INTEGRATION OF DISTRIBUTED GENERATION (DG) OF ELECTRIC POWER SUPPLY

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0380
  • Access Fee: ₦5,000 ($14)
  • Pages: 108 Pages
  • Format: Microsoft Word
  • Views: 1K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Adding to the requirement and need for power supply for day to day activities, it is therefore a necessity to design the power system to maintain minimal technical losses in the network, because most of our system component lack sufficient reactive power ability, this mean that the penetration of distributed generation (DG) will give way to reduce the transmission and distribution system resources thereby increase the reliability and probably better the power quality at all time. Hence the objective of this work will investigate the need for improving the power system of distribution system via Distribution Generation (DG) on the view to:


Identify the existing state of the system buses in the network

To confirm how Distribution Generation installation affect the voltage stability or profile of the network.

To investigate the optimal placement of Distributed Generation on the network.


INTEGRATION OF DISTRIBUTED GENERATION (DG) OF ELECTRIC POWER SUPPLY
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0380
  • Access Fee: ₦5,000 ($14)
  • Pages: 108 Pages
  • Format: Microsoft Word
  • Views: 1K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Electrical Engineering
Project ID ELE0380
Fee ₦5,000 ($14)
No of Pages 108 Pages
Format Microsoft Word

Related Works

Adding to the requirement and need for power supply for day to day activities, it is therefore a necessity to design the power system to maintain minimal technical losses in the network, because most of our system component lack sufficient reactive power ability, this mean that the penetration of distributed generation (DG) will give way to reduce... Continue Reading
Adding to the requirement and need for power supply for day to day activities, it is therefore a necessity to design the power system to maintain minimal technical losses in the network, because most of our system component lack sufficient reactive power ability, this mean that the penetration of distributed generation (DG) will give way to reduce... Continue Reading
ABSTRACT The next-generation mobile network will support terminal mobility, personal mobility, and service provider portability, making global roaming seamless. A location-independent personal telecommunication number (PTN) scheme is conducive to implementing such a global mobile system. However, the nongeographic PTNs coupled with the anticipated... Continue Reading
ABSTRACT The next-generation mobile network will support terminal mobility, personal mobility, and service provider portability, making global roaming seamless. A location-independent personal telecommunication number (PTN) scheme is conducive to implementing such a global mobile system. However, the nongeographic PTNs coupled with the anticipated... Continue Reading
ABSTRACT The management of any economy, at any point in time is aimed at the attainment of macroeconomic objectives such as economic growth, price stability, adequate money supply, equilibrium balance of payment, equitable distribution of income and reduction in poverty... Continue Reading
The study was carried out in Tanzania Electric Supply Company (TANESCO) along  Morogoro Road, Dar -es -Salaam, Tanzania. The study focused on career development  and organizational performance. The study was limited to career development which was  characterized by management styles, succession planning, and training and organizational ... Continue Reading
ABSTRACT This research paper is about supplies department's relationship with other departments in the organization about TENESCO-Iringa. The specific study area was at the TENESCO main store section. The study was aimed to examine the issues that exist in the supplies department relationship with other departments at TENESCO - Iringa, and hoe... Continue Reading
ABSTRACT The study was carried out in Tanzania Electric Supply Company (TANESCO) along Morogoro Road, Dar -es -Salaam, Tanzania. The study focused on career development and organizational performance. The study was limited to career development which was characterized by management styles, succession planning, and training and organizational... Continue Reading
IN NIGERIA ABSTRACT One of the biggest issues Nigeria is grappling with, apart from systemic corruption, is that of the perennial struggle among the various regions and ethnic groups that make up the country for power at the centre or federal level. If it is not... Continue Reading
ABSTRACT One of the biggest issues Nigeria is grappling with, apart from systemic corruption, is that of the perennial struggle among the various regions and ethnic groups that make up the country for power at the centre or federal level. If it is not... Continue Reading
Call Us
whatsappWhatsApp Us