EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES

  • Type: Project
  • Department: Building
  • Project ID: BLD0016
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Methodology: Percentage
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.5K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CHAPTER ONE:
1.0 INTRODUCTION

1.1 Background of the study
1.2 Statement of the problem
1.3 Statement of the objectives
1.4 Research questions
1.5 Research hypotheses
1.6 Significance of the study
1.7 Scope of the study
1.8 Limitations of the study
1.9 Definition of terms

CHAPTER TWO:
2.0 REVIEW OF RELATED LITERATURE

2.1 Concept of internal control
2.2 Factors that characterize effective internal control
2.3 Classes of internal control
2.4 Limitations of internal control
2.5 Evaluations of internal control
2.6 Internal control and the auditor
2.7 Public accountability
2.8 Historical overview of the case study
2.9 Internal control and accountability

CHAPTER THREE:
3.0 RESEARCH METHODOLOGY

3.1 Research design
3.2 Sources of data
3.3 Area of study
3.4 Population of the study
3.5 Determination of sample size
3.6 Reliability of the instrument
3.7 Validity of the instrument
3.8 Method of data analysis

CHAPTER FOUR:
4.0 PRESENTATION OF DATA

4.1 Presentation of data
4.2 Test of hypotheses

CHAPTER FIVE:
5.0 SUMMARY OF FINDINGS, CONCLUSIONS AND RECOMMENDATIONS

5.1 Summary of findings
5.2 Conclusions
5.3 Recommendations
Bibliography

EXPERT SYSTEM APPROACH TO OVERCOMING EXCESSIVE COST ON BUILDING SITES
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Building
  • Project ID: BLD0016
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Methodology: Percentage
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Building
    Project ID BLD0016
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Methodology Percentage
    Reference YES
    Format Microsoft Word

    Related Works

    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT Many projects in Uganda and the world over have suffered from cost and time overruns due to factors stemming from poor cost control during the design and project implementation stages. Research aimed at studying the cost control techniques being used in Uganda was done on a selection of 130 contractors involved in the construction of... Continue Reading
    ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
      ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
    ABSTRACT The construction industry is inherently hazardous. Thus, there is a need to make the construction site a safe place to work although the poor safety record remains a concern. The determination of the aggregate costs of health and safety programmes is considered a leap for achieving construction safety in construction project delivery.... Continue Reading
    Abstract The utilization of solar energy is most concerned source in energy sector nowadays. The building  integrated photovoltaic solar panels are increasingly constructed in dense urban areas because they brought   many advantages to the society along with energy saving features. However, at the same time, they raise  tensions in capital... Continue Reading
    CHAPTER ONE 1.0     INTRODUCTION 1.1     BACKGROUND OF THE STUDY  The development of soil erosion began when man settled down and started turning pasture land into farmland. The intensive exploitation of the land disturbed the natural soil vegetative cover and exposed its, surface to the effect of erosive agents and to introduce such... Continue Reading
    ABSTRACT Generally, the success of completing any building construction project is based on key performance indices such as timely delivery of project, construction period, defects as well as client satisfaction. However, what effect does the implementation of safety management practices has on building construction project success? This research... Continue Reading
    TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Statement of the Problem 1.2 Purpose of the Study 1.3 Scope of the Study 1.4 Limitations of the Study 1.5 Significance of the Study CHAPTER TWO Literature Review 2.0 Concept of Cost Control 2.1 What is Cost... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us