CONSTRUCTION OF ORSAT GAS ANALYZER

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0467
  • Access Fee: ₦5,000 ($14)
  • Pages: 98 Pages
  • Format: Microsoft Word
  • Views: 541
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
The Orsat Gas Analyzer was constructed at the project development institute (PRODA), Enugu. 
The operation involved the laboratory glass blowing which entails the heating of a glass tube. The heating •continues until the glass tube reaches its plastic state. The shape of the tube is changed or the required shape blown by pulling, bending by hand, cutting with a knife and also blown with mouth or denting the shape by the application of a suitable tool. 
The selection of the materials used in the construction was in such a way to suit the purpose. The material used for construction is borosilicate glass. 
The construction of the Orsat Gas Analyser was done to enable the understanding of gas analysis. Also, to understand the properties, characteristics and behaviour of different gases at different conditions. 
The cost of fabrication of this project is …………………………

TABLE OF CONTENTS
Title Pageii
Transmittal Letter iii
Approval Pageiv
Dedication v
Acknowledgement vi
Abstractvii
Table of Contents ix

CHAPTER ONE 
1.0Introduction 1
1.1Objectives of Orsat Gas Apparatus5



CHAPTER TWO
LITERATURE REVIEW 6
2.0Gas (Kinetic Theory)6
2.1Analysis7
2.1.1Analyzer7
2.1.2Gas Analysis  8
2.2The Method of Gas Analysis 9
2.2.1Instrumental Method10
2.2.2 Absorptiometric Method11
2.3Gas Analyzer s13
2.3.1 Exhaust Gas Analyzers13
2.3.2The Toxic Gas Detector Tube 14
2.3.3The Fyrite (C02 Analyzers) 15
2.4The Orsat Gas Analyzers15
2.4.1The Orsat Gas Analyzer with Jacket16
2.4.2The Orsat Gas Analyzer without Jacket17
2.5.0The components parts Of The Orsat Analyzer 
2.5.1The sampling Train 20
2.5.2The lntegrated Sample Method 21
2.6The Glass Wool22
2.6.1The Glass Probe 23
2.6.2The Squeeze Bulb (Pump)24
2.6.3The Manifold25
2.6.4The Glass Valves26
2.70The Absorption pipettes 26
2.7.1The Reservoir28
2.7.2The Expansion Bag29
2.7.3The Smaller Glass Tubes . 29
2.8Measuring Burettes With Water Jacket30
2.9.The Levelling Bottle32
2.9.1The Rubber Tubes33
2.9.2The Rubber Stopper34
2.9.3The Wooden Covering35

CHAPTER THREE
3.0Material Of Selection 38
Types Of Glasses/Properties 
3.1The Soda Glass  39
3.2Sodaline Glass  40

CHAPTER FOUR
4.0Fabrications Generally and Fabrication Procedure 
For Orsat Gas Analyzer
4.1Fabrication . 48
4.2Methods49
4.2.1Glass Forming49
4.2.2Press Moulding49
4.2.3Blowing50
4.2.4Press and Blow50
4.2.5Blow and Mould Process 52
4.2.6Laboratory Glass Blowing53
4.3The Simple Bunsen Burner53
4.4The Flame 54
4.5Glass Cutting 56
4.6Pulling a Point 57
4.7.1Sealing Glass Tubes 58
4.8U - Bend 59
4.8.1T-Joint 60
4.8.2Y-Joint 61
4.9Fabrication Procedure For Orsat Gas Analyzer 63
4.9.1Fabrication Of Levelling Bottle 64
4.9.2Fabrication Of Absorption Pipette 65
4.9.3Fabrication Of Burette66
4.9.4Fabrication Of Water Jacket 67
4.9.5Fabrication Of Manifold 68



CHAPTER FIVE
5.0Cost Of Replacement  69
5.1Over Head Cost 71
5.2Installation Cost72
5.3Maintenance Cost72
5.4Cost of Replacement73
5.5Over Head Cost 73
5.6Labour Cost73
5.7Material Cost74
5.8Draughtsmen Charge 77
5.9Overall Costs77

CHAPTER SIX 
6.0Discussion 79
6.1Conclusion81
6.2Recommendations82
References 
Appendix 

CONSTRUCTION OF ORSAT GAS ANALYZER
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0467
  • Access Fee: ₦5,000 ($14)
  • Pages: 98 Pages
  • Format: Microsoft Word
  • Views: 541
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Electrical Engineering
Project ID ELE0467
Fee ₦5,000 ($14)
No of Pages 98 Pages
Format Microsoft Word

Related Works

ABSTRACT           This project is organized in five chapters. Chapter one explains the introduction of the proposed project. It described the problem statement of the project, aim and objectives and expected contribution to knowledge.           Chapter two presents a vivid literature review of the concept of network analyzer... Continue Reading
EVALUATION OF NIGERIAN GAS PRODUCTION & ELECTRICITY GENERATION FROM NATURAL GAS USING REGRESSION ANAYLSIS(1999-2014) CHAPTER ONE INTRODUCTION 1.1. Background of the study Nigeria is a nation that has been blessed with mineral resources ranging from solid minerals to crude oil deposits; right from the northern part of Nigeria to the southern... Continue Reading
ABSTRACT This project which is on the design and fabrication of a two face gas burner is a brief exploration on the various ways and means of designing, construction, operating the two face gas burner, putting cost into consideration for economic advantage. Herein are brief information and literature on gas... Continue Reading
CONSTRUCTION OF A STANDARD BANKING OVEN (MINI-OVEN) WITH DUAL POWER SOURCE (ELECTRIC/GAS) ABSTRACT This project is designed to make the students utilize as many theoretical and practical concept as have been instructed in alstron to mechanical engineering workshop technology. Students are expected to learn and apply concepts, principles about... Continue Reading
ABSTRACT: The designed air driven engine is an economic friendly engine which operates with the aid of a compressed air. in principle, an air driven engine uses the expansion of compressed air to drive the pistons of an engine. an bio gas driven engine is a pneumatic actuator that creates useful work by expanding compressed gas. there is no mixing... Continue Reading
ABSTRACT: The designed air driven engine is an economic friendly engine which operates with the aid of a compressed air. in principle, an air driven engine uses the expansion of compressed air to drive the pistons of an engine. an bio gas driven engine is a pneumatic actuator that creates useful work by expanding compressed gas. there is no mixing... Continue Reading
ABSTRACT    This study is designed to evaluate quality management in mechanical construction projects in the oil and gas industry. This evaluation was done by assessing quality assurance, quality control and planning. Three hypotheses were postulated to answer research questions. The study adopted an audit method as an appraisal strategy. To... Continue Reading
ABSTRACT The purpose of the project is to study the effect of liquid flow rate and gas flow rate on the pressure drop in a packed absorption tower and also to repair and restore the packed absorption tower to good working condition. Trouble shooting... Continue Reading
TABLE OF CONTENTS CHAPTER ONE 1.0 Introduction 1.1 Background of Study 1.2 Statement of Problem 1.3 Purpose of the Study 1.4 Scope of the Study 1.5 Research Question 1.6 Research Hypothesis 1.7 Significance of the Study 1.8... Continue Reading
Call Us
whatsappWhatsApp Us