ABSTRACT

Stop clocks are devices for indicating time duration for the occurrence of two events after a passage of time. They are usually powered by batteries and they measure time in unit of seconds. Most clocks stop working as a result of the inability of the main spring to make a complete revolution. Also problems that do arise in clocks and cause it to breakdown include worn gear teeth, pendulum friction, and sympathetic vibrations among others.
To effectively carry out repairs on stop clocks or other clocks, simple maintenance should be carried out. This includes clearing and oiling the parts of the clock mechanism. In the repair of the stop clocks the clearing and oiling procedure was carried out whereas in the others, simple forgoing of metal drips was done and fitted into the clock to ensure they start working.
The total cost of the material for repair of the stop clock is N2, 000 while the labour cost is N5, 000 to bring the cost of the project to a total N7, 000 certain guideline and recommendation were made to ensure a lasting usage of the stop clocks. References were made from various textbooks and information was sourced from the Internet to help in the repair of the clocks and researches in this project report. 


TABLE OF CONTENT

Title page 
Letter of transmittal 
Approval page 
Prefaced 
Signature page 
Dedication 
Acknowledgement 
Abstract 

CHAPTER ONE 
Introduction 

CHAPTER TWO 
Literature review 

CHAPTER THREE
Repair procedure 
CHAPTER FOUR 
Cost Evaluation 

CHAPTER FIVE 
5.1Discussion 
5.2Conclusion 
5.3Recommendation 
References 

REPAIR OF STOP CLOCKS
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0324
  • Access Fee: ₦5,000 ($14)
  • Pages: 27 Pages
  • Format: Microsoft Word
  • Views: 910
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Mechanical Engineering
Project ID MCE0324
Fee ₦5,000 ($14)
No of Pages 27 Pages
Format Microsoft Word

Related Works

ABSTRACT The purpose of the project is to study the effect of liquid flow rate and gas flow rate on the pressure drop in a packed absorption tower and also to repair and restore the packed absorption tower to good working condition. Trouble shooting... Continue Reading
PREFACE A new machine/equipment will provide satisfactory service if kept in proper operating condition. The inevitability of less than 100% reliability of any machine/equipment after some period and maintenance. Also in system of any complexity, certain replacement adjustments are... Continue Reading
ABSTRACT Mechanical Engineering Department of the Institute of Management and Technology has many non – functional machines. This is caused as a result of poor maintenance culture, which in turn resulted to breakdown of the Deep Freezer under review.... Continue Reading
ABSTRACT The need for an authentic and reliable report relating to the repairs and rehabilitation of a faulty air-conditioner is inevitable. Many homes and offices uses the air-conditioner to cool he temperature in their respective homes. So the maintenance of the air-conditioner should be a top... Continue Reading
REPAIR OF DEEP FREEZER ABSTRACT This work gives an account of all activities carried out to restore a faulty and abandoned deep freezer to normal functioning. This report therefore contains the different stages embarked in the execution of the project. These include the literature back ground, checking’s conducted, cleaning, repair operations... Continue Reading
ABSTRACT Most often, the printing of very important reports have been stopped midway owing to some minor faults on the computer/printer system.  At times, due to the complexity of the faults some maintenance personnel find it difficult beginning to perform detailed diagnosis due to lack of specialized equipment, some of which are available only... Continue Reading
ABSTRACT The need for an authentic and reliable report relating to the repairs and rehabilitation of a faulty air conditioner is inevitable.  The fact that many people use the air conditioner to cool the temperature in their respective home and offices make its maintenance a top priority to every individual in order to avoid huge expenditure in... Continue Reading
ABSTRACT In the mechanical engineering department of institute of management and technology there are many machines but it is not all that is functioning well. This may airless as a   result of lack of maintenance which is a prove in the breakdown of the air conditioner. The quality and effectiveness of materials were mated very well as referred... Continue Reading
ABSTRACT The need for an authentic and reliable report relating to the repairs and rehabilitation of a faulty air conditioner is inevitable.  The fact that many people use the air conditioner to cool the temperature in their respective home and offices make its maintenance a top priority to every individual in order to avoid huge expenditure in... Continue Reading
ABSTRACT The aim of this project was to restore and renovate one phase, one horse power centrifugal pump to its normal operating condition for future practical purposes. The work started with fault finding/trouble shooting, a method of closing the discharge stop valve, and first priming the pump before running it was adopted. However, after... Continue Reading