SUPPLIER EVALUATION AND ORGANIZATION COMPETITIVENESS: A CASE STUDY OF TORORO CEMENT

  • Type: Project
  • Department: Purchasing and Supply
  • Project ID: PAS0243
  • Access Fee: ₦5,000 ($14)
  • Pages: 54 Pages
  • Format: Microsoft Word
  • Views: 839
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

The purpose of the study was to assess the relationship between supplier evaluation and organizational competitiveness. The objectives were to determine the various supplier evaluations at Tororo cement, to examine the effectiveness of the evaluation and to assess the relationship between supplier evaluation and organisational competitiveness at Tororo cement. The study was conducted based on 60 respondents were the data was collected through closed-ended questionnaires. The researcher attained information from the respondents by virtue of self-administered questionnaires. The study adopted a case study design based on both quantitative approaches where the data analysis was done using an excel tool to determine the frequency and percentages The results reveal that supplier evaluation criteria were overall fairly conducted. The study concludes that Tororo cement needs to intensify the need for a developed focus on supplier evaluation criteria in the organisation. On the second objective, the degree of effectiveness of the findings reveals that the state of the effectiveness of the evaluation at Tororo cement provided for the determination of the means of the competitiveness, and the degree of effectiveness provided an adequate value for the resources necessary for the attainment of the status of Tororo cement. The study conclude that the state of the relationship was positive and generated cost-effectiveness in the means of design and efficiency for the management of the resources for the organisations in the design and provided avenues of the attainment of organisation effectiveness. ‘The researcher recommends that a thorough analysis and application of the supplier evaluation affected and done in order to improve the state of the bid evaluation in the organization. Proper technical and financial evaluations are needed to enhance the operation of the procurement process necessary for improved attainment of the financial value of the bids. Secondly, there is a need for improving the technical skills acquisition of the stakeholders in the l)1’ocuren~ent process. These stakeholder interests are usually quite diverse.. There is a need for proper adherence to the regulations by the evaluation committees in order to provide value for the procurement processes.

SUPPLIER EVALUATION AND ORGANIZATION COMPETITIVENESS: A CASE STUDY OF TORORO CEMENT
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Purchasing and Supply
  • Project ID: PAS0243
  • Access Fee: ₦5,000 ($14)
  • Pages: 54 Pages
  • Format: Microsoft Word
  • Views: 839
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Purchasing and Supply
Project ID PAS0243
Fee ₦5,000 ($14)
No of Pages 54 Pages
Format Microsoft Word

Related Works

ABSTRACT The purpose of the study was to assess the relationship between supplier evaluation and organizational competitiveness. The objectives were to determine the various supplier evaluations at Tororo cement, to examine the effectiveness of the evaluation and to assess the relationship between supplier evaluation and organisational... Continue Reading
The study was aimed at examining the relationship between the electronic procurement and organizational efficiency in private sector in Uganda in Tororo cement in Tororo as the case study. The study was based on the following main objectives which were to evaluate the E-procurement methods on organization efficiency in Tororo cement , to assess... Continue Reading
ABSTRACT The study was about Assessment of Health workers and Medical health Service Delivery in Tororo Main Hospital. The study had three objectives: To identify the contributions or roles of health workers in service delivery at Tororo Main Hospital Tororo district, To identify challenges faced by health workers while performing while performing... Continue Reading
ABSTRACT The research study aimed at examining the influence of Buyer-Supplier Relationship Management on Contract Performance in Hima Cement Factory. The objectives of the study were 10:- to establish the influence of information exchange on contract performance in Hima cement factory, to determine the influence of trust and commitment on... Continue Reading
TABLE OF CONTENTS DECLARATION APPROVAL I DEDICATION ii ACKNOWLEDGEMENT iv TABLE OF CONTENTS ~ v LIST OF TABLES xi LIST OF ABBREVIATIONS xii ABSTRACT ChAPTER ONE:~~. n o nu~n INTRODUCTION. nwuu~un. ,nnn~Nenu~n~nt, nøg~n~ nfl, 1.0 Introduction; 1 1.1 Background of study; 1 1.2 Statement of the Problem; 4 1.3 Purpose of the study; 4 1.4 Objectives... Continue Reading
TABLE OF CONTENTS CONTENT PAGE Declaration 1 Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Dedication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... Continue Reading
TABLE OF CONTENTS Title Page Declaration: ................................................................... I Approval: ....................................................................... 11 Dedication: ..................................................................... lll Acknowledgments:... Continue Reading
ABSTRACT HIV/ AIDS is an epidemic that is most prevalent in Uganda affecting people of different age groups, occupations and gender. It has a severe impact on the health status of the affected individuals. With the increase in the transmission of HIV, there is also an increase in the existence of TB as a co-infection. In this context, the aim of... Continue Reading
TABLE OF CONTENTS APPROVAL DECLARATION. ii DEDICATION iii ACKNOWLEDGMENT iv TABLE OF CONTENTS v ABSTRACT viii CHAPTER ONE: INTRODUCTION 1 1.0 Introduction 1 Background to the study 1 .1 . I Historical Perspective 1.1 .2 Theoretical perspective 3 1 .1 .3 Conceptual Perspective 4 1.1 .4 Contextual Perspective 5 1.2 Problem Statement 5 1.3 Purpose of... Continue Reading
COMPARING THE STRENGHT AS BLOCKS MADE FROM (1) CEMENT AND LATERITIC SOIL (2) CEMENT AND RED EARTH (3) LATERITE, SAND AND RED EARTH ABSTRACT This case study is “comparing the strength of blocks made from: cement stabilized laterite blocks, cement stabilized red earth blocks and sand, red earth and laterite blocks and mud blocks dried in the kiln.... Continue Reading
Call Us
whatsappWhatsApp Us