DESIGN AND CONSTRUCTION OF A MODEL POWER GENERATING WINDMILL

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0230
  • Access Fee: ₦5,000 ($14)
  • Pages: 67 Pages
  • Format: Microsoft Word
  • Views: 1.6K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

This project covers the design and construction of a power generating windmill. The designs was carried out based on long-term available wind data of bida at 10m above the ground level. The average wind speed for Bida is 5.24m/s and rated turbine wind speed is 6.29m/s. The design of each components of the system were carefully constructed in a well equipped workshop within the school premises. Calculations were done manually for each components of the system and the results was match with the design. The system was coupled and installed at an open space of the school at a height of 10m. The system was testing run and the results was recorded for a period of time. 

DESIGN AND CONSTRUCTION OF A MODEL POWER GENERATING WINDMILL
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0230
  • Access Fee: ₦5,000 ($14)
  • Pages: 67 Pages
  • Format: Microsoft Word
  • Views: 1.6K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Mechanical Engineering
Project ID MCE0230
Fee ₦5,000 ($14)
No of Pages 67 Pages
Format Microsoft Word

Related Works

TABLE OF CONTENTS Declaration....................................................................................................................................... i Approval .......................................................................................................................................... i... Continue Reading
Abstract Industrial accidents are on the rise. This fact is even more prevalent in developing countries where the countries lack the safety standards required to ensure workplace safety in the pursuit of economic development. As land in prime locations becomes increasingly scarce, there is an argument for building skyscrapers. But this just... Continue Reading
PREFACE This write up tries to review what the theme power Tussle means, this happens mostly every day somewhere, someplace in the word. It can be tussling in who will be in control and this sometime ends up in bloody conflict. This project discussed on balance of power tussle which I represented with two aggressive postures tussling in order to... Continue Reading
Abstrac t In this work, a 2.8kva alternator was coupled to a 4 H.P dc motor acting as a prime mover to produce a fuel-less generator. The coupling was done using two crankshaft pulleys to match the speed of the alternator to that of the dc motor. Two 24v dc... Continue Reading
Abstract Electronic devices comprising of non-linear components (diodes, transistors, transformers, etc.) produce some number of harmonics in our power systems creating various voltage distortions [7]. As a result, several technical problems may arise for the device such as overheating and damage to sensitive equipment which would most likely lead... Continue Reading
(A CASE STUDY A UNION BANK OF NIGERIA) ABSTRACT This project is aimed at designing and implementing a computerized transaction receipt generating system for an ATM for Union Bank of Nigeria Plc, Enugu. Specifically the study covered the activities... Continue Reading
ABSTRACT This project work is a computerization it cash receipt system of an organization. Different source of receipt whose scope and limitation are based on a sales and purchased receipts/ invoices inquiry on total balance and generation of report. But before... Continue Reading
DESIGN AND IMPLEMENTATION OF STUDENT’S TRANSCRIPT GENERATING SOFTWARE ABSTRACT This study was carried out to verify al the manual processes involved in generating student’s transcript and to seek for a way of automating the system for a way of automating the system for effective operations. Since there is continues moves towards technological... Continue Reading
ABSTRACT This paper presents a graph-coloring-based algorithm for the exam scheduling application, with the objective of achieving fairness, accuracy, and optimal exam time period. Through the work, we consider few assumptions and constraints, closely related to the general exam scheduling problem, and mainly driven from accumulated experience at... Continue Reading
ABSTRACT The system solves the problem of missing result of students in tertiary institutions and the system proffers a fast and accurate system for processing real time results and transcripts for students. The system was built with MYSQ programming languages.                CHAPTER ONE  GENERAL INTRODUCTION 1.0   INTRODUCTION A... Continue Reading
Call Us
whatsappWhatsApp Us