ABSTRACT

Trenchless construction is the use of construction methods to install and repair underground utility systems with minimum open cut excavation. This includes the use of pipe jacking, micro tunneling, horizontal direction drilling, and guided boring systems. This was adopted to replace the aging utility infrastructure and install new facilities, while minimizing disruptions to traffic communities and business, reducing environmental impact and lowering the high costs of pavement removal and site restoration. Critical areas of a trenchless application include crossing of conduits beneath highways, streets, railroads and other transportation arteries. Chapter one: Introduction which gives the general background of the study, statement of the problem, significance of the project, project objectives and scope of the project Chapter two: Literature review, which reviews documents, related to the study topic. Chapter three: Methodology which contains the primary and secondary data, quantitative and qualitative evaluations of trenchless method to the obtain best applicable Trenchless method to use for installation of the designed concrete duct and procedures how to install the duct. Chapter four: results, discussions and findings obtained in the test results and traffic count. Chapter five: challenges, the conclusions and recommendations.

DESIGN OF AN UNDERGROUND UTILITY DUCT USING TRENCHES METHOD (CASE STUDY: KIMERA ROAD) TRENCHLESS METHOD
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0168
  • Access Fee: ₦5,000 ($14)
  • Pages: 52 Pages
  • Format: Microsoft Word
  • Views: 727
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Civil Engineering
Project ID CVE0168
Fee ₦5,000 ($14)
No of Pages 52 Pages
Format Microsoft Word

Related Works

ABSTRACT Trenchless construction is the use of construction methods to install and repair underground utility systems with minimum open cut excavation. This includes the use of pipe jacking, micro tunneling, horizontal direction drilling, and guided boring systems. This was adopted to replace the aging utility infrastructure and install new... Continue Reading
ABSTRACT Hamu - Mukasa road, just like most other roads in Kampala city has a number of defects such as potholes, cracks, ravels aggregate polishing, and many more accompanied by lack of drainage which in turn facilitate the high traffic congestion and delays, especially at peak demand periods in addition to comfortability and unsafeness of the... Continue Reading
ABSTRACT The production of cassava flour by the method of traditional processing method (sun drying) and modern processing method (oven drying) was carried out using cassava sliced cubes or peeled cassava. Indeed, the traditional Nigeria techniques of... Continue Reading
ABSTRACT The production of cassava flour by the method of traditional processing method (sun drying) and modern processing method (oven drying) was carried out using cassava sliced cubes or peeled cassava. Indeed, the traditional Nigeria techniques of... Continue Reading
ABSTRACT The production of cassava flour by the method of traditional processing method (sun drying) and modern processing method (oven drying) was carried out using cassava sliced cubes or peeled cassava. Indeed, the traditional Nigeria techniques of cassava flour production was studied with a view of achieving same product mechanically. Result... Continue Reading
ABSTRACT Automatic water level controller for both overhead and underground tank is designed to monitor the level of water in a tank. It displays the level of water and when it is at the lowest level; a pump is activated automatically to refill the tank. When the tank is filled to its maximum capacity, the pump is automatically de-energized.... Continue Reading
ABSTRACT Automatic water level controller for both overhead and underground tank is designed to monitor the level of water in a tank. It displays the level of water and when it is at the lowest level; a pump is activated automatically to refill the tank. When the tank is filled to its maximum capacity, the pump is automatically de-energized.... Continue Reading
ABSTRACT Fiber optic communication systems have revolutionized the telecommunications industry, because it is used for faster transmitting of telephone signals, internet communication and cable television signal due to such lower attenuation and interference. The optical fibers are buried deep in the ground (1.2-1.5 meters) away from human... Continue Reading
CONSTRUCTION OF AUTOMATIC WATER LEVEL CONTROLLER FOR BOTH OVERHEAD AND UNDERGROUND TANKS ABSTRACT Automatic water level controller for both overhead and underground tank is designed to monitor the level of water in a tank. It displays the level of water and when it is at the lowest level; a pump is activated automatically to refill the tank. When... Continue Reading
ABSTRACT Fiber optic communication systems have revolutionized the telecommunications industry, because it is used for faster transmitting of telephone signals, internet communication and cable television signal due to such lower attenuation and interference. The optical fibers are buried deep in the ground (1.2-1.5 meters) away from human... Continue Reading
Call Us
whatsappWhatsApp Us