THE IMPACT OF MANAGEMENT CHALLENGES ON THE PRODUCTIVITY OF INTERGRATED BUILDING TECHNOLOGY AND SERVICES LTD


For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
The research is an explanatory attempt to study and analyse “the impact of management challenges on the productivity” with special references to intergrated Building Technology and Services Limited. The objective of this project is to determine various ways through which these challenges can be faced and checked, recommend at the end of the study the best way to counter such  challenges. The method of data collection is through personal interview, questionnaires and observation methods. The findings of the study are people refuse to recognized such enterprises by not pratronizing their product in large market due to some reasons and similarly inadequate funding by the appropriate authority which hinder the activities of the organisation. The major conclusion is that government should realize that small and medium scale industries have made a lot of contribution to the Nigeria economy and reducing the rate of unemployment  and over dependence on government jobs. Based on the findings and conclusion the researcher recommends that the government should provide adequate financial assistance to the organisation to face challenges that may occur to their productivity.

TABLE OF CONTENT
Title page- - - - - - - - - - i
Declaration - - - - - - - - - ii
Approval pages - - - - - - - - iii
Dedication - - - - - - - - - iv
Acknowledgement- - - - - - - - v
Abstraction- - - - - - - - - vi
Table of content - - - - - - - - vii

CHAPTER ONE
Introduction - - - - - - - - 1
1.1 Background of the study - - - - - 1
1.2 Statement of the problem - - - - - 4
1.3 Objective of the study - - - - - - 5
1.4 Significance of the study - - - - - 5
1.5 Research question and hypothesis - - - - 7
1.6 Scope of the study - - - - - - 8
1.7 Limitation of the study - - - - - - 8
1.8 Definition of the terms - - - - - -  9

CHAPTER TWO
Literature Review
2.1 Introduction- - - - - - - -    10
2.2 Management and administration in a small and medium scale enterprises - - - -    12
2.3 Management profile in a small and medium scale enterprises   - - - - - - -   13
2.4 Problems of marketing management in a smalland medium scale enterprises - - - - -  19
2.5 Operations management in a small and medium scale enterprise - - - - - 27

CHAPTER THREE
3.1 Introduction - - - - - - - 32
3.2 Research design - - - - - - - 33
3.3 Area of study - - - - - - - 33
3.4 Population of study- - - - - - - 33
3.5 Sample size and sampling techniques- - - - 34
3.6 Instruments for data collection - - - - 34
3.7 Validation of instrument - - - - - 35
3.8 Reliability of instrument - - - - - 35
3.9 Method of data collection - - - - - 36
3.10 Method of data analysis - - - - - 36

CHAPTER FOUR
Data Presentation and Analysis
4.1 Introduction - - - - - - - 37
4.2 Characteristics of respondents - - - - 37
4.3 Data presentation and analysis - - - - 40
4.4 Test of hypothesis - - - - - - 46
4.5 Summary of discussion of findings - - - - 50

CHAPTER FIVE
Summary, Conclusions and Recommendations
5.1 Summary - - - - - - - - 52
5.2 Conclusion - - - - - - - - 54
5.3 Recommendations - - - - - - 55
Reference - - - - - - - - 57
Appendix - - - - - - - - 58

THE IMPACT OF MANAGEMENT CHALLENGES ON THE PRODUCTIVITY OF INTERGRATED BUILDING TECHNOLOGY AND SERVICES LTD
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Business Administration and Management
Project ID BAM2389
Fee ₦5,000 ($14)
No of Pages 69 Pages
Format Microsoft Word

Related Works

ABSTRACT           Identification of difficult teaching topics in integrated science and the causes of their difficulty were carried out in the research. Questionnaire was used to elicit the require information and the results obtained analysed using mean and percentages. Results of the analysis showed that while some topics were... Continue Reading
ABSTRACT The purpose of this study was to determine the impact of effective building production management in successful building project delivery in Akwa in Anambra State. A three research question were formulated which guided the study. The population of the study comprises of building production management professionals in construction firms. A... Continue Reading
ABSTRACT    The need for the Nigerian construction industry to move away from the traditional forms of project procurement and embrace project management services cannot be over emphasized.  This is as a result of the importance of capital projects to the development of a young nation.  This study investigated the impact of project management... Continue Reading
  ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
Topic : The environmental impacts of building constructions as expressed by the stakeholders in building and construction industry. Key words: Environmental Impact Assessment (EAI,Sustainable Development: Development, Regulation,Global Warning, Ecosystem, Green house Gas (GHG) ABSTRACT This study investigated the environmental impacts of building... Continue Reading
 Topic : The environmental impacts of building constructions as expressed by the stakeholders in building and construction industry. Key words: Environmental Impact Assessment (EAI,Sustainable Development: Development, Regulation,Global Warning, Ecosystem, Green house Gas (GHG)  ... Continue Reading
ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
CHAPTER ONE INTRODUCTION The subject of airport passenger terminal building must involve a discussion of transportation. Transportation has remained one of the most vital factors that influence the development of a nation. The credibility of... Continue Reading
Abstract This research project present the use of building survey for maintenance of buildings. It used analytic model and field studies on improper building maintenance to discuss the causes and remedial measures to be used. It was discovered that low level of awareness about building survey is the major problem of our building maintenance (i.e... Continue Reading
This study is on an Appraisal of application of building facility maintenance of public buildings in Federal poly Oko. Some of the objectives include; determining the nature and types of public building, to examine the current condition and state of maintenance of public buildings, to identify the underlying factors that militated to poor... Continue Reading
Call Us
whatsappWhatsApp Us