ABSTRACT

 

This research was carried out to assess and establish the criteria used by consultants in prequalifying and selecting Mechanical and Electrical subcontractors in building projects in Nigeria. Field survey involving construction consultants and staff in the client organizations in Lagos was conducted. Data were collected with the aid of structured questionnaires. 60 well-structured questionnaires were administered on the professional survey, 53 responses were gotten back which gave a response rate of 88% and 50 were used for analysis. Information gathered include the major prequalification and selection criteria used by consultants to assess Mechanical and Electrical subcontractors in building projects. The data collected was analyzed with basic descriptive statistics such as frequency, percentage and relative importance index (RII). The core findings from the results obtained revealed that Experience on similar projects, financial stability, quality of staff / key personnel, financial statements, past management performance, past project failure and Plant / Equipment Resources were considered as the main criteria used by consultants in prequalifying Mechanical and Electrical subcontractors in building projects. Subjective judgement was identified as the most prevalent model used by consultants in prequalifying Mechanical and Electrical subcontractors in building projects. Single stage selective tendering, Negotiated tendering, and Serial tendering were identified as the most frequent methods adopted by consultants in selecting Mechanical and Electrical subcontractors in building projects and Estimated cost of project / Tender price, Access to credit, Technical competence, Organization and Management capabilities, Experience of the team, Capacity of company, Litigation history of company, Available plant/equipment for project, Experience of company with similar project and Number of staff were identified the as key criteria considered by consultants in selecting Mechanical and Electrical subcontractors in building projects. The study recommends that, the actors in building construction projects should aspire to understand, adopt and implement the requirements of subcontractors prequalification and selection criteria of building works and also ensure to Procure subcontractors that have adequate experience on similar project, technical capacity, plant/equipment resources and the financial capacity to execute work effectively at an agreed cost, time and quality.

TABLE OF CONTENTS

                                                                                                     Page

 

Title Page                                                                                           i

Certification                                                                                                ii

Dedication                                                                                         iii

Acknowledgements                                                                            iv

Abstract                                                                                             v

Table of Contents                                                                             vi

 

CHAPTER ONE

1.0    INTRODUCTION                                                                     1

1.1     Background to the Study                                                        1

1.2     Statement of the Research Problems                                        7

1.3     Research Questions                                                                 8

1.4     Aim and Objectives of the Study                                              8

1.5     Significance of the Study                                                         9

1.6     Scope and Delimitation of the Study                                       9

1.7     Definition of Key Terms                                                           10

 

CHAPTER TWO

2.0    LITERATURE REVIEW                                                           12

2.1     Introduction                                                                             12

2.2     Concept of Prequalification and subcontracting                      12

2.3     Factors Influencing Consultants Choice in Projects                 19

2.3.1  The cost consideration framework                                          19

2.3.2  The TOPSIS and SAW-G Grey Techniques                               19

2.3.3  The Prequalification Method                                                    20

2.3.4 The Construction Management at Risk Method                       23

2.3.5 The Multi Criteria Evaluation Models                                       24

 

2.4.   Methods of Prequalification Selection of Subcontractors                         25

 

2.5.    Subcontractors and suppliers selection criteria in projects       42

 

2.5.1. Tendering Methods                                                                      44

2.5.2. Criteria for the award of contract                                            45

2.6.    Areas of Subcontracting in Building Construction Projects     48

 

2.7.    Summary                                                                                51

 

CHAPTER THREE

3.0 RESEARCH METHOD                                                                53

3.1     Introduction                                                                            53

3.2     Research Design                                                                      53

3.3    Study Population                                                                      53

3.4    Sampling Techniques                                                              54

3.5    Sample Size                                                                              54

3.6    Method of Data Collection                                                        54

3.7    Method of Data Analysis                                                          56

 

CHAPTER FOUR

4.0    DATA PRESENTATION, ANALYSIS AND FINDINGS              57

4.1        Introduction                                                                            57

4.2        Data Presentation                                                                    57

4.3        Presentation & Analysis of Research Questions                       64

4.4        Discussion of Findings                                                            71

 

 

 

 

 

CHAPTER FIVE

5.0 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS         74

5.1     Summary of Findings                                                              74

5.2     Conclusions                                                                             75

5.3        Recommendations                                                                   76

5.4        Area of Further Research                                                         77

References                                                                               78

Appendix                                                                                 83

CRITERIA USED BY CONSULTANTS IN PREQUALIFICATION AND SELECTION OF MECHANICAL & ELECTRICAL SUBCONTRACTORS IN BUILDING PROJECTS IN NIGERIA.
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Project Management
  • Project ID: PRM0004
  • Access Fee: ₦5,000 ($14)
  • Pages: 2 Pages
  • Format: Microsoft Word
  • Views: 1.6K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Project Management
Project ID PRM0004
Fee ₦5,000 ($14)
No of Pages 2 Pages
Format Microsoft Word

Related Works

ABSTRACT   This research was carried out to assess and establish the criteria used by consultants in prequalifying and selecting Mechanical and Electrical subcontractors in building projects in Nigeria. Field survey involving construction consultants and staff in the client organizations in Lagos was conducted. Data were collected with the aid of... Continue Reading
ABSTRACT   This research was carried out to assess and establish the criteria used by consultants in prequalifying and selecting Mechanical and Electrical subcontractors in building projects in Nigeria. Field survey involving construction consultants and staff in the client organizations in Lagos was conducted. Data were collected with the aid of... Continue Reading
ABSTRACT This project is designed to determine households' access to domestic water supply via mechanical and  non-mechanical energy system in Usin, Ikole local government area Ekiti State Nigeria, in terms of  quality and quantity as the importance of adequate safe water supply to human health cannot be over  emphasized. However, safe/improve... Continue Reading
ABSTRACT The management of people at work is an integral part of the management process. The aim of this research is to evaluate the motivational factors of employee consultants in the Nigerian construction industry, with a view to improve motivational practices which leads to growth and sustenance of the Nigerian construction industry. The... Continue Reading
Resistivity methods used in horizontal and vertical discontinuities in the electrical properties of the ground water detection (Geology ) Chapter One: Introduction The resistivity method is used in the study of the horizontal and vertical discontinuities in the electrical properties of the ground and also in the detection of three dimensional... Continue Reading
ABSTRACT    This study is designed to evaluate quality management in mechanical construction projects in the oil and gas industry. This evaluation was done by assessing quality assurance, quality control and planning. Three hypotheses were postulated to answer research questions. The study adopted an audit method as an appraisal strategy. To... Continue Reading
ABSTRACT Electrical power project like most of the construction projects are complex, dynamic, unique and prone to uncertainties, hence pose challenges even to the best of the project managers. The project team faces unprecedented changes in addition to constraints of budgets, time and quality. Review of literature reveals diverging opinions as to... Continue Reading
CHAPTER ONE INTRODUCTION 1.1      BACKGROUND OF THE STUDY Language is the distinctive quality unique to man. It is what enables man to express him/herself and communicate with his/her fellow man, and it is acquired naturally. According to Fromkin et al “…language is the source of human life and power” (3). They also state that “we use... Continue Reading
Engine oils are made from crude oil and its derivatives by mixing of certain other chemicals (additives) for improving their certain properties. Lubricating oil is used to lubricate moving parts of engine, reducing friction, protecting against wear, removing contaminants from the engine, act as a cleaning agent, and act as an anti corrosion and... Continue Reading
Engine oils are made from crude oil and its derivatives by mixing of certain other chemicals (additives) for improving their certain properties. Lubricating oil is used to lubricate moving parts of engine, reducing friction, protecting against wear, removing contaminants from the engine, act as a cleaning agent, and act as an anti corrosion and... Continue Reading
Call Us
whatsappWhatsApp Us