ASSESSMENT OF TUE FACTORS MITIGATING THE EFFECTIVE PREPARATION OF COST ESTIMATE AT TILE DESIGN STAGE

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0039
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Methodology: Statistical Analysis
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.3K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

 

ABSTRACT

This research assesses the factors mitigating the effective preparation of cost estimates at the design stage Accurate cost estimates are crucial to the effrctive realization of construction projects. This research is aimed at examining the factors affecting accuracy of pre-lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contractors for better estimating. 84 questionnaires were sent out, 28 to con tractors, 28 to clients, and 28 were sent to the consultant firms respectively. 25 questionnaires were received from each of the respondent categories, representing 89% using the simple random sampling technique The collected data were analyzed using the Relative importance Index. The study found out that a statistically significant relationship existed between the clients, consultants, and contractor on the essential factors affecting accuracy of pre-tender cost estimate. It was concluded that: Experience and skill level of the consultants ranked f’ with overall Ru of 0.9, project teams experience on the construction type 0.87, clear and detail drawings and specification, completeness of cost information, accuracy and reliability of cost information are the most significant factors affecting accuracy of pre-tender cost estimate were other paramount factors. The most appropriate cost estimating method at the design stage according to the respondents ranking is subjective estimating with Ru of 0.78 and parametric estimating 0.46 and synthetic estimating 0.52. It was recommended that Clients should always engage the services of skilled quantity surveyors to undertake the consultancy services in cost estimating process.

CHAPTER ONE

INTRODUCTION

1.1 Background of the Study

Construction estimate is the amount envisages to finish a construction work. It is the probable amount that is computed to complete a construction work. It is the prediction of the amount of a project based on available data at the time of prediction.

Cost estimate was defined by business dictionary (2013) as an “approximation of the probable cost of a product, program, or project, computed on the basis of available information. So the more information is provided on a project, the more the estimate tends to accuracy. It is important in many ways. According to business dictionary (2013), “four common types of cost estimates are: Planning estimate is a rough approximation of cost within a reasonable range of values, prepared for information purposes only, budget estimate an approximation based on well-defined ground rules, firm estimate a figure based on cost data that is renewable enough for entering into a binding concrete, not-to- exceed/Not-less-than estimate the maximum or minimum amount required to accomplish a given task, based on firm cost estimate. There are more benefits in estimating the cost of a potential construction Job that is not estimating before commencement. Cost estimate, to a client, is necessary in cash flow management. To an investor, it is necessary to support evaluation of project feasibility and to assess the scope of work. To a consultant, construction cost estimate can serve as a basis for job performance measurement (Baccarini 2004), in contract or selection, as an exhibit in construction contract disagreement, and in post work evaluation of completed jobs (work audit), and to a contractor, it is the determinant ofjob procurement (in bidding for construction jobs).

1.2 Statement of the Problem

The demand for more construction of all type coupled with tight monetary supply has provided the construction industry with, a big challenge on how to estimate the cost of construction project.

The problem of late involvement of quantity surveyor, inadequate details in the contract document, poor communication between the design team, inaccurate drawing and specification, inadequate data, unavailability of current rates of construction resources, inflation and charming in technology, finally consequent loss of project has brought about loss of client confidence in consultants, added investment risk, inability to deliver value to clients and disinvestment in the construction industry. As a result of this, it is found necessary to create solution to such problems through this research as to improve on the quality of the factors that affect the preparation of the cost estimate at the design stage.

1.3 Aim and Objectives of the Study

1.3.1 Aim

The aim of this research is to assess the factors that mitigate the effective preparation of cost estimate at the design stage.

1.3.2 Objectives

The specific objective of this research are:

  1. To examine the  factors that mitigates the accuracy of pre-lender preparation or cost estimate at tne design stage.
  2. To determine the appropriate method of cost estimating at the design stage
  3. To access the factors that mitigates the effective preparation of cost estimate at the design stage.

1.4 Significance of the Study

The significance of this research is to promote good estimating to sustained profit as errors and carelessness can be costly in terms of loss of profit and project abandonment,

1.5 Scope

This research focused on the cost estimate at the design stage of public building project within Federal Capital Territory Abuja.

1.6 Limitation

In this process of this research project, there were various forms of setbacks which had a great effect on the process of this research project.

One of such set back is the inability to get the appropriate and reliable information and it book found from librarian visited, also the high cost of transportation to the various information centers visited and place where the questionnaire where given out, as well the reluctance shown by these whom the questionnaires were given to.

Despite all this, a reasonable amount of work was achieved based on the research topic.

ASSESSMENT OF TUE FACTORS MITIGATING THE EFFECTIVE PREPARATION OF COST ESTIMATE AT TILE DESIGN STAGE
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0039
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 65 Pages
  • Methodology: Statistical Analysis
  • Reference: YES
  • Format: Microsoft Word
  • Views: 2.3K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Quantity Surveying
Project ID QUS0039
Fee ₦5,000 ($14)
Chapters 5 Chapters
No of Pages 65 Pages
Methodology Statistical Analysis
Reference YES
Format Microsoft Word

Related Works

ABSTRACT Despite the IUD’s numerous advantages, rates of use remain low in many areas of the world and have even declined recently in some developing countries. Significant factors that adversely affect use of IUD have been described in various areas. This study aimed to establish the factors mitigating use of intrauterine devices among women... Continue Reading
Table of Contents Acknowledgments ABSTRACT Declaration Dedication . iv Approval Table of Contents vi CHAPTERONE 1 Introduction i CHAPTERTWO 8 LITERATURE REVIEW 8 2.2. Parents’ Level ofEducation, influence on Students’Academic Performance 8 2,3, Parents’ economic status and Students’Academic Performance 9 2.5. Students’Academic... Continue Reading
CHAPTER ONE INTRODUCTION 1.1       Background of the Study Ever since the dawn of civilization, man has indulged in some form of construction activity. Even in ancient times, man created architectural Marvels which came to be regarded as wonders of the world including the pyramids of Egypt, the Great Wall of China, and the tower of Babel... Continue Reading
ABSTRACT This study looks at the impact of the High Teacher Turnover Rate on Academic Performance in a Case Study of Selected Secondary Schools in the Iganga District. The study was aimed at identifying the challenges students face due to their time of study while residing on the schools’ premises, and how these challenges affect their academic... Continue Reading
ABSTRACT Bill of quantities and the engineer's estimates are the contents of the engineer's report on tenders for road construction projects. It also forms a proposal prepared for any road rehabilitation. This research work looks into the possibilities of providing a fast and efficient means of preparing bills of quantities and engineer's... Continue Reading
ABSTRACT The government of Uganda through the ministry of finance, and Uganda revenue authority, has made tremendous efforts to support the growth of small and medium enterprises by creating enabling environment through establishing appropriate legal and regulatory procedures, and continuous education and sensitization of the business owners about... Continue Reading
THE ABSTRACT This study is designed to provide knowledge for the important role auditor plays in a going concern as per combating fraud. The materials in the study have been systematically presented in (5) five chapter. CHAPTER ONE: This involves the introduction and... Continue Reading
TABLE OF CONTENT DECLARATION APPROVAL ii DEDICATION ACKNOWLEDGEMENT iv LIST OF ABRREVIATIONS v TABLE OF CONTENT S vi ABSTRACT x CHAPTER ONE 1 1.0 Introduction I 1.1 Baclcground to the Study 1 .21-listorical Background 1.2.1 Global Perspective on the Misuse of Public Funds 1 1 .2.2Continental/Africa Perspective on Misuse of Public Funds 3 1.2.3... Continue Reading
TABLE OF CONTENTS DECLARATION APPROVAL ii DEDICATION iii ACKNOWLEDGEMENT iv LIST OF TABLES viii EXECUTIVE SUMMARY/ABSTRACT ix CHAPTER ONE 1 INTRODUCTION 1 1.1 Background of The study 1 1.2 Statement of the problem 3 1.3 Objectives of the study 5 1 .4 Research questions 5 1.5 Hypothesis of the study 6 1.6 Significance of the study 6 1.7 Scope of... Continue Reading
Having been appointed by the Ministry of Education and posted to one of the primary schools in this area of study ten years ago, I have made several observations. The one which has posed a great concern is the over enrolment of pupils in the Standard Seven classes in the majority of the Primary Schools. As compared to the rest of the classes, the... Continue Reading
Call Us
whatsappWhatsApp Us