DESIGN AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY)

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU2243
  • Access Fee: ₦5,000 ($14)
  • Pages: 52 Pages
  • Format: Microsoft Word
  • Views: 615
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT
This project will be centered on the production control system. This production control system being operated manually ad due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination of document after which analysis will be made and a computerized procedure recommended. This project will also suggest how to successfully implement the computerized procedure and to overcome the obstacle that would hinder the successful implementation of the system. The new system was developed using visual basic 6.0 and access database. This language was chosen because of its easy syntax and features for developing windows based applications.

TABLE OF CONTENTS
Title page 
Certification page 
Dedication 
Acknowledgment 
Approval page 
Table of contents 
Abstract 

CHAPTER ONE
Production control system of study 
1.0Historical background 
1.1Aims and objective 
1.2Scopes of study 
1.3Limitation of the study 
1.4Significance of the study 
1.5Definition of terms 

CHAPTER TWO
REVIEW OF RELATED LITERATURE 
2.0Introduction
2.1Basic control procedure 
2.2Problem of control 

CHAPTER THREE
SYSTEM INVESTIGATION AND SYSTEM ANALYSIS 
3.0Introduction 
3.1Description of the existing system 
3.1.2Materials for the production 
3.2Monitoring and control terms 
3.3Method of data collection
3.3The structure of the existing firm
3.4The objective of the existing of system 
3.5The input and output format 

CHAPTER FOUR
DESIGN, DEVELOPMENT AND IMPLEMENTATION
4.0Introduction 
4.1Output specification 
4. 1Data base life design and specification 
4.2Input specification
4.3System flowchart
4.4Program design
4.5Program flowchart 
4.6Program code
4.7System requirement 
4.8System implementation 
4.9Program documentation 

CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATION 
5.1Summary 
5.2Conclusion 
5.3Recommendation 
References 


DESIGN AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM (A CASE STUDY OF 7UP BOTTLING COMPANY)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU2243
  • Access Fee: ₦5,000 ($14)
  • Pages: 52 Pages
  • Format: Microsoft Word
  • Views: 615
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Computer Science
Project ID CPU2243
Fee ₦5,000 ($14)
No of Pages 52 Pages
Format Microsoft Word

Related Works

ABSTRACT This project will be centered on the production control system. This production control system being operated manually ad due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination ofdocumentafter which... Continue Reading
ABSTRACT This project will be centered on the production control system. This production control system being operated manually ad due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination of document after... Continue Reading
ABSTRACT This project will be centered on the production control system. This production control system being operated manually and due to the numerous problem encountered and over payment. A design was taken to computerized in order to check this problem the problem were identified after series of interviews and examination of document after... Continue Reading
MARKET SEMENTATION AS AN EFFICIENT TOOL OF ACHIEVING INCREASED MARKET SHARE (A CASE STUDY OF 7UP BOTTLING COMPANY PLC ABA). ABSTRACT This main aim of business is to seek, attract and retain customers who will use the company various products to meet their needs or solve their problems. Successful service organization must therefore understand how... Continue Reading
THE IMPACT OF SOCIAL RESPONSIBILITY ON CORPORATE PROFITABILITY (A CASE STUDY OF 7UP BOTTLING COMPANY 9TH MILE ENUGU) ABSTRACT In the past, 7up Bottling Company 9th Mile Enugu separated sally to maximize profit in order to maximize the shareholders wealth. This objective has been subject to criticisms by these who strongly believed that, it create... Continue Reading
ABSTRACT This project (research) work is titled “Effect of Materials Management on resource utilization in Organization”. The researcher carried on investigation to determine the impact of effect of materials management on resource utilization in organization as it affect organization’s productivity and output in the field of... Continue Reading
ABSTRACT Due to irregularities often encountered in the public enterprises and private establishments, this research project is designed for the study of the internal auditor in stock taking especially as a case study of 7up bottling company plc 9th mile corner Enugu. Internal auditing and stocktaking in recent time has proved to be a hard nut... Continue Reading
TABLE OF CONTENTS Cover page - - - -          -           -          -            - - i Declaration - - - - - - - - - ii Certification - - - - - - - - - iii Dedication - - - - - - - - - iv Acknowledgements - - - - - - - - v Table of Contents - - - - - - - - vi Abstract - - - - - - - - - ix Appendices - - - - - - - - - x... Continue Reading
ABSTRACT Due  to  irregularities often  encountered in the public  enterprises  and  private  establishments,  this  research  project  is  designed  for  the study  of  the  internal  auditor  in stock taking  especially as  a case study  of  7up  bottling  company  plc  9th  mile  corner Enugu.  Internal auditing... Continue Reading
TABLE OF CONTENTS Cover page----          -           -          -            --i Declaration ---------ii Certification ---------iii Dedication---------iv Acknowledgements--------v Table of Contents--------vi Abstract---------ix Appendices---------x CHAPTER ONE: INTRODUCTION 1.1Background to the Study-------1 1.2Statement of... Continue Reading
Call Us
whatsappWhatsApp Us