GEOTECHNICAL INVESTIGATION OF CAUSES OF ROAD FAILURES IN IKOLEAREA

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0207
  • Access Fee: ₦5,000 ($14)
  • Pages: 111 Pages
  • Format: Microsoft Word
  • Views: 999
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

The condition and adequacy of the highway is often _judged by the smoothness or roughness of the pavement, deficient pavement conditions can result in increased user costs and travel delays, unnecessary braking and fuel consumption, vehicle repairs and probability of increased crashes. Pavement failure is usually a result of several factors which includes traffic impacts on the road, environmental factors, poor maintenance culture, geotechnical characteristics of the subgrade and other road construction material, to mention a few. In this study, four failed segments of roads in the !kale local government area were selected for geotechnical studies. The following processes were cal'l'ied out: reconnaissance survey, interview sessions with relevant parties, site observations and geotechnical laboratory tests of road subgrade soil in accordance to B.S, 1377. The geotechnical investigation involved grain size analysis, atterbergs limits, West African compaction test, specific gravity determination, natural moisture content determination, permeability tests and california bearing ratio (CBR) test. Compaction test showed a maximum dry density range of2.0kg/m 3 to I .86kg/m3 and an optimum moisture content range between I 0.5% and 15%. The values of the California Bearing Ratio (CBR) of un-soaked soil samples were within the range of 38.4% and 80.8%. Furthermore, the sieve analysis revealed that a substantial percentage of the soil samples passed through the No, 200 BS sieve suggesting the soil consist mostly of silty clayey material, which translates to a fair material rating according to AASHTO design standard ( 1986). The permeability test result indicates tile samples are semi-permeable soils. From the tests result analysis of the Ikole-Omuo road stretch within the !kale local Government area it appears the subgrade materials under the failed and unfailed segments of the road is suitable according to AASHTO design standard. Therefore, rt is imperative that sustainable solutions addressing the issue of traffic impacts, adequate drainage provision, environmental factors and quality control should be focused on, to curtail the incessant occurrence of road failures on the lkole Omuo road stretch

GEOTECHNICAL INVESTIGATION OF CAUSES OF ROAD FAILURES IN IKOLEAREA
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0207
  • Access Fee: ₦5,000 ($14)
  • Pages: 111 Pages
  • Format: Microsoft Word
  • Views: 999
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Civil Engineering
Project ID CVE0207
Fee ₦5,000 ($14)
No of Pages 111 Pages
Format Microsoft Word

Related Works

ABSTRACT This project was undertaken to determine the geotechnical properties of soils along Appleton/Zoo road. A total of nine (9) samples, both disturbed and undisturbed, were collected at chainages - 0+275, 0+325 and 0+525 respectively and each drilled to a depth of 1 m and at sampling depths of 0–0.3 m, 0.3–0.6 m and 0.6–1.0 m... Continue Reading
ABSTRACT This project was undertaken to determine the geotechnical properties of soils along Appleton/Zoo road. A total of nine (9) samples, both disturbed and undisturbed, were collected at chainages - 0+275, 0+325 and 0+525 respectively and each drilled to a depth of 1 m and at sampling depths of 0–0.3 m, 0.3–0.6 m and 0.6–1.0 m... Continue Reading
ABSTRACT This project was undertaken to determine the geotechnical properties of soils along Appleton/Zoo road. A total of nine (9) samples, both disturbed and undisturbed, were collected at chainages - 0+275, 0+325 and 0+525 respectively and each drilled to a depth of 1 m and at sampling depths of 0–0.3 m, 0.3–0.6m and 0.6–1.0 m... Continue Reading
ABSTRACT Laterites are soils that formed from the weathering of the basement complex and are rich in secondary oxides of Iron and Aluminum. It‟s red colouration is due to it‟s high iron content. Laterites are mostly found in Tropical regions which are characterized by distinct dry and wet seasons. Laterites are mainly used in the construction... Continue Reading
ABSTRACT       Metro Rail is a mass rapid transportation system and also environment friendly. It is also a modern technology for transportation. To overcome the future demand and to make a short and less time consuming transportation system, Bangladesh Government has taken this project. It is a fast and time saving transportation system which... Continue Reading
ABSTRACT Hamu - Mukasa road, just like most other roads in Kampala city has a number of defects such as potholes, cracks, ravels aggregate polishing, and many more accompanied by lack of drainage which in turn facilitate the high traffic congestion and delays, especially at peak demand periods in addition to comfortability and unsafeness of the... Continue Reading
ABSTRACT One of the major problems facing the country is pavement failure. It is the concern of the Institute of Management and Technology (IMT) authorities to carryout a case study of pavement failure along Hillview off ESBS Road Enugu. The investigation show that... Continue Reading
ABSTRACT One of the major problems facing the country is pavement failure. It is the concern of the Institute of Management and Technology (IMT) authorities to carryout a case study of pavement failure along Hillview off ESBS Road Enugu. The investigation show that the pavement failed both structural and functionally taking into consideration. The... Continue Reading
ABSTRACT This project focuses on investigation into the causes and Remedial measures of pavement failure at Ganmon-Afon road Kwara State. The measuring of pavement and types of pavement. Types of pavement failures causes of pavement were studied and possible solution were provided. Form the investigation causes of pavement failure were identified... Continue Reading
ABSTRACT One of the major problems facing the country is pavement failure. It is the concern of the Institute of Management and Technology (IMT) authorities to carryout a case study of pavement failure along Hillview off ESBS Road Enugu. The investigation show that the pavement failed both structural and functionally taking into consideration. The... Continue Reading
Call Us
whatsappWhatsApp Us