CONSTRUCTION OF A HYDROCYCLONE

  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0325
  • Access Fee: ₦5,000 ($14)
  • Pages: 36 Pages
  • Format: Microsoft Word
  • Views: 851
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
The hydrocyclone is a separating device used for the separation of dust particles from air, which has no moving component parts. This mechanism can also be defined as a system of winds circulating about a center of relatively low barometric pressure and on the earths surface, blowing inward in spiral form.
This project is constructed for the separation of liquid – liquid and solid – liquid mixture, like air and dust mixture, dust and liquid drop. This equipment is constructed to separate dust air mixture input of about 25m3/h.
The equipment was constructed with flat sheet metal plate of a desired standard. The dimensioned and for truncated parts were coupled and welded in other to fasten the parts together. The material used in this construction is mild sheet. This material was selected to avoid the effect of rust of material due to contact of the separating item or material with the walls of metal sheet.     
In considering the rating of this instrument, it is capable of sparing a gas-dust mixture of about 70% pure compared to the one used in commercial industries. That has the offering of product at around 90% pure. The total material cost of this equipment is ten thousand naira (N10,000).
The effect of hydrocyclone had been of much help especially in the pharmaceutical and photographic industries in the process of particle size separation. It is use to separate a mixture of particle size within the range of 4 and 95 m. The moving or relative speed for this model during separation is 4mls.
 
TABLE OF CONTENT
TITLE PAGE
LETTER OF TRANSMITTAL
APPROVAL PAGE
DEDICATION
ACKNOWLEDGEMENT
ABSTRACT
TABLE OF CONTENT 

CHAPTER ONE 
 INTRODUCTION 
OBJECTIVE OF THE PROJECT

CHAPTER TWO 
LITERATURE REVIEW 
HISTORICAL REVIEW OF PARTICLE SIZE SEPARATION
 THEORY OF PARTICLE SIZE SEPARATION 
MATERIAL BALANCE FOR SCREENING 
THEORY OF OPERATION
USES OF HYDROCYCLONE 
TYPES OF MECHANICAL SIZE SEPARATION EQUIPMENT  
FEATURES OF THE HYDROCYCLONE
COLLECTION EFFICIENCY OF A TYPICAL HYDROCYCLONE
COSTING ESTIMATION 
DISADVANTAGES OF HYDROCYCLONE
MATERIAL OF CONSTRUCTION 

CHAPTER THREE
CONSTRUCTION OF A HYDROCYCLONE

CHAPTER FOUR
DISCUSSION 
RECOMMENDATION 
CONCLUSION 
REFERENCES 
TABLE FOR NOMENCLATURE 
APPENDIX 

CONSTRUCTION OF A HYDROCYCLONE
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Chemical Engineering
  • Project ID: CNG0325
  • Access Fee: ₦5,000 ($14)
  • Pages: 36 Pages
  • Format: Microsoft Word
  • Views: 851
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Chemical Engineering
    Project ID CNG0325
    Fee ₦5,000 ($14)
    No of Pages 36 Pages
    Format Microsoft Word

    Related Works

    CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND OF THE STUDY The growing need for construction of all types coupled with a tight monetary supply has provided the construction industry with a big challenge to cut cost. Nigerian construction industry is faced... Continue Reading
    ABSTRACT  Maintaining steady cost projection on construction projects had been until recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial Cost plan, had been prevalent on Construction sites. However, little or no efforts has made to curtail the phenomenon, it is against this background that... Continue Reading
    Construction industry in Nigeria had been a major source of employment for 70% of labour in the country, thus it controls the capital flow, as well as labour resources, which has cost implications. Adequate management of these resources is considered an important aspect of project works; so also if the resources are adequately harnessed, issues... Continue Reading
    ABSTRACT  Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction... Continue Reading
    ABSTRACT Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses... Continue Reading
    ABSTRACT Construction Management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, and quality and participation satisfaction. Project management in construction encompasses... Continue Reading
    ABSTRACT The construction is one of the oldest industries in almost every nation. Its importance made it possible for undeveloped countries to rise up to becoming developed Countries. Lately, there have been an undesirable adherence to performance specification in most construction sites in most developing countries. This study seeks to reveal how... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT The aim of the study was to examine risk factors in accidents at construction sites at the Northern Region of Ghana. The research approach used for this study is quantitative approach. The study population consisted of site managers and project managers. Questionnaire and interview guide were used to gather primary data. Statistical... Continue Reading
    ABSTRACT  Studies have found labour standard practices among construction companies to be generally low in Ghana. This study therefore sought to assess labour standard practices among building construction companies in the Sunyani Municipality, identify constraints that affect same and also strategies for implementation. The study adopted... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us