AN APPROACH TO WELL PLACEMENT AND PRODUCTION IN A GREEN FIELD

  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0014
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

Reservoir development planning and well placement significantly affect hydrocarbon recovery. Therefore, strategic well placement and development techniques are essential to minimize the risk of unproductive drilling and also to maximize production within the reservoir.

This study presents an approach to well placement and production in a green field. A 3D static model of the green field was built using geostatistical techniques to distribute the various model petrophysical properties such as porosity, thickness, and permeability in order to provide reliable reservoir description for dynamic modeling. A dynamic model was constructed to evaluate various reservoir development problems, including well placement, number and types of wells to be drilled in the green field. The drilling of both vertical and horizontal wells was considered in the analysis. Finding the optimal length of the horizontal well to be drilled in order to maximize oil recovery and to properly develop the reservoir was considered a significant problem to address. A sensitivity analysis was carried out to evaluate the impact of horizontal well length on oil recovery. The vertical to horizontal permeability anisotropy (kvkh) was also studied in this work.

The results of the analysis indicate that horizontal well length influences cumulative oil production. Drilling a 3000ft. long horizontal well was found to produce a higher cumulative volume of oil than the oil recovery obtained from similarly placed horizontal wells but with shorter lengths of 2000 ft. and 1500 ft.

It is concluded that the methodology proposed in this study will find application in the development of a green field.

Keywords: Reservoir development, well placement, simulation, petrophysical propertydistribution, geostatistics, permeability, porosity, thickness



CHAPTER 1

INTRODUCTION

1.1         Statement of Problem

Reservoir development and well placement have been one of the existing challenges in the petroleum industry over the years. This is because different engineering, geological and economic variables affecting reservoir performance are practically involved.

More importantly, the decision on how to increase oil recovery and maximize the economic profitability of field development projects is the pivot point. Therefore, an extensive evaluation of certain decision variables such as reservoir properties, production scheduling parameters, type of well, location to drill new wells and an effective technique to obtain the best economic strategies are required. Also, consideration should be given to the spatial distribution of geological and rock properties such as porosity and permeability in order to locate potential hydrocarbon zones for drilling activities. This involves critical evaluation of development strategies to produce the greatest amount of hydrocarbons within the physical and expected economic limits.

Several techniques have been adopted to achieve efficient reservoir development process which significantly affects the productivity and economic benefits of an oil reservoir. However, the aim of this work is to evaluate the impact of well placement on cumulative oil recovery during the development of a green field.

In this study, reservoir simulation and spatial based modeling approaches will be used as key evaluating elements for the development of the greenfield oil reservoir to improve its productivity.

1.2         Objectives

The objectives of this study are to:

·         Use geostatistical methods to distribute the petrophysical properties in building a 3D static model of the reservoir;

·         Find the optimum number, type, and placement of wells required to develop the greenfield.

1.3         Methodology

The methods to be used include;

·         Build a 3D static model of the green field by

o   Digitization of structural and isopach maps of the A-1 reservoir

o   Estimation  and  distribution  of  Porosity,  Permeability,  and  Thickness  at  all

locations in the reservoir

o   Estimation of Original Oil in Place (STOOIP)

·         Construction of a 3D dynamic reservoir model

·         Use of the 3D dynamic model to find the optimum number, type, and placement of wells to develop the reservoir.

1.4         Facilities and Resources

The facilities and resources used for this project include;

·         AUST library and internet facilities

·         Technical and academic expertise of supervisor

·         Structure and Isopach maps of A-1 reservoir

·         Isopermeability map of A-1 reservoir

·         Isoporosity map of A-1 reservoir

·         Computer software programs such as: GIS, SGeMS, Sensor Simulator

1.5         Organization of Report

This report is organized into five chapters. Chapter one is the introductory chapter giving general information about the entire project. Chapter two gives in-depth information of the study area and reviews relevant literature related to this work. Chapter three places emphasis on data.

AN APPROACH TO WELL PLACEMENT AND PRODUCTION IN A GREEN FIELD
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Petroleum Engineering
  • Project ID: PEE0014
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 50 Pages
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Petroleum Engineering
    Project ID PEE0014
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 50 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT  A study was carried out in 2012 in a Sudan savanna ecology in Ghana aimed at identifying the optimal planting dates and suitable cowpea varieties for green pod production. Six planting dates were considered starting from the onset of the rainy season (20th June, 30th June, 12th July, 25th July, 2nd August and 12th August), and four... Continue Reading
    Solar collectors mainly produced from poly-crystalline (P-Si) and micro-crystalline silicon (µ-Si) are in high demand in Nigeria due to persistent power challenges. The silicon are mostly imported and µ-Si is preferable due to its low cost. The µ-Si is extracted from Rice Husk (RH). However, the procedure of setting its optimal process... Continue Reading
    AWARENESS AND PRACTICE OF GREEN CONSTRUCTION   TITLE PAGE                                                                                    Certification Dedication Acknowledgement Table of Content List of Tables ABSTRACT CHAPTER ONE: INTRODUCTION 1.1       ... Continue Reading
    ABSTRACT Consumption of green tea ( Camellia sinensis ) may provide protection against chronic diseases, including cancer. Green tea polyphenols are believed to be responsible for this cancer preventive effect, and the antioxidant activity of the green tea polyphenols has been implicated as a potential mechanism. This hypothesis has been difficult... Continue Reading
    ABSTRACT Consumption of green tea ( Camellia sinensis ) may provide protection against chronic diseases, including cancer. Green tea polyphenols are believed to be responsible for this cancer preventive effect, and the antioxidant activity of the green tea polyphenols has been implicated as a potential mechanism. This hypothesis has been difficult... Continue Reading
    ABSTRACT The aim of this project is to design and construct an automated irrigation and monitoring system for a greenhouse. In this project, we design a system that uses data’s related to a greenhouse environment and yield status to control the designed system for the greenhouse. A greenhouse requires regular monitoring. The current system of... Continue Reading
    ABSTRACT Green building as innovation in Nigeria building industry is experiencing a technological growth similar in scale to that of the entire industrial revolution. This shows the level reached so far by construction industry to the effect of progress. Construction materials and processes are changing in response to divers environmental... Continue Reading
    ABSTRACT This study was undertaken under the topic green marketing practices with the aim of identifying the different types of green marketing practiced. The objective of the study was to identify factors that led shell oil company to adopt green marketing, to identify green marketing practices adopted by shell oil company and to find out... Continue Reading
    ABSTRACT The construction industry consumes about forty percent of the world’s energy. The high increasing rate of construction activities has led to exploitation of most of the natural resources. These activities have led to massive deforestation and clearing of green cover for settlement and infrastructure development in Kampala. The... Continue Reading
    TABLE OF CONTENTS DECLARATION APPROVAL ii DEDICATION iii ACKNOWLEDGEMENT iv TABLE OF CONTENTS v LIST OF TABLES viii ABSTRACT ix CHAPTER ONE 1 INTRODUCTION 1 1.0 Introduction 1 1.1 Background of the study 1 1.2 Statement of the problem 2 1.3 General objective 3 1.4 Specific Objectives 3 1.5 Research questions 3 1.6. Scope of the study 4 1.6.1... Continue Reading
    Call Us
    whatsappWhatsApp Us