LEVELIZED COST OF ELECTRICITY (LCOE) FOR SOLAR BUILDING INTEGRATED PHOTOVOLTAIC (BIPV) SYSTEM

  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0286
  • Access Fee: ₦5,000 ($14)
  • Pages: 23 Pages
  • Format: Microsoft Word
  • Views: 962
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Abstract

The utilization of solar energy is most concerned source in energy sector nowadays. The building integrated photovoltaic solar panels are increasingly constructed in dense urban areas because they brought  many advantages to the society along with energy saving features. However, at the same time, they raise tensions in capital investments and overall returns. In this project, the BIPV systemis integrated on a multi-stair building consists of 6 floors, this building is located in Mogadishu, Somalia. The energy demand of  the building is calculated also the power demand of the building is found to be 31 kW and average daily  solar irradiation of this place is 4.8 kWh/m2. The design of the project is carried out to show the connection of the solar panels. The total energy generated by BIPV system over 25 years is evaluated. In the report the Levelized Cost of Electricity (LCOE)of the BIPV system is calculated by considering all parameters  related to LCOE. the electricity tariff of Somalia is also found to compare that the project meets grid parity or not, the result of thatcomparison is shown. The income sources of the project including the power  delivery cost, transmission line cost is also considered. The result and figures are shown in this project.

LEVELIZED COST OF ELECTRICITY (LCOE) FOR SOLAR BUILDING INTEGRATED PHOTOVOLTAIC (BIPV) SYSTEM
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0286
  • Access Fee: ₦5,000 ($14)
  • Pages: 23 Pages
  • Format: Microsoft Word
  • Views: 962
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Electrical Engineering
Project ID ELE0286
Fee ₦5,000 ($14)
No of Pages 23 Pages
Format Microsoft Word

Related Works

Abstract The utilization of solar energy is most concerned source in energy sector nowadays. The building  integrated photovoltaic solar panels are increasingly constructed in dense urban areas because they brought   many advantages to the society along with energy saving features. However, at the same time, they raise  tensions in capital... Continue Reading
CHAPTER ONE: INTRODUCTION 1 Background of the Study 1 Statement of the Problem 6 Objectives of the Study 7 Justification for the Study 8 Scope and Limitations of the Work 9 Scope 9 Limitations 9 CHAPTER TWO: LITERATURE REVIEW 10 2.1 Small Hydropower Systems 10 2.1.1 Types of Hydroelectricity Generation 13 2.1.1.1 Conventional Hydroelectricity 13... Continue Reading
CHAPTER ONE: INTRODUCTION 1 Background of the Study 1 Statement of the Problem 6 Objectives of the Study 7 Justification for the Study 8 Scope and Limitations of the Work 9 Scope 9 Limitations 9 CHAPTER TWO: LITERATURE REVIEW 10 2.1 Small Hydropower Systems 10 2.1.1  Types of Hydroelectricity Generation 13 2.1.1.1 Conventional Hydroelectricity 13... Continue Reading
  ABSTRACT The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data was through the use of questionnaire administered to construction professionals in Nigerian construction industry. Seventy questionnaires were... Continue Reading
ABSTRACT PV modules exhibit a point at which its power is maximum; this point is called Maximum Power Point (MPP). Due to changes in weather conditions, the MPP changes and the PV module efficiency. Specifically, temperature and irradiance are the parameters that affect the solar panel characteristic properties. This project describes and... Continue Reading
Abstract This project work centered on construction of 12V/10A solar charge controller that is needed in photovoltaic system to safely charge regulate and discharge of sealed lead acid battery through DC load. Solar charge controller is devices that regulate solar photovoltaic power and prevent overcharging, over discharging or overflow of current... Continue Reading
CHAPTER ONE INTRODUCTION 1.1 Background Information Electricity is a general term comprising of a variety of phenomena resulting from the presence and flow of electric charge. These include many phenomena, such as lightning,... Continue Reading
Abstract This project work centered on construction of 12V/10A solar charge controller that is needed in photovoltaic system to safely charge regulate and discharge of sealed lead acid battery through DC load. Solar charge controller is devices that regulate solar photovoltaic power and prevent overcharging, over discharging or overflow of current... Continue Reading
CHAPTER ONE INTRODUCTION 1.1Background Information Electricity is a general term comprising of a variety of phenomena resulting from the presence and flow of electric charge. These include many phenomena, such as lightning, static... Continue Reading
ABSTRACT  This study on the integrated solar and hydraulic jump enhanced waste stabilization pond (ISHJEWSP) is aimed at determining the effect of variations in solar radiation, hydraulic jump, hydro-kinematic factors and pond geometry, on the treatment efficiency of wastewater in the ISHJEWSP. An equation to account for these effects was... Continue Reading
Call Us
whatsappWhatsApp Us