ABSTRACT


Fiber optic communication systems have revolutionized the telecommunications industry, because it is used for faster transmitting of telephone signals, internet communication and cable television signal due to such lower attenuation and interference. The optical fibers are buried deep in the ground (1.2-1.5 meters) away from human activities. However, these fibers are been cut on frequently, the minute a fiber is cut, there is a halt in the smooth transition of signal.

 To prevent this occurrence, we designed and constructed underground cable cut detection system. The underground monitoring system comprises of two parts, the Fm transmitter and distance to fault measurement system. FM transmitter was design to broadcasts radio signals of frequency 73.4 MHz with the aid of a trimmer accompanied by an antenna. An interrupt signal was generated when there is a cut on power cable joining the transmitter circuit and the power supply. To find the exact position where an intruder is working we employed the distance to fault measurement system. Resistors where fixed parallel across a copper wire at an interval of 1m at a distance of 10m and the total resistor value was measured with a fixed multimeter. A cut on the wire indicated a change in the resistor value on the multimeter reading and hence the distance was figured from the distance to fault document drafted. This project was designed to provide a quick respond system to the network operator of intruders attempting to destroy underground fiber cables during signal transmission.

TABLE OF CONTENT

 

DEDICATION ___________________________________________ I

ACKNOWLEDGEMENT___________________________________V

ABSTRACT ___________________________________________________________ vi

CHAPTER ONE ________________________________________________________ 1

INTRODUCTION _______________________________________________________ 1

1.1PROBLEM STATEMENT___________________ 4

1.2 AIMS/ OBJECTIVES ____________________________________________ 4

1.3 SCOPE AND LIMITATIONS4

CHAPTER TWO ________________________________________________________ 6

THEORY______________________________________________________________ 6

2.1 UNDERGROUND MONITORY SYSTEM_________________________6

2.1.1 FM TRANSMITTER______________________________________ 6

2.1.1.1 PRE-AMPLIFIER_______________________________________ 7

2.1.1.2 LC OSCILLATOR______________________________ 8

2.1.1.3 FMMODULATOR__________________________10

2.1.2 LAID CABLES SYSTEM_________________________________________________ 11

2.1.2.1 MONITORY CABLE SYSTEM______________________________12

2.1.2.2 RESISTORS MULTIMETER CABLE_________________________12

2.1.3 RECEIVING UNIT ________________________________________13

2.2 OUTPUT SIGNAL_____________________________________14

2.2.1 ELECTROMAGNETIC WAVE

2.2.2 RADIOWAVE

2.2.3 FREQUENCY MODULATION

CHAPTER THREE _____________________________________________________15

METHODOLOGY______________________________________________________15

3.1 INTRODUCTION__________________________________________15

3.2 PLANNING_________________________________________________ 15

3.2.1 DATA COLLECTION______________________________________________________ 15

3.3 IMPLEMENTING___________________________________ 17

3.3.1CONSTRUCTION________________________________________________________ 20

3.3.2 CHECKING_____________________________ 22

3.4 ANALYSIS________________________22

3.4.2 CIRCUIT DESCRIPTION _____________________________________________ 22

3.5 APPLICATIONS________________________________________________ 24 viii

3.5.1 FM TRANSMITTER________________________27

3.5.2 DISTANCE TO FAULT                                                       

CHAPTER FOUR ______________________________________________________ 30

RESULTS AND DISCUSSION ___________________________________________ 30

4.1 DISTANCE TO FAULT DOCUMENT _______________________30

4.1.1 RESISTANCES AND LENGTH READINGS _______ _______ 33

4.4 SYSTEM TEST RESULTS AND ERRORS________________________ 35

CHAPTER FIVE _______________________________________________________36

CONCLUSION AND RECOMMENDATION ________________________________36

5.1 CONCLUSION ___________________________________________ 36

5.2 RECOMMENDATIONS _____________________________________ 36

REFERENCES ________________________________________________________ 38

APPENDIX ___________________________________________________________ 40

APPENDIX A ______________________________________________ 40           

RESISTOR MULTIMETER CABLE SYSTEM _____________________40

APPENDIX B _______________________________________________45          

SPEED OF ELECTROMAGNETIC WAVE DERIVATION________________________45

APPENDIX C _______________________________________________49

WAVELENGTH- FREQUENCY RELATION FORMULAR DERIVATION_______ 49

APPENDIX D _______________________________________________49

HARDWARE REQUIREMENT _______ 50



HOW TO PREVENT UNDERGROUND FIBER CABLE CUT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mass Communication
  • Project ID: MAS1091
  • Access Fee: ₦5,000 ($14)
  • Pages: 47 Pages
  • Format: Microsoft Word
  • Views: 1.3K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Mass Communication
Project ID MAS1091
Fee ₦5,000 ($14)
No of Pages 47 Pages
Format Microsoft Word

Related Works

Abstract Western states like US, France, UK, etc are technological developed particularly in television and motion programmes  this made them dominate other developing nations which include Nigeria as a a result  Nigerians portray  Western cultures and values cultivated  through the media. On this thrust that the research examine the influence... Continue Reading
PRODUCT DEVELOPMENT IN THE CABLE INDUSTRY: PROBLEMS AND PROSPECT. (A CASE STUDY OF CUTIX CABLE PLC NNEWI ANAMBRA STATE ) CHAPTER ONE INTRODUCTION: The product or watchword for marketing has to be associated to “innovation or die. This innovational attributes can become a philosophy compelling or almost parallel to that of the marketing concept... Continue Reading
ABSTRACT In our present society, communication is more or less the “cannot – do – without” that people always say and the strength of every successful business generally. The impact of this can be felt in the life of individuals, homes and government establishment, without adequate communication network every activity is useless... Continue Reading
ABSTRACT In our present society, communication is more or less the “cannot – do – without” that people always say and the strength of every successful business generally. The impact of this can be felt in the life of individuals, homes and government establishment, without adequate communication network every activity is useless... Continue Reading
DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
ABSTRACT This project which comprise of many chapters that deals extensively with designs and construction of battery charger with auto-cut off which is capable of charging a 12 volts battery. In this construction research, designs was carried out which historic research was used to break down and evaluate to a low level understating of what an... Continue Reading
ABSTRACT In this study we investigated the determinants of dividend cut of selected non-financial companies in Nigeria. To carry out this study a more recent data for the period 2012 – 2014 was reviewed and a model with the necessary variables constructed. For seeking out the dividend cut relationship... Continue Reading
ABSTRACT Automatic water level controller for both overhead and underground tank is designed to monitor the level of water in a tank. It displays the level of water and when it is at the lowest level; a pump is activated automatically to refill the tank. When the tank is filled to its maximum capacity, the pump is automatically de-energized.... Continue Reading
ABSTRACT Automatic water level controller for both overhead and underground tank is designed to monitor the level of water in a tank. It displays the level of water and when it is at the lowest level; a pump is activated automatically to refill the tank. When the tank is filled to its maximum capacity, the pump is automatically de-energized.... Continue Reading
Call Us
whatsappWhatsApp Us