ESTIMATION OF BRIDGE SCOUR USING HEC 18 AND BD 97/12(A CASE STUDY OF TWIN BRIDGES ALONG BENIN - OFUSO - ORE - AJEBANDELE- SHAGAMU DUAL CARIAGEWAY IN ONDO STATE)

  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0194
  • Access Fee: ₦5,000 ($14)
  • Pages: 110 Pages
  • Format: Microsoft Word
  • Views: 544
  • Report This work

For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

ABSTRACT

A bridge is a structure built to span physical obstacles without closing the way underneath such as a body of water, valley, or road, for the purpose of providing passage over the obstacle. There are many different designs that each serve a particular purpose and apply to different situations. Designs of bridges vary depending on the function of the bridge, the nature of the ten-ain where the bridge is constructed and anchored, the material used to make it, and the funds available to build it. Scom occurs due to the effect of erosive action of flowing water, removing and carrying away soil material from the bed and banks of streams and from around the piers and abutments of bridges. Bridges can be adversely affected by wind, water, loads on the bridge (traffic), etc. In this project, bridge scour of an existing bridge will be estimated using two (2) bridge scour estimation manuals; BD 97/12 (the Assessment of Scour and Other Hydraulic Actions at Highway Structures), and HEC 18 (Hydraulic Engineering Circular No. 18). After.vards, an in-situ measurement of the existing scour bridge will be taken to compare which of the bridge scour estimation manual best estimate bridge scour in Nigeria. 

ESTIMATION OF BRIDGE SCOUR USING HEC 18 AND BD 97/12(A CASE STUDY OF TWIN BRIDGES ALONG BENIN - OFUSO - ORE - AJEBANDELE- SHAGAMU DUAL CARIAGEWAY IN ONDO STATE)
For more Info, call us on
+234 8130 686 500
or
+234 8093 423 853

Share This
  • Type: Project
  • Department: Civil Engineering
  • Project ID: CVE0194
  • Access Fee: ₦5,000 ($14)
  • Pages: 110 Pages
  • Format: Microsoft Word
  • Views: 544
Payment Instruction
Bank payment for Nigerians, Make a payment of ₦ 5,000 to

Bank GTBANK
gtbank
Account Name Obiaks Business Venture
Account Number 0211074565

Bitcoin: Make a payment of 0.0005 to

Bitcoin(Btc)

btc wallet
Copy to clipboard Copy text

Details

Type Project
Department Civil Engineering
Project ID CVE0194
Fee ₦5,000 ($14)
No of Pages 110 Pages
Format Microsoft Word

Related Works

ABSTRACT A bridge is a structure built to span physical obstacles without closing the way underneath such as a body of water, valley, or road, for the purpose of providing passage over the obstacle. There are many different designs that each serve a particular purpose and apply to different situations. Designs of bridges vary depending on the... Continue Reading
The purpose of the study was to investigate the importance of playing on the early  childhood education in Eldoret West District, Kenya  The specific objectives of the study were to determine the profile of the respondents in  regards to: age, gender and academic level, to investigate the importance of playing in  regards to academic... Continue Reading
CHAPTER ONE INTRODUCTION 1.1 Background of the Study One of the major problems confronting the developing countries in the process of development is the management of rapid deterioration and change in the urban areas. These changes if not well managed will impact on visual... Continue Reading
ABSTRACT The study investigated the relationship between twin deficit and manufacturing sector of Nigerian economy for the period of 34 years (1981 to 2015). The study adopted the time series data using the OLS estimation technique to analyze the data. The model was estimated using a linear specification methodology. It was discovered Current... Continue Reading
ABSTRACT The proposed Access Roads which will connect the Airport Road to the main gate of the African University of Science and Technology, Abuja, Nigeria and the proposed Bridge Housing Estate when constructed will foster broader community goals by promoting business activities within and around the University environment. Topographic data were... Continue Reading
ABSTRACT This project work was carried out in order to examine the effect of truancy on the academic performance of students in Ondo West Local Government Area of Ondo State in particular, it is... Continue Reading
ABSTRACT Indiscipline includes lawlessness; examination malpractice absenteeism etc is one of the major problems threatening our educational institution in Nigeria. The research therefore aimed at identifying... Continue Reading
Abstract This study is aimed at determining the concentration of gold in the gold ore in lujinjimubende district. Currently investing in gold mining is taken as a riskyinvestmentbecause people are not sure of the concentration of gold in lujinji and also the depth where gold concentration is high. The results of this research gave the... Continue Reading
Table of Contents Acknowledgement Declaration. Dedication iv Abstract List of Figures yiN List of Tables ix CHAPTER ONE 1 1.1 Background 1 1.2 Problem statement 3 1.3 objectives 3 1.3.1: general objective 3 1.3.2: specific objectives 3 1 .4Justification 4 1.6 Scope of the study 4 1.7 Significance of the study 4 CHAPTER TWO 5 LITERATURE REVIEW 5... Continue Reading
ABSTRACT The main of this study was to investigate the relationship of home environment and psychosocial development of preschool children in Mois-Bridge Zone, Uasin-Gishu County, Kenya. The study was guided by three specific objectives of the study: to examine the home environment (household factors and parental and family factors) of parents of... Continue Reading
Call Us
whatsappWhatsApp Us