ABSTRACT
This project present a practical demonstration of how to carryout the wiring of a two bedroom bungalow, using PVC conduit system. In recent times surface wiring is gradually giving way to conduit wiring where much of the cable are concealed.
PVC pipes are used because of it cost friendliness, compared to metal conduit. In carryout this construction a careful attention is given to the IEF regulations. Calculations are made for current consumption, space factor, diversity factors and other necessary consideration that guarantees safely of material and personnel. 
  
TABLE OF CONTENT 
Title Page 
Litter of Transmittal 
Release Page 
Approval Page 
Dedication 
Acknowledgement
Abstract 
Preface 

CHAPTER ONE
1.0INTRODUCTION  
1.1Types of Conduit System 
1.2Uses and Advantages
1.3Choice of Conduit 
1.4Materials Used 
1.5I.E.E Regulation 
 
CHAPTER TWO
2.0REVIEW OF COMPOUND UNITS 
2.1Accessories 
2.2Circuit Diagram of Lighting, Ring and Consumer Control Unit.
2.3Table of Space Factors 
2.4Load Schedule
2.5Rating Factor 

CHAPTER THREE
3.0Construction Procedure
3.1Conduit Installation 
3.2Conduit Capacity 
3.3Wiring System 
3.4Conduit Wiring 
3.5Building Plan with Design of Electrical Wiring Systems    
3.6Layout Diagram of P.V.C Conduit 

CHAPTER FOUR
4.0Operation and Testing 
4.1Verification of Polarity Test 
4.2Insulation Test
4.3Earthling Test
4.4 Types of Earth Electrode 
4.5.Circuit Breaker 
4.6Fuses 
4.7Calculation Under Diversity 
4.8Durability
4.9Safety 
4.9.1Applications 

CHAPTER FIVE 
5.0Conclusion 
5.1Recommendation 
5.2Bill of Quantity  
5.3Bibliography  

CONSTRUCTION OF PVS CONDUIT WIRING SYSTEM OF TWO BEDROOM BUNGALOW
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Electrical Engineering
  • Project ID: ELE0147
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 51 Pages
  • Methodology: Scientific
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.5K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Electrical Engineering
Project ID ELE0147
Fee ₦5,000 ($14)
Chapters 5 Chapters
No of Pages 51 Pages
Methodology Scientific
Reference YES
Format Microsoft Word

Related Works

STRUCTURAL DETAILING IN REINFORCED CONCRETE OF A THREE BEDROOM DETACH DUPLEX, IN AZUIYIOKWU ABAKALIKI EBONYI STATE PREFACE In structural detailing, the project is initiated by the structural engineer. The architectural drawings are prepared by the architect to the required scale and specification given to him by the client. The structural engineer... Continue Reading
STRUCTURAL DETAILING IN REINFORCED CONCRETE OF A THREE BEDROOM DETACH DUPLEX, IN AZUIYIOKWU ABAKALIKI EBONYI STATE PREFACE In structural detailing, the project is initiated by the structural engineer. The architectural drawings are prepared by the architect to the required scale and specification given to him by the client. The structural engineer... Continue Reading
PREFACE In structural detailing, the project is initiated by the structural engineer. The architectural drawings are prepared by the architect to the required scale and specification given to him by the client. The structural engineer designs the structural frame work of the building and specification required such as slab, beam, column and... Continue Reading
ABSTRACT Renovation, a term most commonly associated with buildings is known to be the act or process of improving the existing condition of a broken, damaged or outdated structure. It is the process of restoring to a good condition or making new again a building structure currently in a bad state. The concept of renovation as it relates to... Continue Reading
        TABLE OF CONTENT Title page Approval page Dedication Acknowledgement CHAPTER ONE – INTRODUCTION Background of problem Structure of the problem Objective of the study Scope and limitation Importance of the study Definition of terms Design of the system Layout for... Continue Reading
The design, construction and test on a two station simple intercom system CHAPTER ONE: INTRODUCTION 1.1     INTRODUCTION / BACKGROUND Human to human communication is an essential part of our every day activities. Advances in communication technology have enabled any-time-anywhere connection between people. There are a wide variety of devices... Continue Reading
Abstract The aim of this work is to characterize properties and microstructure of stainless steel used as a coating on welding of carbon steel sheets. Two carbon steel plates were set as the metal base and the stainless steel coating was applied on the weld bead. The applied process used was the submerged arc welding (SAW) and tests were carried... Continue Reading
Abstract The aim of this work is to characterize properties and microstructure of stainless steel used as a coating on welding of carbon steel sheets. Two carbon steel plates were set as the metal base and the stainless steel coating was applied on the weld bead. The applied process used was the submerged arc welding (SAW) and tests were carried... Continue Reading
ABSTRACT This project which is on the design and fabrication of a two face gas burner is a brief exploration on the various ways and means of designing, construction, operating the two face gas burner, putting cost into consideration for economic advantage. Herein are brief information and literature on gas... Continue Reading
ABSTRACT The project work is on the design and construction of automatic two lane traffic light control. This system is based on digital electronics. It employs an astable multivibrator which is the clock generator that sends the clock into a time sequencing generator using a decade counter with ten (10) decodes output that has it’s binary... Continue Reading
Call Us
whatsappWhatsApp Us