THE DESIGN AND IMPLEMENTATION OF COMPUTERIZED PERSONNEL MANAGEMENT SYSTEM (A CASE STUDY OF PROJECT DEVELOPMENT INSTITUTE PRODA)

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU2563
  • Access Fee: ₦5,000 ($14)
  • Pages: 58 Pages
  • Format: Microsoft Word
  • Views: 628
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853
ABSTRACT
 
PRODA is a research and development centre based in Enugu.
Personnel management system deals with the general operation procedure and flow of information about people working in the organization, in this case, PRODA as well their future personnel needs. This system is concerned primarily with the basic functions or recruitment training and development benefits and welfare, the achievement of personnel policies and procedures.
Computerized system poses high speed of processing precision, storage, its versatility and high retrieval system makes possible the completion of tasks that could never been achieved with manual system because of the difficulty of completing them on time for the results to be useful.
Therefore in the project, I will carry out among other things the feasibility study of existing system, design and develop, a new system implementable in any given Dbase4.   

TABLE OF CONTENTS

Title Page
Certification
Dedication
Acknowledgement
Abstract
Organization of Work
Table of Figure
Table of contents 

CHAPTER ONE
1.0Introduction
1.1Statement of the problem 
1.2Purpose of the Study
1.3Aims and Objectives of the study
1.4Scope of the study
1.5Limitation of the study  
1.6Assumptions 
1.7Definition of terms

 CHAPTER TWO
2.0Literature Review 

CHAPTER THREE
3.1Description and Analysis of the existing system
3.2Fact finding methods
3.3Objective of the existing system
3.4Input, process, and output analysis
3.5Problems of the existing system
3.6Justification of the new system

CHAPTER FOUR
4.0Design of the new system 
4.1Output specification and Design
4.2Input specification and design
4.2File Design 
4.3Procedure chart
4.5System flowchart
4.4System requirements

CHAPTER FIVE
5.1Implementation 
5.2Program design
5.3Program flowchart
5.4Pseudocodes

CHAPTER SIX
Documentation

CHAPTER SEVEN
7.0Conclusion and Recommendation
REFERENCES

THE DESIGN AND IMPLEMENTATION OF COMPUTERIZED PERSONNEL MANAGEMENT SYSTEM (A CASE STUDY OF PROJECT DEVELOPMENT INSTITUTE PRODA)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU2563
  • Access Fee: ₦5,000 ($14)
  • Pages: 58 Pages
  • Format: Microsoft Word
  • Views: 628
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Computer Science
Project ID CPU2563
Fee ₦5,000 ($14)
No of Pages 58 Pages
Format Microsoft Word

Related Works

ABSTRACT PRODA is a research and development centre based in Enugu. Personnel management system deals with the general operation procedure and flow of information about people working in the organization, in this case, PRODA as well their future personnel needs. This system is concerned primarily with the basic functions orf recruitment training... Continue Reading
ABSTRACT   PRODA is a research and development centre based in Enugu. Personnel management system deals with the general operation procedure and flow of information about people working in the organization, in this case, PRODA as well their future personnel needs. This system is concerned primarily with the basic functions or recruitment training... Continue Reading
PRODUCTION METHODS AND PROBLEMS OF PRODA (A CASE STUDY BY PRODA ENUGU). ABSTRACT A question might be asked as to why I chose to study and write on the production methods and problems of PRODA. I would like to point out the fact that I was motivated to take up this topic so as to provoke mire academic discussion as a way and means of providing a... Continue Reading
INTERNAL AUDIT CONTROL IN GOVERNMENT ESTABLISHMENT (A CASE STUDY FO PROJECT DEVELOPMENT INSTITUTE (PRODA), ENUGU). ABSTRACT There is no doubt that anything that is not controlled is either wasted or mismanaged and on this premise, the importance of internal audit in controlling operations both in the public and private sector organizations cannot... Continue Reading
ABSTRACT There is no doubt that anything that is not controlled is either wasted or mismanaged and on this premise, the importance of internal audit in controlling operations both in the public and private sector organizations cannot be overemphasized. Generally, Internal Audit Control in Government establishments is very weak and in particular,... Continue Reading
ABSTRACT  There is no doubt that anything that is not controlled is either wasted or mismanaged and on this premise, the importance of internal audit in controlling operations both in the public and private sector organizations cannot be overemphasized.  Generally, Internal Audit Control in Government establishments is very weak and in... Continue Reading
ABSTRACT The world is dynamic/versatile where nothing remains the same for too long. Information storage and retrieval was done manually decades ago. Today, it is been phased gradually in all areas of our day to day activities everything is undergoing computerization so there is need for auditing personnel auditing. In recognition, the work is... Continue Reading
ABSTRACT The world is dynamic/versatile where nothing remains the same for too long. Information storage and retrieval was done manually decades ago. Today, it is been phased gradually in all areas of our day to day activities everything is undergoing computerization so there is need for auditing personnel auditing. In recognition, the work is... Continue Reading
THE (A CASE STUDY OF PROJECT DEVELOPMENT INSTITUTE PRODA) ABSTRACT PRODA is a research and development centre based in Enugu. Personnel management system deals with the general operation procedure and flow of information about people working in the organization, in this case,... Continue Reading
CHAPTER ONE 1.1 INTRODUCTION       In most organizations particularly business organizations, most of what goes on consists largely of transactions. A transaction is a recorded event having to do with routine business activities. This includes everything concerning the product or service in which the organization is engaged: production,... Continue Reading
Call Us
whatsappWhatsApp Us