FACTORS AFFECTING ESTIMATING ACCURACY IN BUILDING CONSTRUCTION

  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0057
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 1.9K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

The importance of estimating process when dealing with construction projects cannot be over- emphasized. That is why, the greatest problem facing Quantity Surveying practice globally is that of achieving a correlation between conceptual estimate and the final project cost which is often used by some employers to determine the efficiency of the Quantity Surveyor. This study was geared towards showing how different factors affect estimating process, the techniques used for such estimates and how often are the feedbacks and reviews from historical data of previous project works are updated by construction firm. Both quantitative and qualitative data were collected and analyzed using Pearson Product of Moment statistical tool to test for research hypothesis, tables containing the elemental cost breakdown of each project works and bar charts to illustrate the graphical relationship between the percentage deviation of the budgeted cost and factors responsible for such deviations. From the analysis carried out, result shows that, accuracy in estimating processes are largely dependent on factors such as change in project scope, change in client’s test, change in market prices of materials, weather condition (heavy rainfall) and sourced information from historical data etc.

FACTORS AFFECTING ESTIMATING ACCURACY IN BUILDING CONSTRUCTION
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Quantity Surveying
  • Project ID: QUS0057
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 1.9K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Quantity Surveying
Project ID QUS0057
Fee ₦5,000 ($14)
No of Pages 73 Pages
Format Microsoft Word

Related Works

Abstract Pneumonia has been the leading cause of death among children under the age of five in subSaharan Africa, killing more children than the number of children dying from HIV/AIDS. The current methods of diagnosing pneumonia are limited by poor sensitivity and accuracy and they are also expensive. In this project, a low-cost biomedical device... Continue Reading
  ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
ABSTRACT This study determined the influence of estimating practice on cost performance of building projects. The objectives were to identify the estimating practices used by cost consultants, appraise the critical factors influencing estimating practice used, and to determine the influence of estimating practice on cost performance. The study... Continue Reading
ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
ABSTRACT Construction works estimate inaccuracies and none performance have made the imprecise cost estimating practice subjective. This study assessed the dimensions of cost estimating risks influencing building projects’ estimates. The objectives were to identify sources of cost estimating risks; determine critical risk influencing building... Continue Reading
ABSTRACT The building construction industry is very important to the socio-economic development of a nation. It portrays its religions and cultural values as well as the wealth of the nation. In spite of its importance, the construction industry has been regarded as being risky with frequent and high accident rate and Ill-health problems to... Continue Reading
ABSTRACT The study dealt with the Factors Impeding the Effective Learning of Mechanical Accuracy among Secondary Schools in Onitsha North of Anambra State. Four research questions guided the study.   The literature review was done in four sub-headings: Conceptual framework; theoretical framework; review of empirical studies and summary of... Continue Reading
ABSTRACT The study dealt with the Factors Impeding the Effective Learning of Mechanical Accuracy among Secondary Schools in Onitsha North of Anambra State. Four research questions guided the study.   The literature review was done in four sub-headings: Conceptual framework; theoretical framework; review of empirical studies and summary of... Continue Reading
ABSTRACT Cost estimating is a key activity in quantity surveying profession and in contractor's organisation. The research work is to investigate into current cost estimation practices of contractors in Akwa Ibom state. The objectives were to identify the techniques used in cost estimating by the... Continue Reading
DEPARTMENT: ESTATE MANAGEMENT AND VALUATION CHAPTER ONE 1.0     INTRODUCTION Landed property constitutes often major portions of company assets acceptable as collateral securities for corporate lending. According to Babawale et al (2013), real... Continue Reading
Call Us
whatsappWhatsApp Us