Mbachu and Olaoye, 1989; Madewsley, et al, 2004); opined that 51percent of average delay were experienced yearly which culminates in cost overrun, certain factors are responsible for this, to this end however this study attempts at investigating such factors and proffer solution to the pandemic.  The scope of this research work shall be limited to building construction sites within the selected area in Nigeria, Ogun state, Lagos state and Northern part of Nigeria. This is attributable to unique project environment they possess. The aim and objectives of the research are as follows: The research work is to determine the various factors that interplay in impacting project cost performance, investigating the order of severity of the factors, and recommending ways of curtailing the effects. Field survey was carried out with 100 questionnaire distributed  and 67 were used for analysis of response from construction practitioners selected randomly from population of construction firms, The primary data were collected with the aid of structured questionnaire designed on Likert Scale of 1to 4 rating scale.  Mean item score, Simple percentages and severity index were used as analytical tool of the generated data. SPSS (Statistical Packages for Social Science Students) was used in determining pattern of relationship among the cost determinants and variables. The factors were ranked in order of their degree of severity. It was discovered from the findings that, these factors are the major ones that results in cost overrun on construction sites.

(i).Inadequate planning (ii) Contractors project inexperience (iii) Inflation (iv) Incessant  variation order (v) Change in project design (vi) Project complexity (vii) shortening of contract period and (viii) Fraudulent practices.

In order to prevent occurrence of cost overrun or a practice action towards prevention of such, the following are recommended.

(i)inadequate planning:  breaking of project planning into short term achievable goals, medium term planning and Long term planning ( ii)Studying of project history for possible application on another similar projects  (iii) Bulk purchase of material  (iv)Proper design of the project during design stage so as to avoid. Undue on-project variation (v) Establishing fraudulent detecting system or system of individual accountability to discourage pilfering, stealing and other related vices.

STUDY OF FACTORS AFFECTING CONSTRUCTION COST PERFORMANCE IN NIGERIAN CONSTRUCTION SITES
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Building
  • Project ID: BLD0007
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 2.7K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Building
Project ID BLD0007
Fee ₦5,000 ($14)
Chapters 5 Chapters
No of Pages 50 Pages
Format Microsoft Word

Related Works

CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
Chapter one Introduction 1.1. Background of the Study Construction industry has complexity in its nature because it contains a large number of parties such as clients, contractors, consultants, stakeholders, shareholders, regulators and others. Construction projects in the Gaza Strip suffer from many problems and complex issues in performance,... Continue Reading
CHAPTER ONE: 1.0 INTRODUCTION 1.1 Background of the study 1.2 Statement of the problem 1.3 Statement of the objectives 1.4 Research questions 1.5 Research hypotheses 1.6 Significance of the study 1.7 Scope of the study 1.8 Limitations of the study 1.9 Definition of terms CHAPTER TWO: 2.0 REVIEW OF RELATED LITERATURE 2.1 Concept of internal control... Continue Reading
CHAPTER ONE INTRODUCTION 1.1  Relevance of project 1.2  Site inspection 1.3  Evolution of road network in nigeria 1.4  Motor vehicle characteristic that affects road design data 1.5  Drivers and their characteristics 1.6  Reconnaissance survey 1.6.1Chain survey 1.6.2Station marking 1.7  Factors Affecting Choice Of Station CHAPTER TWO... Continue Reading
  ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
Call Us
whatsappWhatsApp Us