AUTOMATED OF STOCK CONTROL AND SALES SYSTEM

  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0907
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 74 Pages
  • Methodology: Nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.2K
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

CHAPTER ONE

1.0  INTRODUCTION

1.1  BACKGROUND OF THE STUDY

In business reactions, stocks are the assets of the organization in terms of materials, goods products that need to be replenished at its re-ordered level. Therefore, stock control process is the operation of continuously arranging receipts and documents relating to the materials to ensure that stock balance are adequate to support the current rate of consumption with one regards to economy. There are some problems associated with stock process of organizations, which include inadequate control of information, that is, there was no free flow of information relating to the stock, also accuracy in the financial information status, and as a result of these problems therefore calls for the computerized approach to stock keeping, monitoring and sales analysis.

1.2  STATEMENT OF THE PROBLEM

The following are the specification statement of the problem that necessitated the project:

(a)  Customers time is wasted during search for an item in stock.

(b)  Fraud and arithmetic error normally occurs in the use of bin card.

Therefore, using a computerized approach for stock keeping, monitoring and sales analysis, it will helps in reducing customer's complains.

1.3  PURPOSE OF THE PROJECT

Here are objectives of the project:

(a)  To reduce the lost of processing each unit of item

(b)  To ensure that goods in stock are made know to the approach department

(c)  To ensure that stock are replenished at re-order level as at when due.

1.4  SIGNIFICANCE OF THE PROJECT

(a)  It point out the important of operating research in management secession.

(b)  It makes the analysis of goods in stock faster and gasser management control.

(c)  It makes decision making at managerial level easy and faster

1.5  SCOPE OF THE PROJECT 

The following are the scope of the project:

(a)  It considers how the customer consumes goods.

(b)  It cores the sues record of stock in store

(c)  It considers how goods are collected and received the store

1.6  LIMITATIONS OF THE PROJECT

Here are some limitations of the project:

(a)  Lack of materials

(b)  Time constraints

(c)  In ability to get the data to be in time.

(d)  Power failure

1.7  DEFINITION OF TERMS

(1)  Stock Record: These are the documents which record, from day to day, full particulars of individual's receipts, and issues balances of stock.

(2)  Stock Taking/Checking: This is the process of physical verification of the quantities and condition of goods.

(3)  Re-Order level: This is the quantity between the maximum and minimum stock figuring at which it is necessary imitate Porsches requirement for new supplies.

(4)  Maximum Stock Level: Is the level at which stock should not be allowed to increase. In fixing this level, the best possible excepted conditions are used.

(5)  Minimum Stock Level: Is the level at which stock should not be allowed to full. The level must be wait - watched with cure because it is an indication of real change of "Stock" but which may result into production of sales stoppage.

AUTOMATED OF STOCK CONTROL AND SALES SYSTEM
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Computer Science
  • Project ID: CPU0907
  • Access Fee: ₦5,000 ($14)
  • Chapters: 5 Chapters
  • Pages: 74 Pages
  • Methodology: Nil
  • Reference: YES
  • Format: Microsoft Word
  • Views: 1.2K
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

500
Leave a comment...

    Details

    Type Project
    Department Computer Science
    Project ID CPU0907
    Fee ₦5,000 ($14)
    Chapters 5 Chapters
    No of Pages 74 Pages
    Methodology Nil
    Reference YES
    Format Microsoft Word

    Related Works

    INTRODUCTION 1.0 Introduction Stock management is the function of understanding the stock mixed of a company and the different demands on that stock. The demands are influenced by both external and internal factors and are balanced by the creation of purchase order requests to keep supplies at a reasonable or prescribed level. Stock in the store... Continue Reading
    This work is on design and Construction of Automated door security system with GSM notification. Is an electrical Electronics Engineering Project.... Continue Reading
    Abstract This paper presents an innovative access control system, based on human detection and path analysis, to reduce false automatic door system actions while increasing the added values for security applications. The proposed system will first ask the visitor for a password... Continue Reading
    CHAPTER ONE 1.0 INTRODUCTION An inventory control system contains a list of orders to be filled and then prompts workers to pick the necessary items, and provides them with packaging and shaping information, inventory control may be used to automate a sales order fulfillment process and also manage in and outward material of hardware. Automation... Continue Reading
    DESIGN AND IMPLEMENTATION OF AN AUTOMATED INVENTORY CONTROL SYSTEM FOR A MANUFACTURING ORGANISATION (A CASE STUDY OF NIGERIAN BREWERIES PLC, ENUGU) ABSTRACT This research work is concise and generally summarizes the activities duly carried out in the design and implementation of an automated inventory control system for a manufacturing... Continue Reading
    ABSTRACT This research work is concise and generally summarizes the activities duly carried out in the design and implementation of an automated inventory control system for a manufacturing organization. The system is designed to efficiently handle the movement and tracking of goods through the replacement of human workers by technology. The... Continue Reading
    ABSTRACT The flagrant rate of plane crash in the country toady has given much concern and desire to carry out this “Design and Implementation of a whether fore-casting package for aviation industries”. The researcher having been a student for some years now was disturbed by the rate of plane crash and the rate at which lives and properties... Continue Reading
    ABSTRACT The  flagrant rate of plane crash in the country toady has given much concern and desire to carry out this “Design and Implementation of a whether fore-casting package for aviation industries”. The researcher having been a student for some years now was disturbed by the rate of plane crash and the rate at which lives and properties... Continue Reading
    DESIGN AND IMPLEMENTATION OF A COMPUTERISED QUALITY CONTROL SYSTEM IN STOCK PRODUCT (A CASE STUDY OF ANAMMCO NIG. LTD EMENE ENUGU ) ABSTRACT The purpose of the study is to computerize quality control system in production (A case study of Anammco Nig. Ltd Enugu) and to develop a computer packages whereby the technique observed from the manual... Continue Reading
    ABSTRACT The purpose of the study is to computerize quality control system in production (A case study of Anammco Nig. Ltd Enugu) and to develop a computer packages whereby the technique observed from the manual method can be improved on. It is a known feet that the manual method of quality control in production has been associated with lots of... Continue Reading
    Call Us
    Get this work
    whatsappWhatsApp Us