CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0405
  • Access Fee: ₦5,000 ($14)
  • Pages: 31 Pages
  • Format: Microsoft Word
  • Views: 175
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
As the zeal for change over on public power supply and stand- by generator increases; Engineers have researched deeply into the different ways and methods of achieving power changeover both manual and automatic types.
It may no be considered as serious issue in some places where supply is up to 90% constant or where intermittent outage cause no great damage. However, places like the business confers, industrials and cold rooms need almost 100% power supply, and also hospitals and usefully clinics need constant power supply. 

TABLE OF CONTENT 
Title Page 
Certification
Dedication 
Acknowledgement
Table of Content

CHAPTER ONE  
1.0 Introduction 
1.1 Background
1.2 Aims / Objectives
1.3 Scope of Limitation 
1.4 Definition of Terms

CHAPTER TWO    
2.0 Literature Review
2.1 The Power Transformer
2.2 The Relay
2.3 Switches 
2.4 Capacitors 
2.5 Diode 
2.6 Indicator Lights (Light Limiting Diode)
2.7 Power Supply 
2.8 Resistor 

CHAPTER THREE    
3.0 Circuit Diagram
3.1 Block Diagram 
3.3 Contactor Wiring Diagram 
3.4 Diagram of the Casing 

CHAPTER FOUR 
4.0 Testing and Evaluation 
4.1 Testing 
4.2 Evaluation
4.3 Trouble Shooting and Remedy 
4.4 Maintainability

CHAPTER FIVE  
5.0 Conclusion 
5.1 Reference 

CONSTRUCTION OF AUTOMATIC CHANGE OVER SWITCH
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0405
  • Access Fee: ₦5,000 ($14)
  • Pages: 31 Pages
  • Format: Microsoft Word
  • Views: 175
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Electrical Engineering
    Project ID ELE0405
    Fee ₦5,000 ($14)
    No of Pages 31 Pages
    Format Microsoft Word

    Related Works

    ABSTRACT This project work deals on the design and construction of an automatic power changeover that will change/transfer control from MAINS to Gen set and can switch ON/OFF the Gen automatically. The system integrates phase selector in MAINS and changeover to Gen. It is designed in several blocks all combined to from one functional unit. A +5v... Continue Reading
    DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH WITH GENERATOR CUT OFF AND STARTER ABSTRACT Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The design and construction of a 60A, 3-Ф automatic power changeover from public utility supply to generator and vice versa was aimed at providing a useful system for use in our homes or offices. The system was achieved with a 66A 3-Ф contactor, 100mA transformers and relays. The system turns on a generator when the public utility... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    This work is based on automatic changeover switch. If there is failure in main power supply it will automatically change to auxiliary power supply such as generator. This project is based on electromechanical changeover with the use of magnetic contractors, relay,and circuit breaker. ... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    This work is based on automatic changeover switch. If there is failure in main power supply it will automatically change to auxiliary power supply such as generator. This project is based on electromechanical changeover with the use of magnetic contractors, relay,and circuit breaker.... Continue Reading
    ABSTRACT The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage. Power instability or outage in... Continue Reading
    mso-fareast-font-family:'Times New Roman''>ABSTRACT 'Times New Roman''> mso-fareast-font-family:'Times New Roman''>The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us