DESIGN AND IMPLEMENTATION OF DAYCARE MANAGEMENT SYSTEM

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1025
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

child daycare system is the care of a child during the day by a person other than the child’s

legal guardian, basically performed by someone outside the child’s immediate family. it is

typically ongoing for a specific period, such as parents work time. the system will be used to

register a child, monitor and verify who drops and picks the child, log of child’s activity,

parents/guardian details, parents will be able to update a child’s details (e.g. record allergy,

drug administration time if any etc.). it can also take a formal structure with education, child

development and discipline.

viii

TABLE OF CONTENTS

Title Page - - - - - - - - - - i

Cover Page - - - - - - - - - - ii

Declaration - - - - - - - - - - iii

Certification - - - - - - - - - - iv

Approval - - - - - - - - - - v

Dedication - - - - - - - - - - vi

ABSTRACT - - - - - - - - - - VII

CHAPTER ONE: INTRODUCTION

1.1 Overview - - - - - - - - - 1

1.2 Background and Motivation - - - - - - - 1

1.3 Statement of Problem - - - - - - - - 2

1.4 Aim and Objective - - - - - - - - 2

1.5 Significance of the Project - - - - - - - 2

1.6 Risk Assessment - - - - - - - - 3

1.7 Scope/Project Organization - - - - - - - 3

CHAPTER TWO: LITERATURE REVIEW

2.0 Overview - - - - - - - - - 4

2.1 Introduction - - - - - - - - - 4

2.2 Types of day care - - - - - - - - 5

2.3 Related Work - - - - - - - - - 5

2.3.1 EZcare childcare management software - - - - - 6

2.3.2 The Pre School Partner - - - - - - - 6

2.3.3 Power School Kindergarten System - - - - - - 6

2.3.4 Proposed solution - - - - - - - - 7

ix

2.4 Summary - - - - - - - - - 7

CHAPTER THREE: REQUIREMENTS ANALYSIS AND DESIGN

3.1 Overview - - - - - - - - - 8

3.2 Proposed Methodology - - - - - - - 8

3.3 Approach to chosen Methodology - - - - - - 10

3.4 Tool and Techniques - - - - - - - - 10

3.5 Requirement Analysis - - - - - - - 10

3.6 Requirement specifications - - - - - - - 11

3.6.1 Functional Requirements Specification - - - - - - 11

3.6.2 Non-functional Requirement specifications - - - - - 12

3.7. Application Architecture - - - - - - - 12

3.7.1 Use Case Diagram - - - - - - - - 14

3.7.2 Class Diagram- - - - - - - - - 17

3.7.3 Database Design - - - - - - - - 18

3.7.4 Dataflow Diagram (DFD) - - - - - - - 19

3.7.5 Activity Diagram - - - - - - - - 21

3.6 Summary - - - - - - - - - 22

CHAPTER FOUR: IMPLEMENTATION AND TESTING

4.1 Overview - - - - - - - - - 23

4.2 Development tools and technologies - - - - - - 23

4.3 Implementation Problems - - - - - - - 23

4.4 Overcoming Implementation Problems - - - - - 24

4.5 Testing - - - - - - - - - 25

4.5.1 Test Plans - - - - - - - - - 25

4.5.2 Test Traceability Matrix - - - - - - - 26

4.6 Test Report Summary - - - - - - - - 28

4.7 User Guide - - - - - - - - - 28

4.8 Summary- - - - - - - - - - 28

x

CHAPTER FIVE: DISCUSSION, CONCLUSION, AND RECOMMENDATIONS

5.1 Overview - - - - - - - - - 29

5.2 Evaluation - - - - - - - - - 29

5.2.1 Objective Assessment- - - - - - - 29

5.3 Limitations and challenges - - - - - - - 29

5.4 Future Enhancements - - - - - - - - 30

5.5 Recommendation - - - - - - - - 30

5.6 Conclusion - - - - - - - - - 30

REFERENCES - - - - - - - - - 31

APPENDICES - - - - - - - - - 32

DESIGN AND IMPLEMENTATION OF DAYCARE MANAGEMENT SYSTEM
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU1025
  • Access Fee: ₦5,000 ($14)
  • Pages: 73 Pages
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Computer Science
    Project ID CPU1025
    Fee ₦5,000 ($14)
    No of Pages 73 Pages
    Format Microsoft Word

    Related Works

    The state of the traffic system is influenced by travel demand and traffic supply characteristics. Travel demand is defined by Roess et al. (1998) as the number of vehicles or people that desire to travel past a point during a specified... Continue Reading
    TABLE OF CONTENTS CHAPTER ONE:  INTRODUCTION 1.1 Background of the Study 1.2 Statement of Problem   1.3 Aim and Objectives Scope of the Project Significance of the Study Research Methodology Project Feasibility and Plan Economic Feasibility Schedule Feasibility Organization of Subsequent Chapters CHAPTER TWO: LITERATURE REVIEW 2.1 Introduction... Continue Reading
    TABLE OF CONTENTS CHAPTER ONE:  INTRODUCTION 1.1 Background of the Study 1.2 Statement of Problem   1.3 Aim and Objectives Scope of the Project Significance of the Study Research Methodology Project Feasibility and Plan Economic Feasibility Schedule Feasibility Organization of Subsequent Chapters CHAPTER TWO: LITERATURE REVIEW 2.1 Introduction... Continue Reading
    CHAPTER ONE  INTRODUCTION  1.1       Background of Study  The state of the traffic system is influenced by travel demand and traffic supply characteristics. Travel demand is defined by Roess et al. (1998) as the number of vehicles or people that desire to travel past a point during a specified period. The main traffic supply... Continue Reading
    ABSTRACT The study was carried out to verify all the manual processes involved in patient management system and to seek for a way of automating the system for effective operations. Since, there is continuous moves towards technological advances that enhanced productivity of... Continue Reading
    TABLE OF CONTENT Approval/Certification                                                                                    ii... Continue Reading
    ABSTRACT The study was carried out to verify all the manual processes involved in patient management system and to seek for a way of automating the system for effective operations. Since, there is continuous moves towards technological advances that enhanced productivity of labour and free human beings of task done more economically by machines.... Continue Reading
    ABSTRACT The study was carried out to verify all the manual processes involved in patient management system and to seek for a way of automating the system for effective operations. Since, there is continuous moves towards technological advances that enhanced productivity of labour and free human beings of task done more economically by machines.... Continue Reading
    ABSTRACT Nigeria is a seller loving country as football is being played all levels in a curbside there are venous farms representing various clubs in Nigeria. Club scale is a team sports played by eleven (ii) players (male or females) a earth such side of the opposites team. One of each team must be the goal keeper. Usually the gave may not, if... Continue Reading
    ABSTRACT Nigeria is a seller loving country as football is being played all levels in a curbside there are venous farms representing various clubs in Nigeria. Club scale is a team sports played by eleven (ii) players (male or females) a earth such side of the opposites team. One of each team must be the goal keeper. Usually the gave may not, if... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us