CONSTRUCTION OF A MOBILE REFRIGERATOR

  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0145
  • Access Fee: ₦5,000 ($14)
  • Pages: 43 Pages
  • Format: Microsoft Word
  • Views: 1.6K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT 

This write up is a detain of the process and formulation of plan for the physical realization of the construction of a mobile cooking system. It as divided into chapters, which discussed extensively the practical refrigerator cycle with attention given to constriction factors, working principle and choice of materials. The method used in the fabrication, assembly and arriving as knowing the safety requirement were not left out.
It is strongly believed by the authors that his will make an interesting study for inquisitive minds and collection of fact for future related project. 

TABLE OF CONTENTS
Title page
Letter of transmittal
Release page
Signature page
Approval page
Dedication
Acknowledgement
Abstract
Table of contents

CHAPTER ONE 
1.0 Introduction

CHAPTER TWO 
2.0  Literature Review

CHAPTER THREE
3.0 Theory of Construction and Analysis
3.1 Component Pasts of the Refrigerator
3.2 Theory of Reversed Heal Engineering System Operating on A Cannot Cycle
3.3 Refrigerant
3.4 The Construction Standards and Component Determination

CHAPTER FOUR 
4.0 Construction Procedures
4.1 Material Selection
4.2 Tools /Equipment Used
4.3 Construction Method and Procedure (Sequence of Operation
4.4 Laying of Evaporator Ripe (Piping
4.5 Lagging
4.6 Electrical System in the Fridge
4.7 Principles of Operation

CHAPTER FIVE
5.0 Testing and Evolution

CHAPTER SIX
Cost Analysis
6.0 Material Cost
6.2 Labour Cost Recommendation
References

CONSTRUCTION OF A MOBILE REFRIGERATOR
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Mechanical Engineering
  • Project ID: MCE0145
  • Access Fee: ₦5,000 ($14)
  • Pages: 43 Pages
  • Format: Microsoft Word
  • Views: 1.6K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Mechanical Engineering
Project ID MCE0145
Fee ₦5,000 ($14)
No of Pages 43 Pages
Format Microsoft Word

Related Works

ABSTRACT This write up focuses attention on a detailed report and account on the process of construction and formulation of plan for the actual and physical realization of the construction of the project work captioned fabrication and construction of a mobile cooling system. The report is therefore divided into chapters and each chapter discussed... Continue Reading
ABSTRACT This write up focuses attention on a detailed report and account on the process of construction and formulation of plan for the actual and physical realization of the construction of the project work captioned fabrication and construction of a mobile cooling system.  The report is therefore divided into chapters and each chapter... Continue Reading
ABSTRACT This write up is a detail of the process and formulation of plan for the physical realization of the construction of a refrigerator. It is divided into chapter, which discussed extensively the practical refrigeration cycle with full attention given to design factors, working principle and choice of material. The method used in... Continue Reading
ABSTRACT This write up is a detail of the process and formulation of plan for the physical realization of the construction of a refrigerator. It is divided into chapter, which discussed extensively the practical refrigeration cycle with full attention given to design factors, working principle and choice of material. The method used in... Continue Reading
ABSTRACT The technology regarding controlling devices and circuits is developing at a faster pace day-by-day. This project has applications similar to the controlling devices. So, in the model, Arduino circuit is the main component which could serve in the functioning of the program designed. Up to date, at many places, the refrigerator management... Continue Reading
ABSTRACT FLUSHING OF THE CONDENSER The refrigerant gas let into the condenser through the compressor and the vacuum pump was connected to the condenser to absorb dirty. REFILLING OF GAS INTO THE COMPRESSOR Gas was refilled into the compressor due to shortage of gas and it was filled inside the charging value and refrigerant. CHANGING OF DRIVER... Continue Reading
ABSTRACT This report covers all activities candied out to rehabilitate a faulty refrigerator. First and foremost, we diagnosed the faulty refrigerator using the basic instruments to know the faults. After which we bought the necessary standard items that caused the fault.  We then started work on it by replacing necessary instruments.  We... Continue Reading
INTRODUCTION REFRIGERATION Refrigeration is a branch of science that deals with the process of removing heat from a substance or space in order to make it cooler. Refrigerator is defined as a device that is used in cooling the internal temperature below the room temperature (that is between 250C to 300C). Generally, however, for a space or... Continue Reading
INTRODUCTION REFRIGERATION Refrigeration is a branch of science that deals with the process of removing heat from a substance or space in order to make it cooler. Refrigerator is defined as a device that is used in cooling the internal temperature below the room temperature (that is between 250C to 300C). Generally, however, for a space or... Continue Reading
ABSTRACT FLUSHING OF THE CONDENSER The refrigerant gas let into the condenser through the compressor and the vacuum pump was connected to the condenser to absorb dirty. REFILLING OF GAS INTO THE COMPRESSOR Gas was refilled into the compressor due to shortage of gas and it was filled inside the charging value and refrigerant. CHANGING OF DRIVER... Continue Reading
Call Us
whatsappWhatsApp Us